- PTAB · Oct 6, 2026 · IPR2025-00530 · APJ Scott C Moore · IPR · Final written decision
Original claims 1–9 were canceled; the non-contingent motion to add substitute claims 10–18 was denied for lack of written-description support, and claim 18 was also indefinite.
RulingsFinal written decision- 112 supportMotion to amend, deniedDenied
“that either the ’303 application or the ’838 provisional contain adequate written description support for the disputed feature of limitation [10.d]. Though the disclosures cited by Patent Owner indicate that a secondary identifier can be used to aid in verification of a UAV, these disclosures also make clear that both first and second identifiers are transmitted by and received from the UAV. See, e.g., Ex. 2002, 4:15–17, 30:24–31:6; Ex. 2003 ¶¶ 14, 66. Patent Owner’s reliance on disclosure characterized as transmitting an identifier from a remote computing system “through the UAV” (Reply 2) is not persuasive. The cited disclosures from the ’303 application and ’838 provisional generally disclose that the identifiers transmitted by a UAV can be “generated remotely,” such as by a “remote computing system.” Ex. 2002, 14:23–15:2; Ex. 2003 ¶ 45. But Patent Owner has not identified disclosure indicating that a remote computing system may transmit an identifier to the identification receiver. In the ’303 application and ’838 provisional, only the UAV (which is part of the discrimination system, and thus not “remote”) actually transmits identifiers to the identification receiver. Patent Owner is correct in its assertion that an “aerial system identifier can be generated on-board the aerial system” or “generated remotely . . . at a remote computing system.” Mot. 7 (citing Ex. 2002, 14:23–15:2; Ex. 2003 ¶ 45). But even if a UAV’s identifier was at some time in the past generated by a remote computing system, the subsequent transmission of that identifier from the UAV to the identification receiver would not satisfy the plain language of limitation [10.d]. The claim language “receive … a second identifier from a computing system that is remote to the discrimination system” requires the receipt of a transmission of the second identifier from a remote computing system. This claim language limits the source of the received transmission (i.e., where the particular transmission is “receive[d] … from”). Thus, the relevant issue is from where was the recited second identifier received. The relevant is not where the second identifier was originally generated.” slip op. at 12
- Disclosure Requirements (§112) › Definiteness (Nautilus)DefiniteIndefiniteMixed
“We determine that the disputed language in limitation [10.d] is not indefinite. There is no recitation in proposed substitute claim 10 that the second identifier is transmitted solely from the identifier transmission system. Thus, the alleged irreconcilable contradiction cited by Petitioner is not recited in the claims. Petitioner’s position appears to rest on the fact that the ’303 application and ’838 provisional do not disclose receiving the second identifier from a remote computing system. See Sur-reply 6 (“To manufacture written description support, [Patent Owner] argues the claim encompasses identifiers routed ‘through the UAV.’”). Though we agree that limitation [10.d] lacks adequate written description support, this defect does not render the claim indefinite because the scope of limitation [10.d] is otherwise reasonably certain based on its plain language. See supra § III.C.4.” slip op. at 18
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference not prior artPriority date, deniedDecided for patent owner
“In contrast, the ’393 provisional never discloses that the described drone defense system may use the identity of a detected drone to develop a particular countermeasure. The disclosed RTSS certainly uses identity information to determine whether a drone is a threat. And if a threat is identified, the RTSS immediately starts “a series of processes … to determine what rule of engagement will be applied on the intruding drone.” Ex. 1006 ¶ 10. The ’393 provisional discloses that the system may select a particular countermeasure based on (i) the particular zone within a protected area within which a drone is located, (ii) “the behavior of the hostile drone,” or (iii) “other instructions.” Id. ¶¶ 9, 10. But the ’393 provisional never discloses that these “other instructions” may include the identity of the drone. The system disclosed in the ’393 provisional uses the identity of a drone to determine whether to activate the countermeasure system. See id. ¶¶ 16–18. But there is no disclosure in the ’393 provisional that the countermeasure system, once activated, uses the identity of the drone to develop the particular countermeasure to be employed. See generally Ex. 1006. Thus, though the Whitmarsh reference itself contains ample written description support for limitation [19e], the earlier-filed ’393 provisional does not. On this record, and having reviewed the ’393 provisional in its entirety, we determine that the ’393 provisional does not “reasonably convey[] to those skilled in the art that the inventor had possession of” the subject matter of limitation [19e] of Whitmarsh’s claim 19 “as of the filing date” of the ’393 provisional. See Ariad, 598 F.3d at 1351.” slip op. at 27
§ 102 anticipation§ 112 disclosurecites NautilusPatents in suitUS 10,249,199 - PTAB · Oct 6, 2026 · IPR2025-00525 · APJ Scott C Moore · IPR · Final written decision
Original claim 21 was canceled; the Board denied substitute claim 22 for new matter and held it obvious under §103 based on six combinations.
