PTAB
Advanced fields
294 decisions · 760msnewest first
  • PTAB · May 22, 2026 · IPR2024-00796 · APJ Iftikhar Ahmed · IPR · Final written decision

    Claims 1–20 are unpatentable as obvious over Nevo and Avitabile, Young and Estabrook, and Young, Estabrook-1988, and Estabrook-1989.

    RulingsFinal written decision
    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “Network LLC, 929 F.3d 1350, 1357 (Fed. Cir. 2019). On its face, the language “energy transfer signal” does not specify any restrictions on the type of system in which it is utilized, nor its characteristics. In the context of claims 1 and 11, the “energy transfer signal” is the basis on which the “switch” operates, so as to “sub-sample and transfer energy from a first electromagnetic (EM) signal.” Ex. 1001, 50:63–65, 51:56–58. Accordingly, based on the claim language, the term “energy transfer signal” need only be a signal for operating a switch to sub-sample and transfer energy from an electromagnetic signal. That is its plain and ordinary meaning.” slip op. at 15

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “’686 patent broadly includes knowledge and experience as to RF circuit design. See supra § III.B. Petitioner contends that “Nevo’s transceivers [102a/102b] are for Bluetooth and IEEE 802.11,” and that a person of ordinary skill in the art would have understood that both protocols “required down-conversion in their receivers to obtain a baseband signal.” Id. at 35 (citing Ex. 1004, 4:45–50; Ex. 1002 ¶ 118). Nevo’s disclosure would have motivated a person of ordinary skill in the art to look to Avitabile, which provides the circuit level detail for down-converters. See Ex. 1006, Abstract. Avitabile specifically provides circuitry for down-conversion in the s-band frequency range, which is in the range of Bluetooth and IEEE 802.11 (2.4 GHz). Id. at Abstract, Figs. 6, 7. Accordingly, we determine a person of ordinary skill in the art would have been motivated to look to down-converters in the range of frequency needed, and would have been motivated to combine Avitabile’s teachings with those of Nevo, with a reasonable expectation of success.” slip op. at 55

    • Expert testimonyPetitioner expert creditedPatent owner expert discountedDecided for petitioner
    Patent outcomesUS 7,483,686 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,483,686
  • PTAB · Jan 15, 2026 · IPR2025-01231 · APJ Mary C Hoffman · IPR · Institution

    The Board instituted IPR on claims 1–13 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “petition identifies all real parties in interest. 35 U.S.C. § 312(a)(2). Whether an unnamed party is a real party in interest “is a highly fact-dependent question.” See Applications in Internet Time, LLC v. RPX Corp., 897 F.3d 1336, 1351, 1360 (Fed. Cir. 2018) (“AIT”); Ventex Co., Ltd. v. Columbia Sportswear N. Am., Inc., IPR2017-00651, Paper 152 at 4–5 (PTAB Jan. 24, 2019) (precedential) (citing Worlds Inc. v. Bungie, Inc., 903 F.3d 1237, 1242 (Fed. Cir. 2018)); Consolidated Trial Practice Guide, 13 (2019), https://www.uspto.gov/sites/default/files/documents/tpgnov.pdf (CTPG). “A common consideration is whether the non-party exercised or could have exercised control over a party’s participation in a proceeding.” CTPG at 16. Other considerations include whether the non-party is funding or directing the proceeding; the non-party’s relationship with the petitioner; the non-party’s relationship to the petition itself, including the nature and/or degree of involvement in the filing; and the nature of the entity filing the petition. Id. at 17–18.” slip op. at 8

