  • PTAB · Apr 15, 2026 · IPR2025-00187 · APJ Debra L Dennett · IPR · Final written decision

    Claims 1–17 are unpatentable under § 103, principally because Chang in view of Jin renders them obvious; the Jin/Feldmann grounds were not shown.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art would have been someone with an advanced degree involving the disciplines of electrical engineering, applied physics, chemistry, or materials science, and at least two years of experience designing, developing, or researching in the field. Alternatively, that person would have had a bachelor’s degree in electrical engineering, applied physics, or materials science, and at least three years of experience designing, developing, or researching in the field. Pet. 4 (citing Ex. 1003 ¶ 49).” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that “[n]o claim construction is believed to be necessary to resolve this Petition.” Pet. 24. Patent Owner does not address claim construction. See generally Resp.; Sur-reply. For purposes of this Decision, we need not expressly construe any claim terms. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (holding that “only those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy”); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs. in the context of an inter partes review).” slip op. at 11

    • Expert testimonyPatent owner expert creditedDecided for patent owner

      “gap-T isolation region would prevent shorting and that extending the tunnel oxide layer the edge “could trap impurities and create negative fixed oxide charges, which could then create a p-type inversion in the n-type base substrate, leading to a leakage path to the p-type emitter on the front of the solar cell” (Ex. 1003 ¶ 116 (emphasis added)) but are not convinced by his equivocal testimony. Notably too, neither Jin nor Feldmann discuss issues relating to trapped impurities and Petitioner, as well as Dr. Banerjee, fail to direct our attention to any record evidence to support their contentions. Rather, we are persuaded by Dr. Peckerar’s testimony that as a general rule in semiconductor process technology, a bare silicon surface should not be left unpassivated after processing. Elemental silicon is highly chemically reactive. As such, the bare surface is a “magnet” for defects and contamination. Leaving the tunnel oxide in place across the entire substrate backside would reduce this problem. Ex. 2001 ¶ 142. Dr. Peckerar further explains that a person of ordinary skill in the art would have known how to avoid shorting and leakage. In particular, he testifies that the manner by which charge is transported through a tunnel oxide can be controlled by adjusting manufacturing parameters such as time, temperature, thickness, and ambient impurities. A POSITA would plainly have adjusted these parameters to ensure that the tunnel oxide operates as intended (i.e., minimizes recombinant losses while transporting charge carriers to the backside of the solar cell) while avoiding undesirable leakage current. Because unwanted leakage charge can be avoided via other means during manufacture, there would have been no reason to reduce the physical extent of the tunnel oxide. Ex. 2001 ¶ 152 (referring to Ex. 2001 ¶¶ 149–151). Moreover, Dr. Peckerar testifies that “Dr. Banerjee also appears to be arguing that incorporation of impurities into the oxide will produce a MOSFET-like structure, with the contaminated oxide acting as a MOS gate leading to enhanced leakage,” but, for that to occur, “the source and drain areas would need to be of the same type.” Ex. 2001 ¶ 159. Here however, “the tunnel oxide layer is located between an n-type polysilicon layer and p-type frontside emitter layer” so “[n]o MOSFET-like structure can form because the source and drain are of different types.” Ex. 2001 ¶ 159. Neither Petitioner nor Dr. Banerjee address or dispute this testimony. See generally Reply; Ex. 1037. We credit Dr. Peckerar’s testimony in this regard. Without an apparent reason to modify the teachings of Jin and Feldmann to” slip op. at 19

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightNot shown unpatentableMotivation not foundNot shown unpatentable

      “On this complete trial record, we agree with Patent Owner. It is improper to base a conclusion of obviousness upon facts gleaned only through hindsight. “The invention must be viewed not after the blueprint has been drawn by the inventor, but as it would have been perceived in the state of the art that existed at the time the invention was made.” Sensonics, Inc. v. Aerosonic Corp., 81 F.3d 1566, 1570 (Fed. Cir. 1996) (citing Interconnect Planning Corp. v. Feil, 774 F.2d 1132, 1138 (Fed. Cir. 1985)). Therefore, “to establish a prima facie case of obviousness based on a combination of elements disclosed in the prior art, the [Petitioner] must articulate the basis on which it concludes that it would have been obvious to make the claimed invention.” Id. Impermissible hindsight is inferred when the specific understanding or principle within the knowledge of one of ordinary skill in the art that would motivate one (with no knowledge of the claimed invention) to make the proposed combination has not been explained. In re Rouffet, 149 F.3d 1350, 1358 (Fed. Cir. 1998).” slip op. at 17

    Patent outcomesUS 10,230,009 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,230,009
  • PTAB · Apr 15, 2026 · IPR2025-00917 · APJ Debra L Dennett · IPR · Final written decision

    Claims 1–17 are unpatentable under § 103 over Chang and Jin, alone or with Seo or Watanabe; the Jin and Feldmann grounds were not shown.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “In light of the record before us, we adopt Petitioner’s proposal regarding the level of ordinary skill in the art. Based on our review of the ’009 patent and the prior art of record, we determine that the definition offered by Petitioner comports with the qualifications a person would have needed to understand the ’009 patent and the prior art.” slip op. at 10