RulingsFinal written decision- 112 supportMotion to amend, deniedDenied
“First, Patent Owner has not shown possession of the disputed feature of a “radio communication module [that] is configured to utilize a secure identifier, the secure identifier comprising a specified excitation.” In the ’406 application, the term “excitation” is used exclusively to refer to a light beam signal. See Ex. 2015, 7:8–13, 9:8–10, 23:9.2 The ’406 application discloses that an identification box on an aircraft may include both an RF module and a separate light sensor. See Ex. 2015, 7:3–11. But nowhere does the ’406 application describe receiving a light beam (e.g., an excitation) with the RF module of the identification box (as opposed to the light sensor), so as to provide support for proposed substitute claim 22’s recitation of a “radio communication module” configured to utilize “a secure identifier . . . comprising a specified excitation.” We disagree with Patent Owner that it suffices that one of ordinary skill in the art “would recognize that these disclosures are equally applicable to the RF-only embodiments” (Reply 5). “It is not sufficient for purposes of the written description requirement . . . that the disclosure, when combined with the knowledge in the art, would lead one to speculate as to modifications that the inventor might have envisioned, but failed to disclose.” Lockwood v. Am. Airlines, Inc., 107 F.3d 1565, 1572 (Fed. Cir. 1997). On this record, and having reviewed the ’959 Patent, the ’153 provisional, and the ’406 application, we find no evidence in those documents that the named inventor was in possession of the concept of a radio communications module “configured to utilize a secure identifier” where “the secure identifier compris[es] a specified excitation.” Second, setting aside the “radio communication module” in proposed substitute claim 22, Patent Owner also has not shown that the named inventor was in possession of the feature of a “secure identifier comprising a specified excitation.” Patent Owner’s argument that the ’406 application describes a light beam directed to a particular aircraft (see Reply 4–5) is 2 The same is true of the ’153 provisional. See Ex. 2016 ¶¶ 29, 34. unavailing. The fact that the properties of a particular light beam indicate that the light beam is intended for a particular aircraft does not demonstrate that the light beam is a “secure identifier,” as we have construed that term. Patent Owner has not identified any disclosure in the ’406 application of a “secure identifier” comprising a light beam, let alone that such light beam can be utilized by a “radio communication module.” The only references to “secure” identifiers in the ’406 application describe radio frequency signals. See Ex. 2015, 2:4–6, 15:21–17:12.3 Having reviewed the ’959 Patent, the ’153 provisional, and the ’406 application, we find no evidence in those documents that the named inventor was in possession of the concept of a “secure identifier comprising a specified excitation.”” slip op. at 15
- ScopeDecided for patent owner
“not impermissibly broaden the scope of the claims of the ’959 Patent. As Patent Owner suggests, there were no limitations in original claim 21 on the type of radio signal the radio communication module could receive, and so it follows that proposed substitute claim 22 does not now encompass receiving a broader set of radio signals. We see no basis for Petitioner’s argument that the past tense verb “received” limited original claim 21 to “signals of a compatible ‘type’ and ‘range.’” Opp. 7. Moreover, the claim language (with the proposed deletion shown double brackets) provides that “the radio communication module is configured to receive a [[received]] radio signal.” Any radio signal that the radio communications module receives would necessarily be a “received” radio signal. Thus, deleting the redundant word “received” does not enlarge the scope of this claim limitation. We also are not persuaded by Petitioner’s suggestion that removing the term “received” broadens original claim 21 by deleting a requirement that the radio signal have already been previously received by the claimed device. See Sur-reply 9. Original claim 21 simply recited, using redundant language, that “the radio communication module is configured to receive a received radio signal.” Ex. 1001, 18:5–7. The most natural reading of this language is that the phrase “received radio signal” is just a description of a radio signal that is received by the recited radio communications module. Petitioner has cited no persuasive evidence that one of ordinary skill in the art would have counterintuitively interpreted this language to impose an additional requirement that the “received radio signal” must have been received twice—a first time by some other component of the device, and a second time by the recited radio communication module. Accordingly, we determine that the proposed amendment does not improperly broaden claim scope.” slip op. at 10
