PTAB
Advanced fields
115 decisions · 425msnewest first
  • PTAB · Mar 20, 2025 · IPR2024-01406 · APJ Jo-Anne M Kokoski · IPR · Institution

    The Board instituted IPR on claims 1, 3, 4, 8–13, and 15 on all asserted grounds, finding a reasonable likelihood that Takeuchi anticipates those claims.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314 (2018); see also 37 C.F.R. § 42.4 (2023). For the reasons discussed below, we determine that Petitioner establishes a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’202 patent. Accordingly, we institute an inter partes review of claims 1, 3, 4, 8–13, and 15 of the ’202 patent. A. Real Parties in Interest” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “or “POSITA”) would have had “a bachelor’s degree in mechanical engineering, electrical engineering, or a related field, and three to four years of experience, or a master’s degree in mechanical engineering, electrical engineering, or a related field, and one to two years of experience.” Pet. 6 (citing Ex. 1003 ¶ 13). Petitioner further contends that “[s]uch experience would include a familiarity with thermal fluid delivery devices and/or the components and underlying technology used therein, and a higher level of 1 US 5,249,586, issued Oct. 5, 1993 (Ex. 1004, “Morgan”). 2 EP 0 845 220 B1, published Jan. 26, 1998 (Ex. 1006, “Susa”). 3 US 2005/0205084 A1, published Sept. 22, 2005 (Ex. 1007, “Gupta”). 4 US 6,155,268, issued Dec. 5, 2000 (Ex. 1009, “Takeuchi”). at 6–7 (citing Ex. 1003 ¶ 13). Patent Owner states that, for purposes of the Preliminary Response, “Patent Owner maintains that Petitioners’ arguments fail even under Petitioners’ POSA definition.” Prelim. Resp. 13. On this record, we preliminarily adopt Petitioner’s undisputed proposed definition because it appears to be consistent with the cited prior art and the disclosure of the ’202 patent. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))). B. Claim Construction” slip op. at 6

    • Prior constructionPrior construction adoptedDecided for petitioner

      “term “wicked into contact” that the Board adopted in a prior inter partes review proceeding that addressed the same term in an earlier, related patent. Pet. 7 (citing IPR2020-01602, Paper 32 at 8–15 (PTAB March 30, 2022)). ‘wicked into contact’ to mean: ‘wicked into contact (1) with the heater, or (2) with an area in close proximity to, and exposed [to] the heat produced by, the heater,’” and “[t]he present Petition adopts this formal construction for purposes of this IPR proceeding.” Id. (citing IPR2020-01602, Paper 32 at 15). Patent Owner also “adopts this construction for purposes of” the Preliminary Response, and argues that “Petitioner’s grounds fail even under its proposed construction of ‘wicked into contact.’” Prelim. Resp. 13. For purposes of this Decision, we adopt the Board’s prior construction of “wicked into contact,” namely, “wicked into contact (1) with the heater, or (2) with an area in close proximity to, and exposed to the heat produced by, the heater,” which is undisputed on this record. See Philip Morris Products, S.A. v. RAI Strategic Holdings, Inc., IPR2020-01602, Paper 32 at 8–15 (PTAB March 30, 2022). C. Asserted Anticipation by Morgan” slip op. at 7

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot reached

      “To establish anticipation, each and every element in a claim, arranged as recited in the claim, must be found in a single prior art reference. Net Karsten Mfg. Corp. v. Cleveland Golf Co., 242 F.3d 1376, 1383 (Fed. Cir. 2001). “A reference may anticipate inherently if a claim limitation that is not expressly disclosed is ‘necessarily present, or inherent, in the single anticipating reference.’” In re Montgomery, 677 F.3d 1375, 1379 (Fed. Cir. 2012) (quoting Verizon Servs. Corp. v. Fibernet Va., Inc., 602 F.3d 1325, 1336–37 (Fed. Cir. 2010)). Based on the current record, we are not persuaded that Petitioner sufficiently establishes that Morgan discloses “a storage compartment . . . being arranged such that the liquid aerosol-forming material can be wicked into contact with the electrical resistance heater to volatilize the liquid aerosol-forming material” as recited in claim 1.” slip op. at 12

    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 11,925,202
  • PTAB · Mar 18, 2025 · IPR2024-01377 · APJ Brian D Range · IPR · Institution

    The Board instituted IPR on claims 1–25 on all petitioned grounds, finding a reasonable likelihood of success, including that GMW14400 likely qualifies as prior art.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review pursuant to 35 U.S.C. § 6(b). Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” The Board determines whether to institute a trial on behalf of the Director. 37 C.F.R. § 42.4(a). The following findings of fact and conclusions of law are not final, but are made for the sole purpose of determining whether Petitioner meets the threshold for initiating review. Any final decision shall be based on the full trial record, including any response timely filed by Patent Owner. Any arguments not raised by Patent Owner in a timely-filed response may be deemed waived. For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. We hereby institute an inter partes review as to claims 1–25 of the ’227 patent based upon Petitioner’s asserted grounds of unpatentability.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “efficiency and integrity of the system are best served by denying or instituting review.” Fintiv at 6. Here, Fintiv factors one and five are neutral, factors two and three favor discretionary denial, factor four strongly weighs against discretionary denial, and favor six weighs against discretionary denial. The integrity of the system will benefit from institution because of the strong merits the Petition presents (factor six), and the ITC Investigation will not resolve these merits (factor four). This outweighs any potential inefficiency as indicated by factors two and three. We further note that any inefficiency in resolving the grounds the Petition presents is mitigated by the stay of the district court action (factor one). We, thus, decline to exercise discretionary denial under 35 U.S.C. § 314(a).” slip op. at 17