    • Expert testimonyPatent owner expert creditedDecided for patent owner

      “We acknowledge Dr. Banerjee’s testimony that the combination of Jin’s gap-T isolation region would prevent shorting and that extending the tunnel oxide layer the edge “could trap impurities and create negative fixed oxide charges, which could then create a p-type inversion in the n-type base substrate, leading to a leakage path to the p-type emitter on the front of the solar cell” (Ex. 1003 ¶ 116 (emphasis added)) but are not convinced by his equivocal testimony. Notably too, neither Jin nor Feldmann discuss issues relating to trapped impurities and Petitioner, as well as Dr. Banerjee, fail to direct our attention to any record evidence to support their contentions. Rather, we are persuaded by Dr. Peckerar’s testimony that as a general rule in semiconductor process technology, a bare silicon surface should not be left unpassivated after processing. Elemental silicon is highly chemically reactive. As such, the bare surface is a “magnet” for defects and contamination. Leaving the tunnel oxide in place across the entire substrate backside would reduce this problem. Ex. 2001 ¶ 142. Dr. Peckerar further explains that a person of ordinary skill in the art would have known how to avoid shorting and leakage. In particular, he testifies that the manner by which charge is transported through a tunnel oxide can be controlled by adjusting manufacturing parameters such as time, temperature, thickness, and ambient impurities. A POSITA would plainly have adjusted these parameters to ensure that the tunnel oxide operates as intended (i.e., minimizes recombinant losses while transporting charge carriers to the backside of the solar cell) while avoiding undesirable leakage current. Because unwanted leakage charge can be avoided via other means during manufacture, there would have been no reason to reduce the physical extent of the tunnel oxide. Ex. 2001 ¶ 152 (referring to Ex. 2001 ¶¶ 149–151). Moreover, Dr. Peckerar testifies that “Dr. Banerjee also appears to be arguing that incorporation of impurities into the oxide will produce a MOSFET-like structure, with the contaminated oxide acting as a MOS gate leading to enhanced leakage,” but, for that to occur, “the source and drain areas would need to be of the same type.” Ex. 2001 ¶ 159. Here however, “the tunnel oxide layer is located between an n-type polysilicon layer and p-type frontside emitter layer” so “[n]o MOSFET-like structure can form because the source and drain are of different types.” Ex. 2001 ¶ 159. Neither Petitioner nor Dr. Banerjee address or dispute this testimony. See generally Reply; Ex. 1037. We credit Dr. Peckerar’s testimony in this regard.” slip op. at 19

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation not foundNot shown unpatentableNot shown unpatentable

      “On this complete trial record, we agree with Patent Owner. It is improper to base a conclusion of obviousness upon facts gleaned only through hindsight. “The invention must be viewed not after the blueprint has been drawn by the inventor, but as it would have been perceived in the state of the art that existed at the time the invention was made.” Sensonics, Inc. v. Aerosonic Corp., 81 F.3d 1566, 1570 (Fed. Cir. 1996) (citing Interconnect Planning Corp. v. Feil, 774 F.2d 1132, 1138 (Fed. Cir. 1985)). Therefore, “to establish a prima facie case of obviousness based on a combination of elements disclosed in the prior art, the [Petitioner] must articulate the basis on which it concludes that it would have been obvious to make the claimed invention.” Id. Impermissible hindsight is inferred when the specific understanding or principle within the knowledge of one of ordinary skill in the art that would motivate one (with no knowledge of the claimed invention) to make the proposed combination has not been explained. In re Rouffet, 149 F.3d 1350, 1358 (Fed. Cir. 1998).” slip op. at 17

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundUnpatentableUnpatentable

      “Patent Owner focuses on Chang’s description in paragraph 76 of a single configuration in which the emitter area and back surface field area are not adjacent to each other, thus eliminating “the necessity of performing an isolation process when the emitter area [] and the back surface field are [] are formed to be adjacent to each other.” Resp. 42 (citing Ex. 1013 ¶ 76). In so doing, Patent Owner side steps Chang’s unambiguous definition that “‘entirely formed’ means that an element such as a layer is formed over an entire surface without an empty area or a non-coverage area, or is formed over an entire area excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like.” Ex. 1013 ¶¶ 45, 51, 56, 62 (emphasis added). Chang discloses that a first tunneling layer, a first portion of an emitter area, a second tunneling layer, and a back surface field area may each be “formed over an entire area excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like.” Id. Chang’s definition of “entirely formed” (“excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like”) implies use of a mask. See Chang ¶ 62; Tr. 15:20–17:11. Dr. Banerjee testifies that the need to electrically isolate the emitter region from the back surface field was well known in the field, and both Chang and Jin teach backside isolation regions. Ex. 1003 ¶¶ 73, 217 (citing Ex. 1023 § 1). Chang also discloses that the emitter area may be formed by thermal diffusion, ion implantation or the like. Ex. 1013 ¶ 98. Petitioner persuasively argues that Chang’s disclosure of thermal diffusion of the emitter layer would result in dopants diffused into not only the top surface of the substrate, but also the exposed lateral surfaces, a problem also noted in Jin. See Pet. 11–12; Reply 6–7; Ex. 1003 ¶ 71; Ex. 1009 ¶¶ 57–58. Jin discloses avoiding shorting of the emitter layer and back surface field layer by edge isolation on the back surface field layer using a mask to create a “gap-T.” Ex. 1009 ¶¶ 57–58, 83. Chang discloses excluding a tunneling layer and a base surface field area from periphery region and isolation region. Ex. 1013 ¶¶ 56, 62. Using a mask, as implied in Chang and explicitly disclosed in Jin, would “pre-designate” and/or “inevitably form” the regions where the tunneling layer and back surface field area are excluded. We credit Dr. Banerjee’s testimony that one of ordinary skill in the art reviewing Chang would therefore understand the importance of implementing the isolation region in Chang’s device, and would therefore be motivated to look to other references, such as Jin (which was assigned to the same original assignee as Chang, LG Electronics, EX1009-Jin, face; EX1013-Chang, face) to understand details regarding Chang’s isolation region.” slip op. at 32

    Patent outcomesUS 10,230,009 unpatentable
    § 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,230,009
  • PTAB · Apr 15, 2026 · IPR2025-00006 · APJ Debra L Dennett · IPR · Final written decision

