PTAB
Advanced fields
5 decisions · 340msnewest first
  • PTAB · Aug 25, 2025 · PGR2025-00028 · APJ George R Hoskins · PGR · Institution

    The Board instituted PGR on claims 1–20 and all asserted grounds after finding claim 1 more likely than not unpatentable under § 101.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Pursuant to 35 U.S.C. § 324(a), the Director may not authorize a post-grant review unless the information in the petition, if unrebutted, “would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” See 37 C.F.R. § 42.4(a) (“The Board institutes the trial on behalf of the Director.”). For the reasons that follow, we institute a post-grant review as to claims 1–20 of the ’423 patent on all grounds of unpatentability asserted in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “ordinary skill in the art would have had “an educational background of, or practical experience equivalent to, a bachelor’s degree in electrical engineering, computer engineering, computer science, or equivalent training, and approximately three years of experience with electronic payment systems, vending machine technologies, or distributed network systems,” where “[l]ack of work experience can be remedied by additional education, and vice versa.” Pet. 20 (citing Ex. 1003 ¶¶ 20–26). Patent Owner does not address the level of ordinary skill in the art in its Preliminary Response. Based on the record presented, including our review of the ’423 patent and the types of problems and solutions described in the ’423 patent and cited 2 Petitioner states that it “takes no position on the proper priority date for the [c]hallenged [c]laims” and “uses the earliest possible priority date claimed, December 18, 2013,” for purposes of its asserted grounds. Pet. 14. prior art, we agree with Petitioner’s definition and apply it for purposes of this Decision. See, e.g., Ex. 1001, 1:42–2:21 (stating that “[t]he present application relates to the field of payment processing systems” and describing the functionality of payment accepting units in the “Background” section).” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “B. Claim Interpretation We interpret each challenged claim using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.200(b). Petitioner states that, “for purposes of [its] Petition, the Board need not construe any claim terms to resolve the parties’ disputes, and the claims should be given their ordinary and customary meaning.” Pet. 20. Patent Owner agrees that “[n]o constructions are necessary” to decide the issues disputed by the parties. Prelim. Resp. 2–3. We conclude that no express interpretation of any claim term is necessary to determine whether to institute a post-grant review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)).” slip op. at 8

    • PTAB / AIA Trials › §315(e) estoppelNot reached

      “For the reasons explained below, we conclude, on the merits and based on the current record, that Petitioner has shown that it is more likely than not that claim 1 is unpatentable as claiming patent-ineligible subject matter under 35 U.S.C. § 101. See Pet. 77–84. Accordingly, we need not determine at this time whether collateral estoppel applies based on the Board’s decision in PGR2021-00093. The parties, however, should address the issue in their papers during trial, with citations to relevant authority. In particular, the parties are encouraged to address (1) how the collateral estoppel requirement that the issue be “identical to one decided in the first action” applies in the context of an asserted ground under 35 U.S.C. § 101, and (2) the parties’ apparent disagreement as to whether collateral estoppel may be applied in such circumstances on a “limitation-by-limitation basis.” See Pet. 72, 75 (quoting Google LLC v. Hammond Dev. Int’l, Inc., 54 F.4th 1377, 1381 (Fed. Cir. 2022)); Prelim. Resp. 20–21; see also Kroy IP Holdings, LLC v. Groupon, Inc., – F.4th –, No. 2023-1359, 2025 WL 2178321, at *4 (Fed. Cir. Aug. 1, 2025) (Dyk, J., dissenting) (“In subsequent Board proceedings, it is well established that collateral estoppel applies to claims adjudicated by the Board to be unpatentable and also to ‘related claims that present identical issues of patentability,’ i.e., patentably indistinct claims. . . . ‘It is well established that patent claims need not be identical for collateral estoppel to apply.’” (citing MaxLinear, Inc. v. CF CRESPE LLC, 880 F.3d 1373, 1377 (Fed. Cir. 2018); Google, 54 F.4th at 1381)).” slip op. at 12