- Disclosure Requirements (§112) › Definiteness (Nautilus)IndefiniteNot shown unpatentable
“572 U.S. 898 (2014). See Memorandum: Approach to Indefiniteness Under 35 U.S.C. § 112 in AIA Post-Grant Proceedings (Jan. 6, 2021).4 Under Nautilus, a claim is indefinite if fails to “inform those skilled in the art about the scope of the invention with reasonable certainty.” 572 U.S. at 910. We agree with Patent Owner that neither of the identified terms are indefinite. Regarding the term “low-altitude aircraft,” we determine the Specification provides a sufficient basis for understanding the scope and meaning of this term with reasonable certainty. The U.S. Court of Appeals for Federal Circuit has explained that, when a term of degree is recited in a claim, it is necessary “to determine whether the patent’s specification provides some standard for measuring that degree.” See Seattle Box Co. v. Indus. Crating & Packing, Inc., 731 F.2d 818, 826 (Fed. Cir. 1984); see also Datamize, LLC v. Plumtree Software, Inc., 417 F.3d 1342, 1350 (Fed. Cir. 2005) (“Some objective standard must be provided in order to allow the public to determine the scope of the claimed invention.”). Here, the Specification describes the related art as including “small UASs (e.g., aircrafts up to 25 pounds flying up to 500 ft of the low altitude airspace).” Ex. 1001, 1:50–52. One of ordinary skill in the art would understand from the Specification that the cited disclosure provides an objective standard for determining the scope of a low-altitude aircraft as one that is designed to fly up to a maximum altitude of about 500 feet.” slip op. at 20
- Skill levelSkill level petitioner adoptedDecided for petitioner
“In our Institution Decision, we adopted Petitioner’s proposal that one of ordinary skill in the art would have had the following qualifications: [E]ither (1) a Bachelor of Science in Mechanical Engineering, Electrical Engineering, Aerospace engineering, or an equivalent field, as well as at least 2 years of academic or industry experience in the aerospace, avionics, telecommunications, or electronic device manufacturing industry, or (2) at least four years of industry experience in any of the above industries. Paper 13, 5 (citing Pet. 21). Patent Owner has not disputed this formulation; thus, we adopt it for purposes of this Decision. See Paper 13, 10–11 n. 8.” slip op. at 23
§ 103 obviousness§ 112 disclosurecites Graham · NautilusPatents in suitUS 10,713,959 - PTAB · Nov 20, 2025 · IPR2025-00951 · APJ Eric C Jeschke · IPR · Institution
The Board instituted IPR on claims 1–19 and all asserted grounds, finding a reasonable likelihood that claim 1 would have been obvious over DuroMax and De Vries.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. See 35 U.S.C. § 314; 37 C.F.R. § 42.4(a) (2024) (“The Board institutes the trial on behalf of the Director.”). Inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314. Upon consideration of the evidence and arguments in the record, for the reasons below, we determine that the information presented shows a reasonable likelihood that Petitioner would prevail with respect to at least one of the challenged claims. We thus institute inter partes review on all challenged claims on all asserted grounds. See SAS Inst. Inc. v. Iancu, 584 U.S. 357, 362–63, 369–70 (2018); 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”).” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“For purposes of this Decision, we adopt the definition of the level of ordinary skill in the art proposed by Petitioner. As to the inclusion of physics in Petitioner’s definition, Patent Owner acknowledges that an undergraduate mechanical engineering degree holder would have the requisite knowledge here but does not adequately explain why an undergraduate physics degree holder would not. In addition, Patent Owner requires “a four-year degree in mechanical engineering or a closely related field,” but fails to identify what fields are “closely related.” See Prelim. Resp. 10 (emphasis added). Based on the Winkel Declaration, we are persuaded at this stage that a hypothetical undergraduate physics degree holder would have had adequate knowledge for one of ordinary skill in the art of the invention here. See Winkel Decl. ¶ 106. As to the requisite years of experience proposed in the definitions— three for Petitioner versus “at least one” for Patent Owner—we note that Patent Owner’s definition is broader than, but includes, Petitioner’s definition. Moreover, for both the inclusion of physics and the years of experience issues, Patent Owner acknowledges that the arguments in the Preliminary Response “are not impacted based on which definition is applied.” Prelim. Resp. 10. Further, Patent Owner does not argue at this stage that Petitioner’s proposal for the level of ordinary skill leads to an improper understanding of how a skilled artisan would have understood either the challenged patent or the prior art.