    Claims 1–17 are unpatentable under § 103, principally over Chang and Jin; the Board rejected the Jin and Feldmann combinations for lack of a reason to combine.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “In light of the record before us, we adopt Petitioner’s proposal regarding the level of ordinary skill in the art. Based on our review of the ’009 patent and the prior art of record, we determine that the definition offered by Petitioner comports with the qualifications a person would have needed to understand the ’009 patent and the prior art.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that “[n]o claim construction is believed to be necessary to resolve this Petition.” Pet. 24. Patent Owner does not address claim construction. See generally Resp.; Sur-reply. For purposes of this Decision, we need not expressly construe any claim terms. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (holding that “only those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy”); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs. in the context of an inter partes review).” slip op. at 11

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightNot shown unpatentableMotivation not foundNot shown unpatentable

      “However, Petitioner proposes to remove the tunnel oxide layer from the edge and offers little explanation of why the skilled artisan would apply Jin’s gap- T isolation region to both of Feldmann’s polysilicon and tunnel oxide layers. As noted above, Petitioner states that the skilled artisan would have included Jin’s gap-T isolation region in order to prevent shorting. Pet. 26. Petitioner’s reasoning is questionable—supported only by the conclusory testimony of Dr. Banerjee. Dr. Banerjee’s testimony offers no more evidentiary support than provided in the Petition. Compare Ex. 1003 ¶ 116 with Pet. 26). Petitioner cannot satisfy its burden of proving obviousness by employing “mere conclusory statements.” See Magnum, 829 F.3d at 1380. We acknowledge Dr. Banerjee’s testimony that the combination of Jin’s gap-T isolation region would prevent shorting and that extending the tunnel oxide layer the edge “could trap impurities and create negative fixed oxide charges, which could then create a p-type inversion in the n-type base substrate, leading to a leakage path to the p-type emitter on the front of the solar cell” (Ex. 1003 ¶ 116 (emphasis added)) but are not convinced by his equivocal testimony. Notably too, neither Jin nor Feldmann discuss issues relating to trapped impurities and Petitioner, as well as Dr. Banerjee, fail to direct our attention to any record evidence to support their contentions. Rather, we are persuaded by Dr. Peckerar’s testimony that as a general rule in semiconductor process technology, a bare silicon surface should not be left unpassivated after processing. Elemental silicon is highly chemically reactive. As such, the bare surface is a “magnet” for defects and contamination. Leaving the tunnel oxide in place across the entire substrate backside would reduce this problem. Ex. 2001 ¶ 142. Dr. Peckerar further explains that a person of ordinary skill in the art would have known how to avoid shorting and leakage. In particular, he testifies that the manner by which charge is transported through a tunnel oxide can be controlled by adjusting manufacturing parameters such as time, temperature, thickness, and ambient impurities. A POSITA would plainly have adjusted these parameters to ensure that the tunnel oxide operates as intended (i.e., minimizes recombinant losses while transporting charge carriers to the backside of the solar cell) while avoiding undesirable leakage current. Because unwanted leakage charge can be avoided via other means during manufacture, there would have been no reason to reduce the physical extent of the tunnel oxide. Ex. 2001 ¶ 152 (referring to Ex. 2001 ¶¶ 149–151). Moreover, Dr. Peckerar testifies that “Dr. Banerjee also appears to be arguing that incorporation of impurities into the oxide will produce a MOSFET-like structure, with the contaminated oxide acting as a MOS gate leading to enhanced leakage,” but, for that to occur, “the source and drain areas would need to be of the same type.” Ex. 2001 ¶ 159. Here however, “the tunnel oxide layer is located between an n-type polysilicon layer and p-type frontside emitter layer” so “[n]o MOSFET-like structure can form because the source and drain are of different types.” Ex. 2001 ¶ 159. Neither Petitioner nor Dr. Banerjee address or dispute this testimony. See generally Reply; Ex. 1037. We credit Dr. Peckerar’s testimony in this regard.” slip op. at 19

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “configuration in which the emitter area and back surface field area are not adjacent to each other, thus eliminating “the necessity of performing an isolation process when the emitter area [] and the back surface field are [] are formed to be adjacent to each other.” Resp. 42 (citing Ex. 1013 ¶ 76). In so doing, Patent Owner side steps Chang’s unambiguous definition that “‘entirely formed’ means that an element such as a layer is formed over an entire surface without an empty area or a non-coverage area, or is formed over an entire area excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like.” Ex. 1013 ¶¶ 45, 51, 56, 62 (emphasis added). Chang discloses that a first tunneling layer, a first portion of an emitter area, a second tunneling layer, and a back surface field area may each be “formed over an entire area excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like.” Id. Chang’s definition of “entirely formed” (“excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like”) implies use of a mask. See Chang ¶ 62; Tr. 15:20–17:11. Dr. Banerjee testifies that the need to electrically isolate the emitter region from the back surface field was well known in the field, and both Chang and Jin teach backside isolation regions. Ex. 1003 ¶¶ 73, 217 (citing Ex. 1023 § 1). Chang also discloses that the emitter area may be formed by thermal diffusion, ion implantation or the like. Ex. 1013 ¶ 98. Petitioner persuasively argues that Chang’s disclosure of thermal diffusion of the emitter layer would result in dopants diffused into not only the top surface of the substrate, but also the exposed lateral surfaces, a problem also noted in Jin. See Pet. 11–12; Reply 6–7; Ex. 1003 ¶ 71; Ex. 1009 ¶¶ 57–58. Jin discloses avoiding shorting of the emitter layer and back surface field layer by edge isolation on the back surface field layer using a mask to create a “gap-T.” Ex. 1009 ¶¶ 57–58, 83. Chang discloses excluding a tunneling layer and a base surface field area from periphery region and isolation region. Ex. 1013 ¶¶ 56, 62. Using a mask, as implied in Chang and explicitly disclosed in Jin, would “pre-designate” and/or “inevitably form” the regions where the tunneling layer and back surface field area are excluded. We credit Dr. Banerjee’s testimony that one of ordinary skill in the art reviewing Chang would therefore understand the importance of implementing the isolation region in Chang’s device, and would therefore be motivated to look to other references, such as Jin (which was assigned to the same original assignee as Chang, LG Electronics, EX1009-Jin, face; EX1013-Chang, face) to understand details regarding Chang’s isolation region.” slip op. at 32