    Claim construction§ 101 eligibility§ 102 anticipation§ 103 obviousnesscites Mayo · Bilski · Berkheimer · Enfish · Electric Power
    Patents in suitUS 11,972,423
  • PTAB · Aug 25, 2025 · PGR2025-00027 · APJ George R Hoskins · PGR · Institution

    The Board instituted PGR of claims 1–20 on all petitioned grounds, finding claim 1 more likely than not ineligible under § 101.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “A. Legal Standards — Petitioner’s Burden In a post-grant review, “the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (discussing 35 U.S.C. § 312(a)(3), which is identical to 35 U.S.C. § 322(a)(3) in requiring petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”). This 2 Pub. L. No. 112-29, 125 Stat. 284 (2011). burden of persuasion never shifts to the patent owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015).” slip op. at 10

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner contends a person having ordinary skill in the art pertaining to the ’920 patent “would have had an educational background of, or practical experience equivalent to, a bachelor’s degree in electrical engineering, computer engineering, computer science, or equivalent training, and approximately three years of experience with electronic payment systems, vending machine technologies, or distributed network systems.” Pet. 20; Ex. 1003 ¶¶ 20–26. Further: “Lack of work experience can be remedied by additional education, and vice versa.” Pet. 20; Ex. 1003 ¶ 22. Patent Owner does not oppose Petitioner’s formulation of ordinary skill. See Prelim. Resp. generally. Based on the record presented, including our review of the ’920 patent and the types of problems and solutions described in the ’920 patent and cited prior art, we agree with Petitioner’s definition and apply it for purposes of this Decision. See, e.g., Ex. 1001, 1:42–2:21 (stating “[t]he present application relates to the field of payment processing systems” and describing the functionality of payment accepting units in the “BACKGROUND” section).” slip op. at 11

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner argues “the Board need not construe any claim terms to resolve the parties’ disputes.” Pet. 20. Patent Owner argues: “No constructions are necessary to deny institution because denial is warranted for numerous reasons that do not depend on claim construction.” Prelim. Resp. 3. However, as discussed below, several of Patent Owner’s arguments seeking to distinguish claim 1 from Low rely on underlying claim construction positions. Except as discussed below in connection with those arguments, we determine no explicit construction is needed to resolve the parties’ controversy as to whether institution should be granted here. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 12

    • Patent Eligibility (§101) › Alice/Mayo step one — 'directed to'Step1 directed to exceptionInstituted

      “We determine Petitioner has made a sufficient showing for Step 2A, Prong 1 based on the current record. Petitioner addresses each of limitations [1.2]–[1.14] and explains how they support Petitioner’s contention that the claim, as a whole, is directed to the alleged abstract idea. See Pet. 80–84. For example, Petitioner notes specifically how limitation [1.2], reciting “identifying one or more payment accepting units,” pertains to identifying a merchant, and how limitations [1.6], [1.7], and [1.9] recite user interaction using the mobile device that enables the completion of a purchase. See id. Petitioner thus shows sufficiently how claim 1, by virtue of the limitations reproduced above,5 recites the concept of “identifying a merchant and enabling completion of a purchase from the merchant.” Id. at 80.” slip op. at 21

    Claim construction§ 101 eligibility§ 103 obviousnesscites Alice · Mayo · Bilski · Berkheimer · Enfish · Electric Power
    Patents in suitUS 11,966,920
  • PTAB · Mar 11, 2024 · PGR2023-00053 · APJ James P Calve · PGR · Institution

    The Board instituted PGR on claims 1–20 on all asserted grounds because the petition showed it was more likely than not that at least one challenged claim was unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review. 35 U.S.C. § 324; 37 C.F.R. § 42.4(a) (“The Board institutes the trial on behalf of the Director.”). Section 324(a) provides that a post-grant review may not be instituted “unless . . . the information presented in the petition . . . , if such information is not rebutted, would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” Upon consideration of the evidence and arguments in the Petition (including its supporting testimonial evidence) and the evidence and arguments in the Preliminary Response, we determine that the information presented shows that it is more likely than not that Petitioner would prevail with respect to at least one of the challenged claims. Accordingly, we institute post-grant review on all challenged claims on all asserted grounds. See 37 C.F.R. § 42.208(a) (“When instituting post-grant review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”).” slip op. at 2