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied

      “After considering the record as a whole, we determine that Petitioner has adequately demonstrated that the Office erred in a manner material to the patentability of challenged claims. As we explain in Section III(G), infra, Petitioner’s challenges to the ’227 patent appear strong based on the current record, and Patent Owner’s present arguments to the contrary are weak. Given the strength of Petitioner’s challenges on the present record, this is not a situation where we would say that “reasonable minds can disagree regarding the purported treatment of the art,” and we therefore determine that the Examiner erred by not considering the art in substantially the combination Petitioner proposes. Where Patent Owner states that “evidence that the Examiner did not consider these references in combination” is lacking (PO Sur-Reply 5), we disagree. If the Examiner considered these references in combination, the Examiner would have, given the apparent strength of Petitioner’s position on the merits on this record, issued a rejection. The lack of a rejection based on the combination proposed in the Petition provides some evidence that the Examiner did not consider these references in combination (because the lack of such a rejection raises the likelihood that the Examiner did not make such a consideration). 3. Conclusion Because Petitioner adequately made a showing of material error, we decline to exercise discretion not to institute inter partes review under 35 U.S.C. § 325(d). See Advanced Bionics, LLC, IPR2019-01469, Paper 6 at 8–9.” slip op. at 19

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “For purposes of this Decision, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 11,326,227
  • PTAB · Mar 18, 2025 · IPR2024-01376 · APJ Brian D Range · IPR · Institution

    The Board instituted review of claims 1–30 on all petitioned grounds, finding a reasonable likelihood of success, including that GMW14400 likely qualifies as prior art.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “IV. CONCLUSION For the reasons above, we determine that the information presented in the Petition establishes that there is a reasonable likelihood that Petitioner would prevail with respect to challenged claims 1–30 of the ’602 patent. At this juncture in the proceeding, we have not made a final determination with respect to the patentability of the challenged claims, or with respect to claim construction. V. ORDER For the foregoing reasons, it is ORDERED that pursuant to 35 U.S.C. § 314(a), an inter partes review of claims 1–30 of the ’602 patent is hereby instituted with respect to all grounds of unpatentability set forth in the Petition; and” slip op. at 36

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “efficiency and integrity of the system are best served by denying or instituting review.” Fintiv at 6. Here, Fintiv factors one and five are neutral, factors two and three favor discretionary denial, factor four strongly weighs against discretionary denial, and favor six weighs against discretionary denial. The integrity of the system will benefit from institution because of the strong merits the Petition presents (factor six), and the ITC Investigation will not resolve these merits (factor four). This outweighs any potential inefficiency as indicated by factors two and three. We further note that any inefficiency in resolving the grounds the Petition presents is mitigated by the stay of the district court action (factor one). We, thus, decline to exercise discretionary denial under 35 U.S.C. § 314(a).” slip op. at 17

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDenied

      “After considering the record as a whole, we determine that Petitioner has adequately demonstrated that the Office erred in a manner material to the patentability of challenged claims. As we explain in Section III(G), infra, Petitioner’s challenges to the ’602 patent appear strong based on the current record, and Patent Owner’s present arguments to the contrary are weak. Given the strength of Petitioner’s challenges on the present record, this is not a situation where we would say that “reasonable minds can disagree regarding the purported treatment of the art,” and we therefore determine that the Examiner erred by not considering the art in substantially the combination Petitioner proposes. Where Patent Owner states that “evidence that the Examiner did not consider these references in combination” is lacking (PO Sur-Reply 5), we disagree. If the Examiner considered these references in combination, the Examiner would have, given the apparent strength of Petitioner’s position on the merits on this record, issued a rejection. The lack of a rejection based on the combination proposed in the Petition provides some evidence that the Examiner did not consider these references in combination (because the lack of such a rejection raises the likelihood that the Examiner did not make such a consideration). 3. Conclusion Because Petitioner adequately made a showing of material error, we decline to exercise discretion not to institute inter partes review under 35 U.S.C. § 325(d). See Advanced Bionics, LLC, IPR2019-01469, Paper 6 at 8–9.” slip op. at 19

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “For purposes of this Decision, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,961,602
  • PTAB · Feb 18, 2025 · IPR2023-01210 · APJ Patrick R Scanlon · IPR · Final written decision

    Claim 18 is unpatentable as anticipated by Shkedi and Zhu; claims 1, 15, 41, and 52 were statutorily disclaimed, and the alternative obviousness grounds were not reached.