    Patent outcomesUS 10,230,009 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,230,009
  • PTAB · Apr 15, 2026 · IPR2025-00918 · APJ Avelyn M Ross · IPR · Final written decision

    Claims 1–11 are unpatentable under § 103 over Chang and Jin; the Board rejected the Jin and Feldmann based grounds for lack of a reason to combine without hindsight.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art would have been someone with an advanced degree involving the disciplines of electrical engineering, applied physics, chemistry, or materials science, and at least two years of experience designing, developing, or researching in the field. Alternatively, that person would have had a bachelor’s degree in electrical engineering, applied physics, or materials science, and at least three years of experience designing, developing, or researching in the field.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that “[n]o claim construction is believed to be necessary to resolve this Petition.” Pet. 23. And, Patent Owner does not address claim construction. See generally PO Resp. As neither party proposes an express construction for our consideration and because we determine that an express claim construction is not necessary for us to render a decision in this matter, we do not construe any claim terms. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (holding that “only those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy”); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs. in the context of an inter partes review).” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightNot shown unpatentableMotivation not foundNot shown unpatentable

      “base a conclusion of obviousness upon facts gleaned only through hindsight. “The invention must be viewed not after the blueprint has been drawn by the inventor, but as it would have been perceived in the state of the art that existed at the time the invention was made.” Sensonics, Inc. v. Aerosonic Corp., 81 F.3d 1566, 1570 (Fed. Cir. 1996) (citing Interconnect Planning Corp. v. Feil, 774 F.2d 1132, 1138 (Fed. Cir. 1985)). Therefore, “to establish a prima facie case of obviousness based on a combination of elements disclosed in the prior art, the [Petitioner] must articulate the basis on which it concludes that it would have been obvious to make the claimed invention.” Id. Impermissible hindsight is inferred when the specific understanding or principle within the knowledge of one of ordinary skill in the art that would motivate one (with no knowledge of the claimed invention) to make the proposed combination has not been explained. In re Rouffet, 149 F.3d 1350, 1358 (Fed. Cir. 1998).” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “Patent Owner focuses on Chang’s description in paragraph 76 of a single configuration in which the emitter area and back surface field area are not adjacent to each other, thus eliminating “the necessity of performing an isolation process when the emitter area [] and the back surface field are [] are formed to be adjacent to each other.” PO Resp. 42–43 (citing Ex. 1013 ¶ 76). But, in so doing, Patent Owner side steps Chang’s unambiguous definition that “‘entirely formed’ means that an element such as a layer is formed over an entire surface without an empty area or a non-coverage area, or is formed over an entire area excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like.” Ex. 1013 ¶¶ 45, 51, 56, 62 (emphasis added). Chang discloses that a first tunneling layer, a first portion of an emitter area, a second tunneling layer, and a back surface field area may each be “formed over an entire area excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like.” Ex. 1013 ¶¶ 45, 51, 56, 62. Chang’s definition of “entirely formed” (“excluding pre-designated or inevitably formed regions such as periphery region, isolation region or the like”) implies use of a mask. See Ex. 1013 ¶ 62; Tr. 15:20– 17:11. Dr. Banerjee testifies that the need to electrically isolate the emitter region from the back surface field was well known in the field, and both Chang and Jin teach backside isolation regions. Ex. 1003 ¶¶ 70–81, 91–96, 200 (citing Ex. 1026 § 1 and stating that “[b]oth Chang and Jin likewise teach backside isolation regions”). Chang also discloses that the emitter area may be formed by “thermal diffusion, ion implantation or the like.” Ex. 1013 ¶ 98. Petitioner persuasively argues that Chang’s disclosure of thermal diffusion of the emitter layer would result in dopants diffused into not only the top surface of the substrate, but also the exposed lateral surfaces, a problem also noted in Jin. See Pet. 11–12; Pet. Reply 6–7; Ex. 1003 ¶ 71; Ex. 1009 ¶¶ 57–58. Jin discloses avoiding shorting of the emitter layer and back surface field layer by edge isolation on the back surface field layer using a mask to create a “gap-T.” Ex. 1009 ¶¶ 57–58, 83. Chang discloses excluding the second tunneling layer and a base surface field area from periphery region and isolation portion. Ex. 1013 ¶¶ 56, 62. Using a mask, as implied in Chang and explicitly disclosed in Jin, would “pre-designate” and/or “inevitably form” the regions where the tunneling layer and back surface field area are excluded. We credit Dr. Banerjee’s testimony that one of ordinary skill in the art “reviewing Chang would therefore understand the importance of implementing the isolation region in Chang’s device, and would therefore be motivated to look to other references, such as Jin (which was assigned to the same original assignee as Chang, LG Electronics, EX1009-Jin, face; EX1013-Chang, face) to understand details regarding Chang’s isolation region.” Ex. 1003 ¶ 201.” slip op. at 33

    Patent outcomesUS 9,722,104 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,722,104
  • PTAB · Apr 15, 2026 · IPR2025-00186 · APJ Avelyn M Ross · IPR · Final written decision