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“At this stage of the proceeding and on the current record, we need not and do not explicitly construe the phrase “selector switch.” See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Although we do not expressly adopt Petitioner’s proposed construction at this stage of the proceeding, we note that it at least generally aligns with the tentative claim construction issued by the United States District Court in the California Litigation: “Mechanical device whose positioning precludes simultaneous access to two fuels.” Ex. 300310 at 2; see also 37 C.F.R. § 42.100(b) (“Any prior claim construction determination concerning a term of the claim in a civil action, or a proceeding before the International Trade Commission, that is timely made of record in the inter partes review proceeding will be considered.”); Memorandum from Acting Director Coke Morgan Stewart to Members of the Patent Trial and Appeal Board (Sept. 15, 2025), available at https://www.uspto.gov/sites/default/files/documents/ Memo_re_prior_findings_of_fact_and_conclusions_of_law_9_16_25.pdf (“Prior Determinations Memo”) (discussing PTAB consideration of prior findings of fact and conclusions of law). We also note that Patent Owner” slip op. at 14
- Obviousness (§103) › Analogous artAnalogous artDecided for petitioner
“Like the Federal Circuit in In re Ellis, although the patent classification of the reference is “some evidence of ‘non-analogy, . . . we consider the similarities and differences in structure and function of the inventions . . . to carry far greater weight.” In re Ellis, 476 F.2d at 1372 (affirming the Board and rejecting the applicant’s nonanalogous art argument). Here, the challenged patent discusses in the Background of the Invention the need for a way to “prevent both valves from being ‘on’ at the” slip op. at 21
Claim construction§ 103 obviousnesscites Phillips · GrahamPatents in suitUS 10,598,101 - PTAB · Nov 13, 2025 · IPR2025-00805 · APJ Eric C Jeschke · IPR · Institution
The Board instituted IPR on claims 1–24 and all asserted grounds, finding a reasonable likelihood that Petitioner would prevail on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. See 35 U.S.C. § 314; 37 C.F.R. § 42.4(a) (2024) (“The Board institutes the trial on behalf of the Director.”). Inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314. Upon consideration of the evidence and arguments in the record, for the reasons below, we determine that the information presented shows a reasonable likelihood that Petitioner would prevail with respect to at least one of the challenged claims. We thus institute inter partes review on all challenged claims on all asserted grounds. See SAS Inst. Inc. v. Iancu, 584 U.S. 357, 362–63, 369–70 (2018); 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”).” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached
“C. Patent Owner’s Arguments Under 35 U.S.C. § 325(d) In the Preliminary Response, Patent Owner contends that Petitioner’s unpatentability arguments presented in this proceeding were previously considered by the USPTO. See Prelim. Resp. 31–33. In her decision referring this matter to the Board, then-Acting Director Stewart rejected that argument. See Paper 20 at 2–3 (discussing why “Petitioner provides persuasive reasoning, supported by evidence, that discretionary denial under 35 U.S.C. § 325(d) is not appropriate”); see also Prelim. Resp. 31–33 (referring to and citing Patent Owner’s Discretionary Denial Brief (Paper 8)). We need not and do not address this issue further.” slip op. at 15
- Skill levelSkill level petitioner adoptedDecided for petitioner
“For purposes of this Decision, we adopt the definition of the level of ordinary skill in the art proposed by Petitioner. As to the inclusion of physics in Petitioner’s definition, Dr. Singhose (a professor of mechanical engineering) testifies as to why undergraduate mechanical engineering degree holders would have the requisite knowledge here, but does not testify that undergraduate physics degree holders would not. See Singhose Decl. ¶¶ 2, 27, 28. In addition, Patent Owner and Dr. Singhose require “a four-year degree in mechanical engineering or a closely related field,” but fail to identify what fields are “closely related.” See Prelim. Resp. 11; Singhose Decl. ¶ 27. Based on the Morse Declaration, we are persuaded at this stage that a hypothetical undergraduate physics degree holder would have adequate knowledge for one of ordinary skill in the art of the invention here. See Morse Decl. ¶ 31. As to the requisite years of experience proposed in the definitions— three for Petitioner versus “at least one” for Patent Owner—we note that Patent Owner’s definition is broader than, but includes, Petitioner’s definition. Moreover, for both the inclusion of physics and the years of experience issues, Patent Owner acknowledges that the arguments in the Preliminary Response “are not impacted based on which definition is applied.” Prelim. Resp. 12 (citing Singhose Decl. ¶¶ 30–34). Further, Patent Owner does not argue at this stage that Petitioner’s proposal for the level of ordinary skill leads to an improper understanding of how a skilled artisan would understand either the challenged patent or the prior art.