    RulingsFinal written decision
    • Adverse judgmentAdverse judgmentOther

      “After institution, Patent Owner filed a Patent Owner Response (Paper 26, “PO Resp.”). Patent Owner also filed a statutory disclaimer of claims 1, 15, 41, and 52. PO Resp. 1; Ex. 2024. Accordingly, the only claim remaining for our consideration at trial is claim 18. See 35 U.S.C. § 253 (disclaimer of claims considered effective as if part of original patent); 37 C.F.R. § 42.107 (Board will not institute trial on disclaimed claims). Petitioner filed a Reply (Paper 33, “Reply”), and Patent Owner filed a Sur-reply (Paper 37, “Sur-reply”).” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not dispute Petitioner’s definition of the level of ordinary skill in the art for purposes of this proceeding. PO Resp. 11–12 (citing Ex. 2020 ¶¶ 47–48). For purposes of this Final Written Decision, we adopt Petitioner’s proposal as reasonable and consistent with the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “Upon consideration of the parties’ arguments and for the reasons explained below, we agree with Petitioner that Patent Owner’s additional requirement of evaluating the calibration data to determine the boundaries of the area represented by a grid point should not be included in the construction of either “grid point” or “non-uniform grid point.” Instead, based on the full record, we discern no reason to alter our prior construction of “grid point” as “a point associated with representative calibration data for an area” and maintain that construction for this Final Written Decision for the following reasons. First, the construction of “grid point” we adopt here is supported by the Specification of the ’358 patent. Namely, the ’358 patent discloses that “[i]n general, a non-uniform grid point (NUG) may represent the signal characteristics and/or calibration data over a given region,” and “NUGs represent an area of collected calibration data.”9 Ex. 1001, 3:57–67. The district court identified the second quoted passage, which is identically recited in the ’104 patent (see Ex. 1018, 3:50–60) as “provid[ing] a clear indication of the meaning of ‘grid point.’” Ex. 1028, 19 (emphasis added). We agree with the district court’s analysis. Although the ’358 patent does not explain how a generic “grid point” might differ from the described “nonuniform grid point,” we do not find this distinction pertinent to construing “grid point” in this case because neither party raises this issue. Furthermore,” slip op. at 18

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “We agree with Petitioner. The pertinent disclosure from Shkedi reads: Simply stated, if a mobile telephone (at a user selected location) measures a plurality of service antenna signals and stores these with their respective service antenna identifications, then that mobile telephone (or an equivalent unit) upon observing an respective signal strengths—can reasonably conclude that it is within a predetermined proximity of the original user selected location. Ex. 1006, 8:41–48. Here, we find that the language “within a predetermined proximity of the original user selected location” refers to an area around the original user selected location. In other words, “within a predetermined proximity of the original user selected location” discloses that, instead of being exactly at the original user selected location, the mobile telephone only need be in the area or vicinity of the original user selected location. Indeed, in acknowledging “that Shkedi assumes the user is within some ‘predetermined’ distance of [the original user selected] location” (PO Resp. 33), Patent Owner effectively confirms this interpretation of Shkedi’s disclosure. That is, being within some predetermined distance of the original user selected location is equivalent to being within a circle centered on the original user selected location and having a radius equal to the predetermined distance. That Shkedi allegedly only “assumes” that the user is within the predetermined distance of the original user selected location does not detract from the fact that Shkedi’s disclosure of “within a predetermined proximity of the original user selected location” describes an area around the original user selected location.” slip op. at 34

    Patent outcomesUS 8,400,358 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 8,400,358
  • PTAB · Feb 18, 2025 · IPR2023-01209 · APJ Patrick R Scanlon · IPR · Final written decision

    Claim 2 is unpatentable as anticipated by Shkedi; the Board did not reach the alternative obviousness ground based on Shkedi and Spain.

    RulingsFinal written decision
    • Adverse judgmentAdverse judgmentOther

      “After institution, Patent Owner filed a Patent Owner Response (Paper 27, “PO Resp.”). Patent Owner also filed a statutory disclaimer of claims 1, 3, and 11. PO Resp. 1; Ex. 2024. Accordingly, the only claim remaining for our consideration at trial is claim 2. See 35 U.S.C. § 253 (disclaimer of claims considered effective as if part of original patent); 37 C.F.R. § 42.107 (Board will not institute trial on disclaimed claims). Petitioner filed a Reply (Paper 34, “Reply”), and Patent Owner filed a Sur-reply (Paper 39, “Sur-reply”).” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not dispute Petitioner’s definition of the level of ordinary skill in the art for purposes of this proceeding. PO Resp. 11–12 (citing Ex. 2020 ¶¶ 47–48). For purposes of this Final Written Decision, we adopt Petitioner’s proposal as reasonable and consistent with the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “contention that, because the district court referred to the data points within an area being statistically similar as the defining characteristic of a NUG region, the claimed grid points cannot exist until after the calibration data is gathered and analyzed. See PO Resp. 18–19. This contention, even if correct, is not persuasive because it is generally improper to read limitations from specific embodiments into the claims. See Cadence Pharms. Inc. v. Exela PharmSci Inc., 780 F.3d 1364, 1369 (Fed. Cir. 2015) (“[E]ven if all of the embodiments discussed in the patent included a specific limitation, it would not be proper to import from the patent’s written description limitations that are not found in the claims themselves.” (internal quotations omitted)); see also SuperGuide Corp. v. DirecTV Enters., Inc., 358 F.3d 870, 875 (Fed. Cir. 2004) (“Though understanding the claim language may be aided by the explanations contained in the written description, it is important not to import into a claim limitations that are not a part of the claim.”). Patent Owner’s assertion that the ’379 provisional application and the ’784 patent both describe evaluating the statistical similarities of calibration data (PO Resp. 10, 20) also fails to provide a sufficient reason to import a requirement to evaluate the calibration data into the construction of “grid point” or “non-uniform grid point.” Similarly, Patent Owner’s assertion that is “of great importance” because it is fundamental to generating the grid points is unpersuasive. See PO Resp. 27. Even describing evaluation as being “of great importance” is an insufficient basis for importing a requirement for evaluation. See Texas Instruments, Inc. v. U.S. Int’l Trade Comm’n, 805 F.2d 1558, 1563 (Fed. Cir. 1986) (“[The Federal Circuit] has cautioned against limiting the claimed invention to preferred embodiments or specific examples in the specification.”).” slip op. at 19