    Claims 1–11 are unpatentable under § 103 over Chang and Jin; the Board found the combination disclosed the claimed isolation portion and supported the challenged claims.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art would have been someone with an advanced degree involving the disciplines of electrical engineering, applied physics, chemistry, or materials science, and at least two years of experience designing, developing, or researching in the field. Alternatively, that person would have had a bachelor’s degree in electrical engineering, applied physics, or materials science, and at least three years of experience designing, developing, or researching in the field. Pet. 4 (citing Ex. 1003 ¶ 49). Patent Owner does not address the level of ordinary skill in the art. See generally PO Resp; Sur-reply. In light of the complete trial record before us, we adopt Petitioner’s proposal regarding the level of ordinary skill in the art. Based on our review of the ’104 patent and the prior art of record, we determine that the definition offered by Petitioner comports with the qualifications a person would have needed to understand the ’104 patent and the prior art.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “C. Claim Construction We construe claim terms according to the standard set forth in Phillips v. AWH Corp., 415 F.3d 1303, 1312–17 (Fed. Cir. 2005) (en banc); 37 C.F.R. § 42.100(b). Under Phillips, we give claim terms “their ordinary and customary meaning.” Phillips, 415 F.3d at 1312. “[T]he ordinary and customary meaning of a claim term is the meaning that the term would have to a person of ordinary skill in the art in question at the time of the invention.” Id. at 1313. “Importantly, the person of ordinary skill in the art is deemed to read the claim term not only in the context of the particular claim in which the disputed term appears, but in the context of the entire patent, including the specification.” Id. Petitioner contends that “[n]o claim construction is believed to be necessary to resolve this Petition.” Pet. 23. And, Patent Owner does not address claim construction. See generally PO Resp. As neither party proposes an express construction for our consideration and because we determine that an express claim construction is not necessary for us to render a decision in this matter, we do not construe any claim terms. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (holding that “only those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy”); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs. in the context of an inter partes review).” slip op. at 10

    • Expert testimonyPetitioner expert discountedPatent owner expert creditedMixed

      “edge and offers little explanation of why the skilled artisan would apply Jin’s gap- T isolation region to both of Feldmann’s polysilicon and tunnel oxide layers. As noted above, Petitioner states that the skilled artisan would have included Jin’s gap-T isolation region in order to prevent shorting. Pet. 25. Petitioner’s reasoning is questionable—supported only by the conclusory testimony of Dr. Banerjee. Dr. Banerjee’s testimony offers no more evidentiary support than provided in the Petition. Compare Ex. 1003 ¶ 113, with Pet. 25. Petitioner cannot satisfy its burden of proving obviousness by employing “mere conclusory statements.” Magnum Oil, 829 F.3d at 1380. We acknowledge Dr. Banerjee’s testimony that the combination of Jin’s gap-T isolation region would prevent shorting and that extending the tunnel oxide layer the edge “could trap impurities and create negative fixed oxide charges, which could then create a p-type inversion in the n-type base substrate, leading to a leakage path to the p-type emitter on the front of the solar cell” (Ex. 1003 ¶ 113 (emphasis added)) but are not convinced by his equivocal testimony. Notably too, neither Jin nor Feldmann discuss issues relating to trapped impurities and Petitioner, as well as Dr. Banerjee, fail to direct our attention to any record evidence to support their contentions. Rather, we are persuaded by Dr. Peckerar’s testimony that as a general rule in semiconductor process technology, a bare silicon surface should not be left unpassivated after processing. Elemental silicon is highly chemically reactive. As such, the bare surface is a “magnet” for defects and contamination. Leaving the tunnel oxide in place across the entire substrate backside would reduce this problem. Ex. 2001 ¶ 142. Dr. Peckerar further explains that a person of ordinary skill in the art would have known how to avoid shorting and leakage. In particular, he testifies that the manner by which charge is transported through a tunnel oxide can be controlled by adjusting manufacturing parameters such as time, temperature, thickness, and ambient impurities. A POSITA would plainly have adjusted these parameters to ensure that the tunnel oxide operates as intended (i.e., minimizes recombinant losses while transporting charge carriers to the backside of the solar cell) while avoiding undesirable leakage current. Because unwanted leakage charge can be avoided via other means during manufacture, there would have been no reason to reduce the physical extent of the tunnel oxide. Ex. 2001 ¶ 152 (referring to Ex. 2001 ¶¶ 149–151). Moreover, Dr. Peckerar testifies that “Dr. Banerjee also appears to be arguing that incorporation of impurities into the oxide will produce a MOSFET-like structure, with the contaminated oxide acting as a MOS gate leading to enhanced leakage,” but, for that to occur, “the source and drain areas would need to be of the same type.” Ex. 2001 ¶ 159. Here however, “the tunnel oxide layer is located between an n-type polysilicon layer and p-type frontside emitter layer” so “[n]o MOSFET-like structure can form because the source and drain are of different types.” Ex. 2001” slip op. at 18

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightNot shown unpatentableMotivation not foundNot shown unpatentable

      “base a conclusion of obviousness upon facts gleaned only through hindsight. “The invention must be viewed not after the blueprint has been drawn by the inventor, but as it would have been perceived in the state of the art that existed at the time the invention was made.” Sensonics, Inc. v. Aerosonic Corp., 81 F.3d 1566, 1570 (Fed. Cir. 1996) (citing Interconnect Planning Corp. v. Feil, 774 F.2d 1132, 1138 (Fed. Cir. 1985)). Therefore, “to establish a prima facie case of obviousness based on a combination of elements disclosed in the prior art, the [Petitioner] must articulate the basis on which it concludes that it would have been obvious to make the claimed invention.” Id. Impermissible hindsight is inferred when the specific understanding or principle within the knowledge of one of ordinary skill in the art that would motivate one (with no knowledge of the claimed invention) to make the proposed combination has not been explained. In re Rouffet, 149 F.3d 1350, 1358 (Fed. Cir. 1998).” slip op. at 16