    • Skill levelSkill level board ownOther

      “person of ordinary skill in the art (“POSITA”) “would have at least a bachelor’s degree in electrical engineering or a related field and at least two years of experience with lighting technology.” Pet. 2 (citing Ex. 1017 ¶ 35). Petitioner makes additional contentions about what a POSITA would have understood. Id. (“A POSITA would understand that all types of cameras (e.g., analog and digital, photo and video) generally involve the same lighting considerations . . . . [and] that it is important to provide light that evenly illuminates the target subject or object to minimize reflected glare and shadows.”). Patent Owner contends that a POSITA would have at least: (a) a bachelor’s degree in electrical engineering, optical engineering, or a related field; (b) two years of practical experience in designing and developing lighting systems, particularly those integrated with electronic devices such as webcams or computer monitors; and (c) knowledge of user-interface considerations for consumer electronics . . . . Additional experience can substitute for education and vice versa. Prelim. Resp. 12 (citing Ex. 2036 ¶ 48). Patent Owner disputes Petitioner’s contentions regarding what a POSITA would have understood. Prelim. Resp. 12–13 (“[O]ne of ordinary skill in the art would have understood that analog and digital cameras have different operating principles and lighting requirements [and] Petitioner’s lack of appreciation for the suitability and unsuitability of different lights for different applications infects and dooms its invalidity analysis.” (citing Ex. 2036 ¶¶ 36–47)). and years of experience required for a POSITA. Pet. 2; Prelim. Resp. 12. For purposes of this Decision, we consider a person of ordinary skill in the art to have a bachelor’s degree in electrical engineering or related field and two years of practical experience in lighting technology, and that additional experience may substitute for education and vice versa, which is consistent with the level of skill reflected in the ’729 patent and prior art of record. See Exs. 1001, 1005–1010, 1012–1015; see also Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Patent Owner agrees that the Board need not formally construe any claim terms in order to adjudicate the merits of the Petition and argues Petitioner fails to show unpatentability of any claim under any reasonable construction of the claims. Prelim. Resp. 13 (citing Ex. 2036 ¶ 51). We determine that no express claim construction is necessary to determine whether institution is warranted in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (holding that only terms in controversy must be construed “and only to the extent necessary to resolve the controversy”) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 14

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “claimed subject matter and the prior art are “such that the subject matter as a whole would have been obvious at the time the invention was made to a person having ordinary skill in the art to which said subject matter pertains.” KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). When a ground in a petition is based on a combination of references, we consider “whether there was an apparent reason to combine the known elements in the fashion claimed by the patent at issue.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). We base our obviousness inquiry on factual considerations including (1) the scope and content of the prior art, (2) any differences between the claimed subject matter and the prior art, (3) the level of skill in the art, and (4) any objective indicia of obviousness or non-obviousness that may be in evidence.14 See Graham, 383 U.S. at 17–18.” slip op. at 24

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,841,729
  • PTAB · Nov 21, 2025 · IPR2024-00934 · APJ Michael R Zecher · IPR · Final written decision

    Claims 19–21 are unpatentable as obvious over DeMaw and, separately, over Macnally.

    RulingsFinal written decision
    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “1. Principles of Law A claim is unpatentable under § 103(a) if the differences between the” slip op. at 16

    Patent outcomesUS 7,496,342 unpatentable
    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,496,342
  • PTAB · Oct 28, 2025 · IPR2024-00850 · APJ Arthur M Peslak · IPR · Final written decision

    Claims 1, 3–12, 14, and 23–27 are unpatentable as obvious over Raizer and Hangzhou.

    RulingsFinal written decision
    • Skill levelOther

      “B. Level of Ordinary Skill in the Art We consider the asserted grounds of unpatentability in view of the” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction Neither Petitioner nor Patent Owner proposes an express construction” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.” KSR, 550 U.S. at 417. In this case, we must determine whether one of ordinary skill in the art would recognize that Hangzhou’s disclosure of driving its auto-guided trolleys 200 under shelves 100 would improve the operation of Raizer’s system in the same way. For us to resolve this question in Petitioner’s favor, Petitioner must provide “some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). However, bodily incorporation, i.e., “an actual physical substitution of” Hangzhou’s auto-guided trolleys or operating software into Raizer’s system, is not required. See In re Mouttet, 686 F.3d 1322, 1332 (Fed. Cir. 2012) (“It is well-established that a determination of obviousness based on teachings from multiple references does not require an actual, physical substitution of elements.”); In re Nievelt, 482 F.2d 965, 968 (CCPA 1973) (“Combining the teachings of references does not involve an ability to combine their specific structures.”).” slip op. at 23