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “We agree with Petitioner. The pertinent disclosure from Shkedi reads: Simply stated, if a mobile telephone (at a user selected location) measures a plurality of service antenna signals and stores these with their respective service antenna identifications, then that mobile telephone (or an equivalent unit) upon observing an identical list of service antennas with substantially identical respective signal strengths—can reasonably conclude that it is within a predetermined proximity of the original user selected location. Ex. 1006, 8:41–48. Here, we find that the language “within a predetermined proximity of the original user selected location” refers to an area around the original user selected location. In other words, “within a predetermined proximity of the original user selected location” discloses that, instead of being exactly at the original user selected location, the mobile telephone Indeed, in acknowledging “that Shkedi assumes the user is within some ‘predetermined’ distance of [the original user selected] location” (PO Resp. 33), Patent Owner effectively confirms this interpretation of Shkedi’s disclosure. That is, being within some predetermined distance of the original user selected location is equivalent to being within a circle centered on the original user selected location and having a radius equal to the predetermined distance. That Shkedi allegedly only “assumes” that the user is within the predetermined distance of the original user selected location does not detract from the fact that Shkedi’s disclosure of “within a predetermined proximity of the original user selected location” describes an area around the original user selected location.” slip op. at 34

    Patent outcomesUS 7,561,104 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,561,104
  • PTAB · Feb 14, 2025 · IPR2023-01212 · APJ Sheila F Mcshane · IPR · Final written decision

    Claims 1, 7, 9, 32, 38, and 40 are unpatentable as anticipated by Spain and obvious over Spain as evidenced by Agiwal.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “III. ANALYSIS A. Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art: would have been someone knowledgeable in wireless networks, cellular radio systems, mobile communication devices and radio navigation systems. That person would have at least a bachelor’s degree in electrical engineering, with a background in radio frequency communications and/or navigation system technology as well as approximately two years of industry experience working on radio communication and/or navigation systems. Pet. 18 (citing Ex. 1008 ¶ 44). Patent Owner adopts Petitioner’s asserted level of ordinary skill in the art. PO Resp. 13. 1 The Leahy-Smith America Invents Act (“AIA”), Pub. L. No. 112-29, 125 Stat. 284, 287–88 (2011), amended 35 U.S.C. §§ 102, 103, effective March 16, 2013. Because the application and provisional application for the ’753 patent were filed before this date, the pre-AIA version of §§ 102, 103 apply. See Ex. 1001, codes (22), (60). Petitioner does not dispute that the filing date of the provisional application filing date applies. See Pet. 6; see generally Pet. Reply. 2 US 2003/0064735 A1, published April 3, 2003 (Ex. 1006). 3 Ankur Agiwal, LOCATOR – Location Estimation System For Wireless LANs, WMASH 2004: Proceedings of the Second ACM International Workshop on Wireless Mobile Applications and Services on WLAN Hotspots, 102–109 (2004) (Ex. 1005). For the purposes of this Decision, we adopt the assessment offered by Petitioner as it is consistent with the ’753 patent and the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We agree with Petitioner that Patent Owner’s additional requirements of evaluating the calibration data to determine the boundaries of the area should not be included in the construction of “grid point.” Instead, based on the full record, and for the reasons explained below, we discern no reason to alter our prior construction in the Institution Decision of “grid point” as “a point associated with representative calibration data for an area.” Dec. 22– 23.” slip op. at 17

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “The evidence supports that Petitioner has sufficiently demonstrated that Spain teaches “generating one or more sets of grid points for said calibration data,” as recited in limitation [1.2]. Spain states that: In another embodiment, the database is built by taking fingerprint measurements at predetermined locations and using intelligent algorithms that interpolate the fingerprints at all locations in between the sampled locations. Ex. 1006 ¶ 101. Relevant to this disclosure, Mr. Williams testifies that “Spain discloses generation of sets of grid points wherein each set includes newly interpolated grid points” because “the two grid points used to interpolate an additional grid point or points and the generated additional grid point or points are collectively a generated ‘set’ of grid points (i.e., a ‘set’ which includes the two calibrated grid points and the associated interpolated grid points).” Ex. 1008 ¶¶ 76–77 (citing Ex. 1006 ¶¶ 54, 55, 101). It is not disputed that Spain’s “fingerprints” are calibration data having characterizing parameters, such as observed signal strength, observed at calibration points. See Ex. 1006 ¶ 35. We find that this evidence demonstrates that Spain discloses generating one or more grid points, where the grid points are associated with calibration data.10 Accordingly, the evidence provides support that Spain’s interpolation of fingerprints at different locations discloses generation of one or more sets of grid points, where the grid points are associated with calibration data. Spain also discloses that: . . . the fingerprint corresponds not to one exact spot on the surface of the earth, but instead to a small area. The Lat and Long fields in this embodiment indicate a position inside the area, preferably the center point.” slip op. at 33