    Patent outcomesUS 9,722,104 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,722,104
  • PTAB · Apr 15, 2026 · IPR2025-00007 · APJ Avelyn M Ross · IPR · Final written decision

    Claims 1–11 are unpatentable under §103 over Chang and Jin because the combination teaches the claimed isolation portion and the claimed tapering.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedOther

      “Petitioner contends that a person of ordinary skill in the art would have been someone with an advanced degree involving the disciplines of electrical engineering, applied physics, chemistry, or materials science, and at least two years of experience designing, developing, or researching in the field. Alternatively, that person would have had a bachelor’s degree in electrical engineering, applied physics, or materials science, and at least three years of experience designing, developing, or researching in the field. Pet. 4 (citing Ex. 1003 ¶ 49). Patent Owner does not address the level of ordinary skill in the art. See generally PO Resp; Sur-reply. In light of the complete trial record before us, we adopt Petitioner’s proposal regarding the level of ordinary skill in the art. Based on our review of the ’104 patent and the prior art of record, we determine that the definition offered by Petitioner comports with the qualifications a person would have needed to understand the ’104 patent and the prior art.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that “[n]o claim construction is believed to be necessary to resolve this Petition.” Pet. 23. And, Patent Owner does not address claim construction. See generally PO Resp. As neither party proposes an express construction for our consideration and because we determine that an express claim construction is not necessary for us to render a decision in this matter, we do not construe any claim terms. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (holding that “only those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy”); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs. in the context of an inter partes review).” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightTeaching away not foundNot shown unpatentable

      “On this complete trial record, we agree with Patent Owner. It is improper to base a conclusion of obviousness upon facts gleaned only through hindsight. “The invention must be viewed not after the blueprint has been drawn by the inventor, but as it would have been perceived in the state of the art that existed at the time the invention was made.” Sensonics, Inc. v. Aerosonic Corp., 81 F.3d 1566, 1570 (Fed. Cir. 1996) (citing Interconnect Planning Corp. v. Feil, 774 F.2d 1132, 1138 (Fed. Cir. 1985)). Therefore, “to establish a prima facie case of obviousness based on a combination of elements disclosed in the prior art, the [Petitioner] must articulate the basis on which it concludes that it would have been obvious to make the claimed invention.” Id. Impermissible hindsight is inferred when the specific understanding or principle within the knowledge of one of ordinary skill in the art that would motivate one (with no knowledge of the claimed invention) to make the proposed combination has not been explained. In re Rouffet, 149 F.3d 1350, 1358 (Fed. Cir. 1998).” slip op. at 16

    • Expert testimonyPatent owner expert creditedPetitioner expert discountedDecided for patent owner

      “However, Petitioner proposes to remove the tunnel oxide layer from the edge and offers little explanation of why the skilled artisan would apply Jin’s gap- T isolation region to both of Feldmann’s polysilicon and tunnel oxide layers. As noted above, Petitioner states that the skilled artisan would have included Jin’s gap-T isolation region in order to prevent shorting. Pet. 25. Petitioner’s reasoning is questionable—supported only by the conclusory testimony of Dr. Banerjee. Dr. Banerjee’s testimony offers no more evidentiary support than provided in the Petition. Compare Ex. 1003 ¶ 113, with Pet. 25. Petitioner cannot satisfy its burden of proving obviousness by employing “mere conclusory statements.” Magnum Oil, 829 F.3d at 1380. We acknowledge Dr. Banerjee’s testimony that the combination of Jin’s gap-T isolation region would prevent shorting and that extending the tunnel oxide layer the edge “could trap impurities and create negative fixed oxide charges, which could then create a p-type inversion in the n-type base substrate, leading to a leakage path to the p-type emitter on the front of the solar cell” (Ex. 1003 ¶ 113 (emphasis added)) but are not convinced by his equivocal testimony. Notably too, neither Jin nor Feldmann discuss issues relating to trapped impurities and Petitioner, as well as Dr. Banerjee, fail to direct our attention to any record evidence to support their contentions. Rather, we are persuaded by Dr. Peckerar’s testimony that as a general rule in semiconductor process technology, a bare silicon surface should not be left unpassivated after processing. Elemental silicon is highly chemically reactive. As such, the bare surface is a “magnet” for defects and contamination. Leaving the tunnel oxide in place across the entire substrate backside would reduce this problem. Ex. 2001 ¶ 142. Dr. Peckerar further explains that a person of ordinary skill in the art would have known how to avoid shorting and leakage. In particular, he testifies that the manner by which charge is transported through a tunnel oxide can be controlled by adjusting manufacturing parameters such as time, temperature, thickness, and ambient impurities. A POSITA would plainly have adjusted these parameters to ensure that the tunnel oxide operates as intended (i.e., minimizes recombinant losses while transporting charge carriers to the backside of the solar cell) while avoiding undesirable leakage current. Because unwanted leakage charge can be avoided via other means during manufacture, there would have been no reason to reduce the physical extent of the tunnel oxide.” slip op. at 18

    Patent outcomesUS 9,722,104 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,722,104
  • PTAB · Jan 14, 2026 · PGR2025-00059 · APJ Devon Zastrow Newman · PGR · Institution

    The Board instituted post-grant review of claims 1–4 on all four asserted grounds, finding a sufficient preliminary showing of obviousness and lack of enablement.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “V. CONCLUSION Petitioner has, at this stage, established that it will more likely than not prevail in showing that at least one of the challenged claims is unpatentable. This determination is, however, based on a preliminary record and is not final on any issues of patentability. We will make a final determination on the patentability of the challenged claims, as necessary and applying the preponderance of the evidence standard, based on a fully developed record through trial. VI. ORDER In consideration of the foregoing, it is hereby: ORDERED that, pursuant to 35 U.S.C. § 324(a) post grant review of claims 1–4 of the ’233 patent is hereby instituted on the grounds set forth in the Petition, commencing on the entry date of this Order, and pursuant to 35 U.S.C. § 324(d) and 37 C.F.R. § 42.4, notice is hereby given of the institution of a trial; and” slip op. at 40