    Patent outcomesUS 11,472,632 unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,472,632
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jul 15, 2025 · IPR2024-00425 · APJ Bach V Hoang · IPR · Final written decision

    Claims 1–3, 5, 9, and 10 are unpatentable as obvious over Beck, Heller, and Lovejoy; the Board did not reach the alternative Bandy grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not dispute this assessment. See generally PO Resp. Having considered the record, we adopt Petitioner’s proposed level of skill, as articulated above. We are satisfied that Petitioner’s proposal comports with the level of skill necessary to understand and implement the teachings of the ’307 Patent. Accord Inst. Dec. 8–9.” slip op. at 8

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “both the unique sensor ID as well as the associated unique wireless device ID is contradicted, or at least unsupported, by the claim language and the Specification. We determine that this limitation does not require authentication of both the unique sensor ID and the unique wireless device ID, or otherwise require authentication using the unique wireless ID. Rather, the limitation only requires authentication of the unique sensor ID. The language and structure of the claim itself, “the remote server authenticates said unique sensor ID associated with said unique wireless device ID,” requires authentication of the unique sensor ID but not the unique wireless device ID. See Ex. 1001, 19:51–52 (emphasis added). The portion of the limitation reciting “associated with said unique wireless device ID” is linguistically an appositive modifying the “unique sensor ID.” Indeed, Patent Owner acknowledges the “plain meaning of the claim term is that the remote server authenticates the unique sensor ID and that such unique sensor ID is associated with a unique wireless device ID.” PO Resp. 18.” slip op. at 10

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “Patent Owner does not contest Petitioner’s proposed constructions of any of these other claim terms or phrases. PO Resp. 24. We agree with the parties that the identified limitations—which each recite a “means” or “means for” performing a particular function—are means-plus-function limitations that should be interpreted under pre-AIA 35 U.S.C. § 112 ¶ 6. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1349 (Fed. Cir. 2015) (en banc) (holding that “use of the word ‘means’ creates a presumption that § 112, ¶ 6 applies”). And we agree with Petitioner’s uncontested identification of the recited functions and corresponding structure for these limitations for the reasons explained by Petitioner. See Pet. 11–15 (citing Ex. 1001, 2:20–21, 2:24–28, 3:33–36, 17:18–30); id. at 13–15 (citing Ex. 1009, 9:4–6, 9:19–20, 9:57–65, 10:10– 11) (explaining that Lovejoy is incorporated by reference into the ’307 Patent). We adopt the uncontested constructions identified by Petitioner, as” slip op. at 15

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “We agree with Petitioner that the improvements offered by the incorporation of Heller’s teachings would have motivated one of ordinary skill in the art to combine the teachings of Beck and Heller in the manner proposed by Petitioner. Confirming Petitioner’s assertion that the combination yields improvements, Heller states that it improves the type of glucose monitor used in one of Beck’s embodiments. Beck states that its “medical device 130 includes a glucose meter” which “measure[s] blood glucose levels of blood applied to test strips.” Ex. 1007 ¶ 34. Specifically addressing such “conventional” test strip glucose monitoring, Heller states that its in vivo glucose sensor system addresses a need for continuous or automatic monitoring in a small, comfortable device. Ex. 1016, 2:1–7, 2:15–58, 3:19–25. As such, we agree that a person of ordinary skill in the art would have been motivated to combine the teachings of Beck and Heller to improve Beck’s medical device. See KSR, 550 U.S. at 401. We further agree with Petitioner that a POSITA would have been motivated to incorporate sensor implementation details described in Heller, e.g., an A/D converter and patient attachment systems, with Beck’s medical device. Pet. 44–45, 53, 55; Ex. 1003 ¶¶ 228, 234, 236–238, 259, 267, 278, which do no more than yield predictable results, e.g., converting signals or attaching a sensor to a patient. See KSR, 550 U.S. at 401 (“[A] combination of familiar elements according to known methods is likely to be obvious when it does no more than yield predictable results.”).” slip op. at 20

    Patent outcomesUS 7,969,307 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 7,969,307
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
Page 1 of 30
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.