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “2. Discussion Petitioner refers to Agiwal to note that, like Spain, “Agiwal discloses an initial approximate location-based search of its database using live measurement data transmitted from a mobile device.” Pet. 18. Petitioner, however, relies only on Spain for its obviousness assertions. Id. at 22–38. The above discussion and Petitioner’s showing related to anticipation by Spain also equally apply to the obviousness showing over Spain as presented by Petitioner. See Connell v. Sears, Roebuck & Co., 722 F.2d 1542, 1548 (Fed. Cir. 1983). Patent Owner presents no additional arguments specifically directed to Petitioner’s showing as to obviousness under Spain that we have not already addressed. See generally PO Resp. Patent Owner also presents no evidence of objective indicia of nonobviousness. See generally PO Resp. Weighing the record as a whole in view of the findings and analysis above, we conclude that Petitioner has met its burden to show, by a preponderance of the evidence, that claims 1, 7, 9, 32, 38, and 40 would have been obvious over Spain as evidenced by Agiwal.” slip op. at 43

    Patent outcomesUS 8,406,753 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 8,406,753
  • PTAB · Feb 14, 2025 · IPR2023-01211 · APJ Brian D Range · IPR · Final written decision

    Claims 4 and 26 are unpatentable: claim 4 is anticipated by Shkedi, and claims 4 and 26 are obvious over Zhu and Spain.

    RulingsFinal written decision
    • Prior constructionPrior construction adoptedDecided for petitioner

      “requirement of evaluating the calibration data to determine the boundaries of the area represented by a grid point should not be included in the construction of either “grid point” or “non-uniform grid point.” Instead, based on the full record, we discern no reason to alter our prior construction of “grid point” as “a point associated with representative calibration data for an area” and maintain that construction for this Final Written Decision. The construction of “grid point” we adopt is supported by the Specification of the ’494 patent. Namely, the ’494 patent discloses that “[i]n general, a non-uniform grid point (NUG) may represent the signal characteristics and/or calibration data over a given region,” and “NUGs represent an area of collected calibration data.”9 Ex. 1001, 3:58–4:2. The district court identified the second quoted passage, which is identically recited in the ’104 patent (see Ex. 1018, 3:50–60) as “provid[ing] a clear indication of the meaning of ‘grid point.’” Ex. 1028, 19 (emphasis added). We agree with the district court’s analysis. Although the ’494 patent does not explain how a generic “grid point” might differ from the described “nonuniform grid point,” we do not find this distinction pertinent to construing “grid point” in this case because neither party raises this issue. Also, based on the claim words “non-uniform grid point,” a “non-uniform grid point” is a type of grid point. Furthermore, the district court construed “grid point” only, not “non-uniform grid point.” Id. at 18–20.” slip op. at 19

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “at the time the application was filed, we consider the level of ordinary skill in the pertinent art at the critical time. Graham, 383 U.S. at 17. The resolution of this question is important because it allows us to “maintain[] objectivity in the obviousness inquiry.” Ryko Mfg. Co. v. Nu–Star, Inc., 950 F.2d 714, 718 (Fed. Cir. 1991). In assessing the level of ordinary skill in the art, various factors may be considered, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC, Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (quotation omitted). Generally, it is easier to establish obviousness under a higher level of ordinary skill in the art. Innovention Toys, LLC v. MGA Entm’t, Inc., 637 F.3d 1314, 1323 (Fed. Cir. 2011) (“A less sophisticated level of skill generally favors a determination of nonobviousness . . . while a higher level of skill favors the reverse.”). Petitioner contends that a person of ordinary skill in the art (POSITA) would have been someone knowledgeable in wireless networks, cellular radio systems, mobile communication devices and radio navigation systems, having at least a bachelor’s degree in electrical engineering, with a background in radio frequency communications and/or navigation system technology as well as approximately two years of industry experience working on radio communication and/or navigation systems. Pet. 13 (citing Ex. 1012 ¶ 30). Patent Owner does not dispute the level of ordinary skill in the art. PO Resp. 11–12. We adopt Petitioner’s proposal as reasonable and consistent with the ’494 patent specification and the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 9

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “We also credit Mr. Williams’s testimony that determining which calibration data is representative of an area “would not require analysis” because “[i]t could be just the actual measurement,” and “analysis could be part of it, but it doesn’t have to be.” Ex. 2023, 37:10–22. Patent Owner’s argument that this testimony is not instructive because Mr. Williams limited his responses to the construction of calibration data and avoided responding to the question asked is not persuasive. See Sur-reply 8–9. Although Mr. Williams did refer to “the calibration data construction” in his response, we disagree that he avoided responding to the question asked. He was asked: “To determine which of that calibration data is representative of an area would require analyzing that set of collected calibration data, right?” and directly responded: “It would not require analysis. It could be just the actual measurement.” Ex. 2023, 37:10–16. This testimony responded to the question asked. He then stated: “I believe that is an issue as part of the calibration data construction,” before concluding: “So analysis could be part of it, but it doesn’t have to be.” Ex. 2023, 37:17–22. Merely expressing a belief that the issue or question asked relates to the calibration data construction does not equate to his response being limited to the calibration data construction.” slip op. at 23