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not proffer a description of a POSA. See generally, Prelim. Resp. For the purposes of this decision, on the record at this time, we find that Petitioner’s definition appears consistent with the level of skill shown in the prior art references of record, and apply it herein. See Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). We invite the parties to further address the definition of a POSA during trial should they find it necessary.” slip op. at 7

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “In addition, the opinion stated in the Pomper Declaration that “the term of ‘low molecular weight’ is well accepted in the chemical arts” and the declarant “recognize[s] that low molecular weight compounds would have a molecular weight of typically from about 50 Daltons to about 1,500 Daltons” is offered by a co-inventor. We, as factfinder, have discretion to weigh the credibility of expert witnesses and to give each item of evidence such weight as appropriate. See In re Am. Acad. of Sci. Tech Ctr., 367 F.3d 1359, 1368 (Fed. Cir. 2004) (“[T]he Board is entitled to weigh the declarations and conclude that the lack of factual corroboration warrants discounting the opinions expressed in the declarations.”). In this case, we find that the published references on metabolites do not support the opinion. In re Am. Acad. of Sci. Tech Ctr., 367 F.3d at 1368 (“[T]he Board is entitled to weigh the declarations and conclude that the lack of factual corroboration warrants discounting the opinions expressed in the declarations.”) US-121, of which Dr. Pomper is lead inventor, also uses the term “low molecular weight”—without further characterization of the term—and is uninformative as to the meaning of the term. See Ex. 1006, ¶ 12. In addition, Patent Owner’s definition does not appear to apply to all compounds claimed in US-121.5” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “limited to Patent Owner’s proposed “from about 50 Daltons to about 1,500 Daltons.” The cited evidence relied on in the Pomper Declaration to define “low molecular weight” as a term well accepted in the chemical arts relates to metabolomics and metabolites. See Ex. 1002, 169, (specifically, ¶ 17 of Dr. Pomper’s declaration). Patent Owner admits that Dr. Pomper’s testimony is about molecules that differ from the claimed imaging and radiotherapeutic agents targeting FAP-α, but argues that the testimony is still relevant for purposes of explanation. Prelim Resp. 21. While it may be relevant, the testimony is not persuasive in light of the Specification. We find the uncontested fact that several of the B moieties alone—without the A moiety or L linker—specifically identified in the ’233 patent fall outside of Patent Owner’s proposed definition persuasive, as we normally do not interpret claim terms in a way that excludes examples disclosed in the specification. See, e.g., Verizon Servs. Corp. v. Vonage Holdings Corp., 503 F.3d 1295, 1305 (Fed. Cir. 2007) (rejecting proposed claim interpretation that would exclude disclosed examples in the specification). The cases cited by Patent Owner supporting that a claim term may be construed to exclude embodiments where the prosecution history supports such construction are factually distinguishable from the instant case as they regard instances of specific prosecution history disclaimer, clear prosecution disavowal, or relate to a specific definition of the terms in the Specification for the term being construed. Here, “low molecular weight” is not defined in the Specification, but, as Petitioner argues (see Pet. 21–25) is characterized as “demonstrat[ing] faster pharmacokinetics and a higher specific signal within clinically convenient times after administration” and that it “can be synthesized in radiolabeled form more easily.” Ex.1001, 13:33–50, 14:56– 16:14, 17:9–20. We are persuaded by the testimony of Dr. Zeglis, Petitioner’s declarant, that compounds weighing over 1500 Da may share those same behaviors, along with certain identified B moieties disclosed as embodiments. See Ex. 1003 ¶ 83.” slip op. at 10

    Claim construction§ 103 obviousness§ 112 disclosurecites KSR · Graham
    Patents in suitUS 12,115,233
  • PTAB · Dec 1, 2025 · PGR2025-00045 · APJ Debra L Dennett · PGR · Institution

    The Board denied institution because Petitioner did not show it was more likely than not that any challenged claim was unpatentable under the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We have authority to determine whether to institute a post-grant review under 35 U.S.C. § 324. Institution of a post-grant review is authorized by statute only when “the information presented in the petition . . . would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). The burden is on Petitioner to show that the challenged patent is eligible for postgrant review. Mylan Pharms. Inc. v. Yeda Research & Dev. Co., PGR2016- 00010, Paper 9 at 10 (PTAB Aug. 15, 2016) (holding that the ultimate burden of persuasion remains with a petitioner to demonstrate that the challenged patent is eligible for post-grant review). Upon consideration of the Petition, Preliminary Response, and the cited evidence, we determine that Petitioner has not shown that it is more likely than not that any of the challenged claims are unpatentable. We thus determine to not institute a post-grant review of the ’027 patent based on the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “a Bachelor of Science degree in Agricultural or Mechanical Engineering with 2–4 years of practical, applied experience in the field of agricultural machinery, including systems integration and fluid handling and sprayer control systems, or equivalent experience. Prelim. Resp. 12 (citing Ex. 2001, ¶ 59). Patent Owner states that the differences in the asserted levels of ordinary skill should not change the outcome of the Petition. Id. For the purposes of this decision, we adopt Petitioner’s definition, which appears consistent with the level of skill shown in the prior art references of record and the ’027 patent. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))). Our analysis, however, would not change were we to adopt Patent Owner’s definition.” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed board ownDecided for patent owner