    • BurdenInstituted

      “review. 35 U.S.C. § 324; 37 C.F.R. § 42.4(a) (“The Board institutes the trial on behalf of the Director.”). Section 324(a) provides that a post-grant review may not be instituted “unless . . . the information presented in the petition . . . , if such information is not rebutted, would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” Upon consideration of the evidence and arguments in the Petition (including its supporting testimonial evidence) and the evidence and arguments in the Preliminary Response, we determine that the information presented shows that it is more likely than not that Petitioner would prevail with respect to at least one of the challenged claims. Accordingly, we institute post-grant review on all challenged claims on all asserted grounds. See 37 C.F.R. § 42.208(a) (“When instituting post-grant review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”).” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “degree in electrical engineering, computer engineering, computer science or a similar discipline, with at least two years of relevant industry or research experience, including experience designing, planning, or implementing sensor networks using LIDAR, radar and/or cameras and corresponding data analysis” and “[a]dditional work or research experience can substitute for less or different education, and vice versa.” Pet. 10 (citing Ex. 1003 ¶¶ 18– 23). Patent Owner does not address the level of ordinary skill in the art. On the present record, we find that Petitioner’s uncontested level of ordinary skill in the art is consistent with the ’349 patent and the prior art of record, and we adopt it for consideration of the issues presently before us.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner asserts that “[n]o terms require construction to determine that claims 1–20 are invalid under §§ 101, 102, 103.” Pet. 9. At this stage, Patent Owner does not address the construction of any term or phrase. On the present record, we determine that we do not need to construe any claim terms to reach our decision. See Realtime Data, LLC. v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019).” slip op. at 9

    Claim construction§ 101 eligibility§ 102 anticipation§ 103 obviousnesscites Alice · Mayo · KSR · Graham
    Patents in suitUS 11,538,349
  • PTAB · Nov 1, 2023 · PGR2023-00023 · APJ Brent M Dougal · PGR · Institution

    Instituted PGR of claims 1–20 because at least one challenged claim was more likely than not unpatentable under the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Petitioner bears the burden to demonstrate unpatentability under the more likely than not standard. 35 U.S.C. § 324(a); Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015). A claim is unpatentable “if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious . . . to a person having ordinary skill in the art to which the claimed invention pertains.” 35 U.S.C. § 103; see also KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). We resolve the question of obviousness based on underlying factual determinations, including: (1) the scope and content of the prior art; (2) any differences between the prior art and the claims; (3) the level of skill in the art; and (4) when in evidence,” slip op. at 4

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “understanding of a person of ordinary skill in the art at the time of the invention. Id. at 13, 17. Petitioner asserts that a person of ordinary skill in the art (POSA): would have had a B.S. in Chemical Engineering, Mechanical Engineering, Materials Science, or Metallurgical Engineering or an equivalent field and at least two years of academic or industry experience in the oil and gas industry, including experience with process control systems. Further, a person with additional education but less professional experience, and vice-versa, may qualify. Pet. 23–24 (citing Ex. 1003 ¶ 4). Patent Owner adopts Petitioner’s definition. Prelim. Resp. 15. We are persuaded, on the present record, that Petitioner’s proposal is consistent with the problems and solutions in the ’058 patent and prior art of record. We adopt Petitioner’s definition of the level of skill for the purposes of this Decision.” slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “construction standard that would be used to construe the claim in a civil action under 35 U.S.C. § 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.200(b) (2022). claim terms. Pet. 25; Prelim. Resp 15–16. We determine that no terms need to be construed at this time. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 5