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“B. Claim Construction In inter partes reviews, the Board interprets claim language using the same claim construction standard that would be used in a civil action under 35 U.S.C. § 282(b), as described in Phillips v. AWH Corp., 415 F.3d 1303 (Fed. Cir. 2005) (en banc). See 37 C.F.R. § 42.100(b). Under that standard, we generally give claim terms their ordinary and customary meaning, as would be understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history. See Phillips, 415 F.3d at 1313–14. Although extrinsic evidence, when available, may also be useful when construing claim terms under this standard, extrinsic evidence should be considered in the context of the intrinsic evidence. See id. at 1317–19. Petitioner does not propose express constructions for any claim terms. Pet. 12. Patent Owner also does not propose any express constructions. See Prelim. Resp. 12. On the current record, we need not construe explicitly any claim terms. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). As discussed below, however, the parties dispute the meaning of “gaseous fuel.” We address this issue below in the analysis of the challenge to claims 1–3, 5–9, and 18 based on Nakafushi and Olmr.” slip op. at 12
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites PhillipsPatents in suitUS 10,393,034 - PTAB · Oct 16, 2025 · IPR2025-00710 · APJ Scott A Daniels · IPR · Institution
The Board instituted IPR on claims 1–9, 13, and 16–20 because Petitioner showed a reasonable likelihood of prevailing on both obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the arguments and evidence presented by Petitioner and Patent Owner, we are persuaded that Petitioner demonstrates a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. See 35 U.S.C. § 314(a). Accordingly, we institute an inter partes review of the challenged claims.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner states that “[w]hile Patent Owner disagrees with the proposed level of skill, under any level of skill a POSITA would not understand the asserted Grounds to raise any unpatentability issue.” Prelim. Resp. 5. Patent Owner does not, at this point, propose a different level of skill. Id. On this record, Petitioner’s proposed level of ordinary skill in the art is not contradicted and is consistent with our review and understanding of the technology and descriptions in the ’294 patent and the asserted prior art references. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this Decision, we rely on Petitioner’s proposed level of ordinary skill in the art.” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“B. Claim Construction At this early stage of the proceeding, no claim terms are disputed and neither party offers any particular construction for any claim term. Pet. 13; Prelim. Resp. 5. Having considered both parties arguments and evidence in light of the challenged claims, at this stage, we are not apprised of any reason to explicitly construe any claim term for purposes of institution. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Considering first the motivation to combine, we find Petitioner’s reasoning sufficiently persuasive for purposes of institution. Petitioner argues that Okita’s “pseudo values” are just like Schneier’s credits and “[b]ecause the pseudo-values can be exchanged for virtual money that can be used in other tournaments, arcades, or the like, ‘a game can be provided that generates tension for the player due to the fact that the virtual money is earned or is confiscated based on the game results.’” Pet. 51 (quoting Ex. 1009 ¶ 9). Petitioner’s declarant, Mr. Crevelt, further testifies that Okita’s “[r]ewards programs are a routine feature of games because players are encouraged to play more to accumulate points or other pseudo-values to exchange for prizes or other items . . . [t]he virtual money conversion functionality would have opened up more game play options and more items to purchase.” Ex. 1003 ¶ 187. Based on the record before us, Petitioner has shown sufficiently for purposes of institution that the use of Okita’s pseudo-values and broad player’s interest and engagement with the video game.” slip op. at 16