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “Thus, “grid points” and “calibration points” in the ’494 patent are distinct elements that can overlap. Specifically, a “grid point” is a point associated with representative calibration data for an area, and a “calibration point” is a point at which calibration data is collected. These points can occupy the same physical location (i.e., the same longitude/latitude coordinates) but still be a “grid point” and a “calibration point.” For these reasons, we are not persuaded that the overlap between “grid points” and “calibration points” in Shkedi undermines Petitioner’s position and evidentiary showing. Petitioner, thus, has established by a preponderance of the evidence that Shkedi teaches each element of claim 4 including non-uniform grid points. We determine that the preponderance of the evidence establishes that claim 4 is anticipated by Shkedi.” slip op. at 42

    Patent outcomesUS 8,786,494 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 8,786,494
  • PTAB · Feb 5, 2025 · IPR2023-01241 · APJ Christopher L Ogden · IPR · Final written decision

    Claims 10–13, 19, 21, 23, and 33 are unpatentable as obvious over Ueda, the SIP Standard, and the SDP Standard, with Cohee added for claims 11, 13, 19, and 23.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedOther

      “Petitioner argues that a person of ordinary skill in the art “would have had a bachelor’s degree, or equivalent, in electrical engineering, computer science, or a related field, and 2–3 years of experience researching, designing, or developing content delivery systems and related hardware, software, and firmware, or equivalent experience.” Pet. 4 (citing Ex. 1008 ¶¶ 36–40). Patent Owner does not dispute this. See PO Resp. 3 (citing Ex. 2001 ¶ 22). Because it is uncontested, supported by testimonial evidence, and appears consistent with the types of problems and solutions in the ’427 patent, we adopt the above articulation of the level of ordinary skill for this decision.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We agree with Patent Owner that the term should be construed according to its ordinary and customary meaning, and that we need not construe the term explicitly because the meaning of the term is not relevant to the contested issues in the proceeding. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artDecided for petitioner

      “Having considered all the evidence of record relating to Mr. Taniguchi’s activities during the relevant time frame, we find that Patent Owner has not produced sufficient corroborating evidence to show that Mr. Taniguchi’s work on reducing to practice the claimed invention was reasonably continuous during the critical period between September 19, 2008 (the filing date of Ueda), and November 18, 2008 (the filing date of the Japanese patent application). Although there is corroborating evidence of diligence beginning on November 6, 2008, when Mr. Taniguchi transmitted a draft application to the Baba law firm, there is no evidence of any diligence prior to that date, other than Mr. Taniguchi’s own testimony. We do not agree with Patent Owner that the evidence of Mr. Taniguchi’s other activities for NEC, or research relating to IPTV, corroborate Mr. Taniguchi’s reduction to practice of the claimed invention. Although these activities may have something to do with the general subject matter of IPTV, Patent Owner has not shown any nexus between these activities and the challenged claims. See Naber, 567 F.2d at 385 (“It is well settled that, to satisfy the ‘reasonable diligence’ requirement . . . , the work relied on must ordinarily be directly related to reduction to practice of the invention . . . in issue.” (citing cases)). Although Mr. Taniguchi doubtlessly spent substantial time preparing the application he completed on November 6, 2008 (see Ex. 2017), there is no corroborating evidence that this work was reasonably continuous during the critical period. As far as the corroborating evidence attests, Mr. Taniguchi could have done no work on the draft until early November, or he could have worked on the draft briefly in August and put it aside until early November. Considering all the evidence as to Mr. Taniguchi’s activities, we find that Patent Owner has not met its burden of producing corroborating evidence that the named inventors of the ’427 patent exercised reasonably continuous diligence during the critical period when Ueda was filed until the constructive reduction to practice that occurred on November 18, 2008. Therefore, we determine, by a preponderance of the evidence, that Ueda is prior art to the challenged claims.” slip op. at 24

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “In general, we disagree with Patent Owner that, in showing a reason to incorporate the SIP Standard’s teachings about proxy servers, Petitioner must necessarily show that Ueda’s system was deficient or inferior. A patent challenger “does not need to show that there was a known problem with the prior art system in order to articulate the required rational underpinning for the proposed combination.” Unwired Planet, LLC v. Google Inc., 841 F.3d 995, 1002–03 (Fed. Cir. 2016). Also, “when a patent claims a structure already known in the prior art that is altered by the mere substitution of one element for another known in the field, the combination must do more than yield a predictable result.” KSR, 550 U.S. at 416. For this reason and the specific reasons discussed below, we find Patent Owner’s arguments unpersuasive. The evidence of record suggests that it would have been within the ordinary skill in the art to modify Ueda’s system by replacing direct communication between content-providing device 150 and servers 191 or 192 with an indirect connection in the form of proxy servers using well-known, predictable techniques as described in the SIP Standard.” slip op. at 33

    Patent outcomesUS 9,769,427 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,769,427
  • PTAB · Feb 5, 2025 · IPR2023-01240 · APJ Christopher L Ogden · IPR · Final written decision

    Claims 1–9, 14–18, 20, 22, 32, and 34–36 are unpatentable as obvious over Ueda, the SIP Standard, and the SDP Standard, with dependent claims 2, 3, 15, and 17 also relying on Cohee.