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “Petitioner also relies on Pankaj Figure 11 to disclose the preamble and the final limitation, with the exception of the fracturing pump/fracturing equipment being electrical. See Pet. 38–40 (discussing e.g., Pankaj’s control method in Figure 11, teachings of computer implementation), 49–51 (discussing e.g., Pankaj’s controlling of production operations, including a fracturing pump). As previously noted, Petitioner relies on Payne for teaching that the fracturing pump can be electrical. Id. at 31, 49–51. Petitioner also provides reasons why one of skill in the art would combine Payne’s electrical fracturing pump with Pankaj’s fracturing system. Id. at 31–38, 51. Patent Owner does not contest that the combination of Pankaj and Payne teaches the above noted limitations. See generally, Prelim. Resp. 50– 57.” slip op. at 9

    Claim construction§ 101 eligibility§ 103 obviousnesscites Alice · Mayo · Bilski · Berkheimer · Enfish · KSR
    Patents in suitUS 11,373,058
  • PTAB · Mar 13, 2023 · PGR2022-00055 · APJ Sean P O’Hanlon · PGR · Institution

    The Board instituted PGR on claims 1–4 and 10–13, finding the petition showed a reasonable likelihood of prevailing on § 101 and § 103 grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “We have authority to determine whether to institute a post-grant review. 35 U.S.C. § 324(c) (2018); 37 C.F.R. § 42.4(a). Institution of postgrant review is authorized by statute only when “the information presented in the petition . . . , if such information is not rebutted, would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). “When instituting post-grant review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.208(a)). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has demonstrated that it is more likely than not that it will prevail with respect to at least one challenged claim. Accordingly, we institute post-grant review of the challenged claims of the ’454 patent.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not contest Petitioner’s definition or offer a definition of its own. See generally Prelim. Resp. Based on the arguments presented and the cited references, we find Petitioner’s definition of the level of ordinary skill reasonable and, for purposes of this Decision, adopt it as our own.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Neither party presents arguments for the express construction of any term, instead interpreting the claim terms according to their ordinary and customary meaning. Pet. 18; Prelim. Resp. 15. For purposes of this Decision, and based on the record before us, we determine that no construction of any term is necessary. We note that this determination does not preclude the parties from arguing their proposed constructions of the claims during trial. Indeed, the parties are hereby given notice that claim construction, in general, is an issue to be addressed at trial. A final determination as to claim construction will be made at the close of the proceeding, after any hearing, based on all the evidence of record. slip op. at 11

    • Patent Eligibility (§101) › Alice/Mayo step one — 'directed to'Step1 directed to exceptionInstituted

      “Claim 1 recites a system that performs the steps of receiving information (recitations 1.3, 1.8), using received information to generate a set of possible drilling paths (recitation 1.4), removing certain ones of the generated possible paths (recitations 1.5–1.6), selecting a desired one of the generated paths (recitation 1.7), and updating a plan to include the selected path (recitation 1.9). This collection and manipulation of data is similar to the data collection and management concepts that were held to be patent ineligible in previous cases. See Content Extraction & Transmission LLC v. Wells Fargo Bank, 776 F.3d 1343, 1345, 1347 (Fed. Cir. 2014); In re TLI Commc’ns LLC Patent Litig., 823 F.3d 607, 610, 613 (Fed. Cir. 2016); Elec. Power Grp., LLC v. Alstom S.A., 830 F.3d 1350, 1351–54 (Fed. Cir. 2016). Although the claim enumerates the type of information (i.e., BHA location, target path, and possible convergence paths) that is acquired and analyzed, the Federal Circuit has explained that the mere selection and manipulation of particular information by itself does not make an abstract concept any less abstract. Elec. Power Grp., 830 F.3d at 1353; Dig. Image Techs., LLC v. Elecs. for Imaging, Inc., 758 F.3d 1344, 1351 (Fed. Cir. 2014). Accordingly, on this record, Petitioner sufficiently shows that the claim recites an abstract idea that falls within the grouping of mental processes. See Elec. Power Grp., 830 F.3d at 1355.” slip op. at 19

    Claim construction§ 101 eligibility§ 102 anticipation§ 103 obviousnesscites Alice · Mayo · Bilski · Electric Power · KSR · Graham
    Patents in suitUS 11,170,454

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.