Claim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 10,825,294 - PTAB · Oct 16, 2025 · IPR2025-00709 · APJ Scott A Daniels · IPR · Institution
The Board instituted IPR on claims 1, 2, 4, 6, 8–10, 14–18, 21–23, 25, 27, and 29 based on reasonable likelihood of obviousness over Schneier and over Schneier with Okita.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the arguments and evidence presented by Petitioner and Patent Owner, we are persuaded that Petitioner demonstrates a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. See 35 U.S.C. § 314(a). Accordingly, we institute an inter partes review of the challenged claims.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner states that “[w]hile Patent Owner disagrees with the proposed level of skill, under any level of skill a POSITA would not understand the asserted Grounds to raise any unpatentability issue.” Prelim. Resp. 5. Patent Owner does not, at this point, propose a different level of skill. Id. On this record, Petitioner’s proposed level of ordinary skill in the art is not contradicted and is consistent with our review and understanding of the technology and descriptions in the ’635 patent and the asserted prior art references. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this Decision, we rely on Petitioner’s proposed level of ordinary skill in the art.” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“B. Claim Construction At this early stage of the proceeding, no claim terms are disputed and neither party offers any particular construction for any claim term. Pet. 12– 13; Prelim. Resp. 5. Having considered both parties arguments and evidence in light of the challenged claims, at this stage, we are not apprised of any reason to expressly construe any claim term for purposes of institution. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundOther
Claim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 10,650,635 - PTAB · Oct 16, 2025 · IPR2025-00711 · APJ Linda E Horner · IPR · Institution
The Board instituted IPR on claims 1, 2, 4–7, 9, 11–13, 15, 19, 23, 24, and 29 based on a reasonable likelihood of success on the § 103 challenges.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition and the preliminary response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the Petition and the Preliminary Response, and for the reasons explained below, we determine that Petitioner has shown a reasonable likelihood that it would prevail with respect to at least one of the challenged claims. Thus, we grant the Petition and institute an inter partes review of claims 1, 2, 4–7, 9, 11‒13, 15, 19, 23, 24, and 29 of the ’164 patent.” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Petitioner argues that it is not necessary for us to provide an express construction for any claim term because the Petition “establishes the prior art meets each claim limitation under any reasonable construction.” Pet. 13. Patent Owner similarly submits that we “need not construe any terms at this stage, because under any reasonable construction of the claim terms, the prior art fails to disclose or suggest the claimed features.” Prelim. Resp. 9. At this stage of the proceeding, we do not need to expressly construe any claim terms to determine whether Petitioner showed a reasonable likelihood of prevailing as to its challenge of at least one challenged claim.” slip op. at 14
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Kelly discloses that game processor 12 implements the functions of game unit 10 during a game process and includes several input and output functions (Ex. 1005, 9:15–18), including: The game processor controls the game apparatus by receiving inputs from a player, from other game apparatuses, from a server (described below), from a progressive bonus apparatus, and from other sources. The game processor also controls output signals to update the game process when appropriate. In addition, the game processor controls the redemption system of the present invention by calculating when prizes are awarded, calculating and updating prize lists and prize costs, and other functions, as described below. Ex. 1005, 9:18–27. As to the redemption system, Kelly discloses prize table 480 that is displayed to the operator. Ex. 1005, 34:64–65, Fig. 9a. In one embodiment, the operator can adjust prize characteristics for the game unit and any linked game units. Id. at 35:1–2. Kelly also discloses an alternative embodiment, however, in which selection of a specific prize from the table 480 can be based on random and/or statistical determination. Id. at 36:48–49. In this alternative embodiment, “random determination of whether a particular prize is to be awarded is also modified by statistical information to create a ‘best fit’ of prizes awarded according to the operator’s desired odds.” Id. at 36:63–66. awarded every 8,000 games, so if it is randomly determined that a third video console is to be awarded within, for example, the 3000th game, then a different prize, e.g., the next most valuable prize, can be awarded so that the desired odds are better met. Id. at 37:1–9. Thus, we find Petitioner has set forth sufficient evidence to show a reasonable likelihood that Kelly’s game processor can modify the variable parameters of the prizing structure to meet the mandated parameters of the desired odds, as called for in limitation [1.c.v].” slip op. at 23