    RulingsFinal written decision
    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artPriority date, deniedDecided for petitioner

      “Taniguchi’s activities during the relevant time frame, we find that Patent Owner has not produced sufficient corroborating evidence to show that Mr. Taniguchi’s work on reducing to practice the claimed invention was reasonably continuous during the critical period between September 19, 2008 (the filing date of Ueda), and November 18, 2008 (the filing date of the Japanese patent application). Although there is corroborating evidence of diligence beginning on November 6, 2008, when Mr. Taniguchi transmitted a draft application to the Baba law firm, there is no evidence of any diligence prior to that date, other than Mr. Taniguchi’s own testimony. We do not agree with Patent Owner that the evidence of Mr. Taniguchi’s other activities for NEC, or research relating to IPTV, corroborate Mr. Taniguchi’s reduction to practice of the claimed invention. Although these activities may have something to do with the general subject matter of IPTV, Patent Owner has not shown any nexus between these activities and the challenged claims. See Naber v. Cricchi, 567 F.2d at 385 (“It is well settled that, to satisfy the ‘reasonable diligence’ requirement . . . , the work relied on must ordinarily be directly related to reduction to practice of the invention . . . in issue.” (citing cases)). Although Mr. Taniguchi doubtlessly spent substantial time preparing the application he completed on November 6, 2008 (see Ex. 2017), there is no corroborating evidence that this work was reasonably continuous during the critical period. As far as the corroborating evidence attests, Mr. Taniguchi could have done no work on the draft until early November, or he could have worked on the draft briefly in August and put it aside until early November. Considering all the evidence as to Mr. Taniguchi’s activities, we find that Patent Owner has not met its burden of producing corroborating evidence that the named inventors of the ’427 patent exercised reasonably continuous diligence during the critical period when Ueda was filed until the” slip op. at 23

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “In general, we disagree with Patent Owner that, in showing a reason to incorporate the SIP Standard’s teachings about proxy servers, Petitioner must necessarily show that Ueda’s system was deficient or inferior. A patent challenger “does not need to show that there was a known problem with the prior art system in order to articulate the required rational underpinning for the proposed combination.” Unwired Planet, LLC v. Google Inc., 841 F.3d 995, 1002–03 (Fed. Cir. 2016). Also, “when a patent claims a structure already known in the prior art that is altered by the mere substitution of one element for another known in the field, the combination must do more than yield a predictable result.” KSR, 550 U.S. at 416. For this reason and the specific reasons discussed below, we find Patent Owner’s arguments unpersuasive. The evidence of record suggests that it would have been within the ordinary skill in the art to modify Ueda’s system by replacing direct communication between content-providing device 150 and servers 191 or 192 with an indirect connection in the form of proxy servers using well-known, predictable techniques as described in the SIP Standard.” slip op. at 32

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › Teaching awayTeaching away not foundDecided for petitioner

      “(4) Whether Ueda Teaches Away from Providing Play-list Information While Establishing a Connection Finally, Patent Owner argues that Ueda teaches away from providing “play-list information” at the same time as establishing a connection, because Ueda teaches successfully completing user authentication before transmitting the playlist. PO Resp. 52–53 (citing Ex. 1003 ¶¶ 56, 365, Fig. 25; Ex. 2001 ¶ 99). According to Patent Owner, “Petitioner’s argument fails to reconcile[] this ordering of Ueda, which would prevent implementation of the proposed combination with the SDP Standard, in which the playlist is transmitted as part of the ‘Session Initiation.’” Id. at 53 (citing Ex. 2001 ¶ 100). In its Reply, Petitioner argues that limitation 1g “does not require transmitting ‘play-list information’ ‘at the same time’ as authentication, but at a same time ‘the one or more connection control servers executes a process for guaranteeing a communication bandwidth . . . as a process for establishing the connection.’” Pet. Reply 23. Petitioner also argues that the ’427 patent also describes an authentication step before transmitting the play-list information. Id. (citing Ex. 1001, 12:56–13:13, 13:50–58, Fig. 4). We find Petitioner’s arguments persuasive, and we disagree with Patent Owner that claim 1 restricts the timing of user authentication. As Petitioner notes, user authentication occurs in the ’427 patent before the process of establishing a connection as depicted in Figure 5. See Ex. 1001, 12:36–55, Fig. 4 (user authentication occurs when user equipment 2 is powered-up); id. at 13:50–58 (SIP message A501, at the beginning of Figure 5, includes “user authentication success information”). But we find nothing in the claim language, itself, that requires any particular timing for authentication. Nor do we understand Petitioner’s motivation-to-combine argument to hinge on the timing of authentication. Thus, Ueda does not “criticize, discredit, or otherwise discourage” the claimed invention. In re Fulton, 391 F.3d 1195, 1201 (Fed. Cir. 2004).” slip op. at 58

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightDecided for petitioner

      “We find Petitioner’s arguments persuasive. Petitioner does not rely solely on the SDP Standard for teaching the sending of play-list information, but also relies on Ueda, which discloses sending a playlist including an identification of main content, commercial content, and an output sequence, as we discuss in more detail below in the context of limitation 1h. See infra Section III.D.3(g). Petitioner relies on the SIP and SDP Standards for teaching that Ueda’s playlist, as with other data describing a session, may be formatted and transmitted as payload within a standard SIP message, for example using SDP fields. Based on the evidence of record, we find it persuasive that a person of ordinary skill in the art would have recognized SDP as a known way to format play-list information, since SDP has specific fields to convey the features of a playlist such as metadata and links to the content. See Pet. 50–52. Petitioner’s arguments are not based on improper hindsight bias. Although Petitioner argues that the SDP Standard “can” or “could” be used to format Ueda’s playlist, the evidence suggests that doing so would merely be “[t]he combination of familiar elements according to known methods,” and that kind of combination “is likely to be obvious when it does no more than yield predictable results.” KSR, 550 U.S. at 416. The evidence shows that is the case here. As such, the Petition relies on the predictable combination of the prior art according to known methods and on various motivations to combine the references (see Supra Sections III.D.1–2), not on the ’427 patent itself, for teaching the combination.” slip op. at 57