      “Patent Owner contends that claim construction is necessary for the “seed-applied substance” term because Petitioner allegedly ignores the teaching of the specification in evaluating the term. Prelim. Resp. 12. Patent Owner points to the specification, which defines a “seed-applied substance” as “includ[ing] any composition applied to seeds prior to the seeds being planted (e.g., when the seed comes in contact with the soil in a field).” Id. at 13 (quoting Ex. 1001, 7:45-48). Patent Owner contends that the term means “a substance that is applied directly to the seed before the seed comes into contact with the soil in a field.” Id. (citing Ex. 2001, ¶ 55). According to Patent Owner, Petitioner erroneously uses a definition that “allows the ‘seedapplied substance’ to be applied to the seed (and soil) as the seed lay planted in the soil.’” Id. For the purpose of addressing Petitioner’s grounds, we use the definition of “seed-applied substance” provided in the ’027 patent, i.e., “any composition applied to seeds prior to the seeds being planted (e.g., when the seed comes in contact with the soil in a field).” Vitronics Corp. v. Conceptronic, Inc., 90 F.3d 1576, 1582 (Fed. Cir. 1996) (“[A] patentee may choose to be his own lexicographer and use terms in a manner other than their ordinary meaning, as long as the special definition of the term is clearly stated in the patent specification or file history.”).” slip op. at 7

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “3. Analysis Our analysis of whether Wagers discloses the limitation “individually applying the desired application amount of the selected type of the seed-applied substance to each seed as it is being delivered to the soil” is dispositive of Petitioner’s challenge to claim 1 as anticipated.” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Graham
    Patents in suitUS 12,102,027
  • PTAB · Aug 20, 2025 · IPR2025-00385 · APJ Debra L Dennett · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–10 were anticipated by Nishikawa or obvious over the asserted combinations.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “review under 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a). The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted “unless the Director determines . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least [one] of the claims challenged in the petition.” For the reasons set forth below, upon considering the Petition and Preliminary Response, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to at least one challenged claim. Accordingly, we deny the Petition and decline to institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “Petitioner contends that A person of ordinary skill in the relevant art would typically hold an advanced degree in chemistry, material science, and/or a related discipline, and have at least two years of experience with designing and/or fabricating battery separators or have an equivalent level of education, training, and experience. Pet. 5. Patent Owner “adopts the definition proposed by Petitioner” for the purposes of the Preliminary Response. Prelim. Resp. 22. In light of the record before us, and for purposes of this Decision, we adopt Petitioner’s unopposed definition because it is consistent with the specification. We note that neither party indicated that the result would change under any different definition.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Absolute plastic deformation rate” and “relative plastic deformation rate” are the only claim terms disputed in this proceeding, and are clearly defined in the Specification and in claim 1. See Spec. 4:22–27, 4:47–54; 25:31–37. Because we determine that claim construction is not necessary to decide whether to institute, we do not expressly construe any claim terms. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (holding that “only those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy”); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs. in the context of an inter partes review). slip op. at 11

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Petitioner’s arguments are unconvincing. Petitioner points to nothing in Nishikawa that allows a POSITA to determine L2 (defined as “a length of 4 Tensile strength is measured as force per units area, such as MPa or psi. One MPa equals one N/mm2. Nishikawa Table 1 discloses tensile strength in N/cm. Ex. 1004 Table 1. Petitioner makes calculations to convert the reported N/cm into N/m2 and then to GPa, but provides no explanation for why tensile strength is reported in N/cm or how it was measured. See Pet. 31. the porous substrate after the porous substrate is stretched to breakage and docked along the fracture caused by the breakage and flattened”) or L2 – L0. See generally Pet., Ex. 1004. Petitioner and its expert, Dr. Pecht, fail to adequately explain why tensile strength divided by Young’s modulus is “a proxy for L1 – L2” or why such a proxy is sufficient to disclose the limitation as stated. Instead, we are required to rely on “approximations” and “estimates” with insufficient explanation of why such they are appropriate or adequate. See Pet. 26, 30, 32; see also Ex. 1003 ¶¶ 97, 105–108, 111.” slip op. at 13

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,964,927
  • PTAB · May 21, 2025 · IPR2025-00193 · APJ Sheridan K Snedden · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, or 30 were unpatentable on any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the evidence and arguments presented in the Petition, we determine that Petitioner has not demonstrated a reasonable likelihood of success in proving that at least 1 claim of the ’030 patent is unpatentable.” slip op. at 2

    • BurdenNot shown unpatentable

      “What is missing from Petitioner’s stated motivation for modifying the array of Cantor is a reason why a POSA would seek to correlate the identification sequence with a location on the array at all. Prelim. Resp. 72. Indeed, the location of a bead on the substrate is not pertinent to the analysis disclosed in Cantor. Ex. 2002 ¶ 172; see also id. at ¶ 31 (Cantor “does not relate to the [spatial] analysis of tissue samples . . . .”). “[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, and 30 would have been obvious over Cantor.” slip op. at 20

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner does not argue that any claim term requires construction. Pet. 22–23. Likewise, Patent Owner takes the position that “no claim terms 2 Person of ordinary skill in the art. require explicit construction” for purposes of determining whether to institute inter partes review. Prelim. Resp. 19. Having considered the parties’ positions and evidence of record, we determine that no express construction of any claim term is necessary to determine whether to institute inter partes review. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable

      “What is missing from Petitioner’s stated motivation for modifying the array of Cantor is a reason why a POSA would seek to correlate the identification sequence with a location on the array at all. Prelim. Resp. 72. Indeed, the location of a bead on the substrate is not pertinent to the analysis disclosed in Cantor. Ex. 2002 ¶ 172; see also id. at ¶ 31 (Cantor “does not relate to the [spatial] analysis of tissue samples . . . .”). “[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, and 30 would have been obvious over Cantor.” slip op. at 20

    Claim construction§ 102 anticipation§ 103 obviousness
    Patents in suitUS 11,761,030
Page 1 of 4
← Previous1234Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.