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artOther
“To remove Walker as prior art under §§ 102(a) and 102(e), Patent Owner must show either it reduced the invention to practice prior to Walker’s effective date, or that it invented prior to Walker’s effective date. In the case of the latter, Patent Owner must demonstrate conception prior to May 1, 2003, and reasonably continuous diligence throughout the entire critical period, which begins just prior to the Walker’s effective date and ends on the date of the invention’s actual or constructive reduction to practice. Patent Owner provides evidence purporting to show that it conceived of the invention prior to May 1, 2003. Patent Owner has not asserted that this evidence demonstrates actual reduction to practice, nor do we have sufficient evidence at this stage to make that determination. Further, Patent Owner’s earliest possible constructive reduction to practice (September 1, 2004) does not pre-date Walker’s effective date. Thus, at this stage, Patent Owner would need to show it invented prior to Walker’s effective date through evidence of conception and reasonable diligence to remove Walker as prior art. At this stage of the proceeding, without Patent Owner’s evidence of diligence, Patent Owner has not provided sufficient evidence to show that Petitioner fails to show a reasonable likelihood of prevailing in establishing that Walker is prior art. This issue of whether Walker is prior art to the ’164 patent will benefit from further development of the record during the trial proceeding.” slip op. at 31
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · GrahamPatents in suitUS 11,335,164 - PTAB · Oct 16, 2025 · IPR2025-00712 · APJ James A Tartal · IPR · Institution
The Board instituted inter partes review of claims 1, 3–9, 13, 17, 18, 23, 25, 26, 28, and 29 on all asserted grounds, finding a reasonable likelihood of prevailing on claim 1 over Walker.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’279 patent on all grounds asserted in the Petition.” slip op. at 2
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“application filed November 12, 2021, that asserts the benefit of a series of applications, the earliest of which was filed September 2, 2003. Ex. 1001, codes (22), (45), (60). Petitioner asserts that the Challenged Claims of the ’279 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’279 patent.9 See Pet. 6. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims.” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted
“independent claim 1. Pet. 32–63. Petitioner relies on the testimony of Mr. Crevelt in support of its contentions with respect to claim 1. Ex. 1003 ¶¶ 234–286. Further, according to Petitioner, “[n]o findings regarding motivation to combine or reasonable expectation of success are necessary with a single reference ground,” but Walker “teaches that the features of the embodiments are options that can be combined.” Pet. 42 n.6 (citing Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1372–73 (Fed. Cir. 2019). At this stage, Patent Owner does not contest Petitioner’s proffered assertions about the” slip op. at 20
§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,393,279 - PTAB · Oct 16, 2025 · IPR2025-00708 · APJ James A Tartal · IPR · Institution
The Board instituted IPR on all challenged claims and grounds, finding a reasonable likelihood that claims 1, 3–5, 12, 13, 18–20, 22, 24–26, 29, 42, 44–47, and 50 are unpatentable over Walker and Schneier.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We have authority to determine whether to institute an inter partes review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’336 patent on all grounds asserted in the Petition.” slip op. at 2
- Skill levelSkill level board ownOther