    Patent outcomesUS 9,769,427 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,769,427
  • PTAB · Jan 17, 2025 · IPR2024-00597 · APJ Jon B Tornquist · IPR · Final written decision

    Claims 2–4 and 6–18 are unpatentable as obvious over Abe and Guyomard, with claims 9–10 also obvious over Iwaizono; claims 1 and 5 were not shown unpatentable.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art “would have had a Master’s degree in material science, chemical engineering, chemistry, or similar field with four years of experience designing testing, and building secondary lithium batteries.” Pet. 11 (citing Ex. 1002 ¶ 51). Petitioner further contends that a person of ordinary skill in the art would have been aware of “(1) positive electrode materials, (2) negative electrode materials, (3) separators, (4) electrolytes, (5) charge-discharge parameters, and (6) protection circuits, as well as ‘battery failure modes’ such as plating and the formation of dendrites.” Id. (citing Ex. 1002 ¶¶ 50–51). Patent Owner “does not dispute Petitioner’s level of ordinary skill.” PO Resp. 17. Upon review of the prior art of record and the parties’ arguments, we adopt Petitioner’s unopposed definition of the person of ordinary skill in the art as it is consistent with the disclosures of the ’641 patent and the prior art of record.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “We also agree with Patent Owner that the charge cut-off voltage is not necessarily the applied voltage during charging. PO Resp. 20. Rather, depending on the charging protocol used and when in the charging cycle the voltage is applied, the applied voltage could be higher than the battery voltage. Ex. 2013; Ex. 2006 ¶ 91. For example, as discussed in more detail below with respect to the Uemura grounds, when fast charging using constant current is used and the charging rate is not slow, the applied voltage will be higher than the battery voltage when the constant current charging phase is stopped. Ex. 2006 ¶ 91; Ex. 2013. Likewise, during constant current/constant voltage charging, the applied voltage approximates the battery voltage only when the battery is nearly completely charged. Ex. 2013; Ex. 2006 ¶ 91. Thus, the applied voltage may be, but is not necessarily, the charge cut-off voltage. In view of the foregoing, we construe “charge cut-off voltage” in claims 1 and 5 as “the maximum value to which the battery is configured to be charged.” PO Resp. 18; Ex. 2008, 217:6–11; Pet. Reply 5. Contrary to Patent Owner’s arguments, however, we do not understand the phrase “configured to be charged” to necessarily represent a single voltage for the battery that is determined based on the structure and chemistry of the battery. Pet. Reply 4–5. Rather, the charge cut-off voltage is a selected potential, or voltage, of the battery or cell at the end of charging that is controlled by a circuit or device, such as a charger or control circuit within the battery. Ex. 1001, 9:50–55; Ex. 1048, 2, 7–8; Ex. 1008, 3:9–13. And, for the reasons discussed herein, the charge cut-off voltage may be, but is not necessarily, the same as the applied voltage during charging. PO Resp. 20.” slip op. at 15

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “charge cut-off voltage “greater than 4.2 V but less than 5.8 V” and calculating a specific or theoretic capacity “with a charge cut-off voltage limited to 4.2” (claim 1) or “with a charge cut-off voltage set at 4.2 V” (claim 5). Ex. 1001, 16:56–61, 17:6–11. Although the parties dispute the precise scope of these claim terms, the parties agree that the first use of “charge cut-off voltage” in claims 1 and 5 refers to the potential of the battery as a whole (between the cathode and the anode), and not a half-cell voltage using lithium metal as a counter electrode.10 Tr. 17:1–3 (agreeing 10 With respect to the phrase “as calculated by a theoretic capacity with a charge cut-off voltage set at 4.2 V,” the parties in fact appear to be in that the first use of “charge cut-off voltage” in claim 5 refers to a full-cell voltage); Sur-reply 5; PO Resp. 22. We need not further construe the claims to resolve the disputes between the parties. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”)).” slip op. at 16

    • Expert testimonyPatent owner expert creditedDecided for patent owner

      “Given Mr. Juzkow’s unambiguous testimony that Uemura uses constant current charging that would stop when the applied voltage reached 11 The chart is reproduced from SAFT, Charging your lithium-ion batteries: 5 expert tips for a longer lifespan, (https://www.saft.com/energizing-iot/charging-your-lithium-ion-batteries-5-expert-tips-longerlifespan#:~: text=When%20the%20battery%20provides%20current,This%20restore s%20the%20battery's%20capacity). 4.3 V, as well as Dr. Yao’s persuasive testimony that Uemura’s constant charging rate is not slow, we credit the testimony of Dr. Yao that one of ordinary skill in the art would have understood that the internal voltage to which the battery of Uemura was charged is less than 4.3 V. Ex. 2006 ¶ 119. In particular, Dr. Yao persuasively testifies that one of ordinary skill in the art would have believed that the charge cut-off voltage was no more than 4.2 V, and most likely equal to “about 4 V.” Id. ¶¶ 119–122.” slip op. at 21

    Patent outcomesUS 7,749,641 mixed
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,749,641

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.