“B. Level of Ordinary Skill in the Art At this stage of the proceeding, there is no evidentiary dispute about the level of ordinary skill in the art.8 Based on the testimony of Mr. Crevelt, we determine that a person of ordinary skill in the art would have had at least a bachelor’s degree in computer science or computer engineering, with at least three years of experience in game development. Pet. 14 (citing Ex. 1003 ¶¶ 62–65). Additional experience could substitute for less education, and additional education could likewise substitute for less experience. Id. We determine that the level of ordinary skill in the art 7 Petitioner states that it is not aware of secondary considerations that affect the obviousness arguments it presents. Pet. 66. Patent Owner has not offered objective evidence of nonobviousness at this stage of the proceeding. 8 Patent Owner “disagrees with the proposed level of skill” but asserts that “under any level of skill a [person of ordinary skill in the art] would not understand the asserted Grounds to raise any unpatentability issues.” Prelim. Resp. 8. Thus, Patent Owner does not present evidence or arguments in its Preliminary Response related to the level of ordinary skill in the art. competence reflected in the ’336 patent Specification and the asserted prior art references, based on our review of the limited record.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; see also Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Petitioner argues that it is not necessary for us to provide an express construction for any claim term because the Petition “establishes the prior art meets each claim limitation under any reasonable construction.” Pet. 14–15. Patent Owner similarly submits that we “need not construe any terms at this stage, because under any reasonable construction of the claim terms, the prior art fails to disclose or suggest the claimed features.” Prelim. Resp. 8. At this stage of the proceeding, we do not need to expressly construe any claim terms to determine whether Petitioner showed a reasonable likelihood of prevailing as to its challenge of at least one challenged claim.” slip op. at 12
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“an application filed September 20, 2010, that asserts the benefit of an application filed September 2, 2003. Ex. 1001, codes (22), (45), (54), (62). Petitioner asserts that the Challenged Claims of the ’336 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’336 patent.9 See Pet. 7. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims. Walker was filed on May 1, 2003, and refers back to a provisional application filed on May 6, 2002, but Walker was not published until January 1, 2004. Ex. 1006, codes (22), (43), (60). Thus, Petitioner fails to show on the current record how, under pre–AIA 35 U.S.C. § 102(a), Walker discloses an invention that was described in a printed publication in this country before the invention thereof by the Patent Owner, because Walker was published after the applied priority date of the Challenged Claims of the’336 patent.” slip op. at 17
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,529,336 - PTAB · Oct 8, 2025 · IPR2025-00629 · APJ Scott C Moore · IPR · Institution
The Board instituted IPR of claims 1–20 on all asserted grounds, finding a reasonable likelihood that claim 1 is obvious over Beard and Laufer.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We may institute an inter partes review when “the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). If we institute an inter partes review, the trial must encompass all claims and grounds identified in the Petition. 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”). For the reasons set forth below, we conclude that there is a reasonable likelihood that Petitioner will prevail in establishing the unpatentability of one or more claims of the ’711 Patent. We, therefore, institute inter partes review of claims 1–20 on the grounds identified in the Petition. B.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that one of ordinary skill in the art would have had the following qualifications: [E]ither (1) a Bachelor of Science in Mechanical Engineering, Electrical Engineering, Aerospace engineering, or an equivalent field, as well as at least 2 years of academic or industry experience in the aerospace or avionics fields, or (2) at least four years of experience in any of the above industries. 1 The Leahy-Smith America Invents Act (“AIA”) included revisions to 35 U.S.C. §§ 102 and 103 that became effective on March 16, 2013. Because the applications from which the ’711 Patent claims priority were all filed after this date, the post-AIA version of §103 applies. See Ex. 1001, codes (60), (63). 2 U.S. Patent No. 9,769,387 B1, iss. Sept. 19, 2017 (Ex. 1009). 3 U.S. Patent App. Pub. No. 2017/0059692 A1, pub. Mar. 2, 2017 (Ex. 1010). 4 U.S. Patent App. Pub. No. 2012/0106800 A1, pub. May 3, 2012 (Ex. 1021). 5 U.S. Patent App. Pub. No. 2017/0161911 A1, pub. June 8, 2017 (Ex. 1007). 6 U.S. Patent App. Pub. No. 2013/0301905 A1, pub. Nov. 14, 2013 (Ex. 1024). 7 U.S. Patent App. Pub. No. 2012/0004844 A1, pub. Jan. 5, 2012 (Ex. 1025). 8 PCT App. Pub. No. WO 2017/123477 A1, pub. July 20, 2017 (Ex. 1022). 9 U.S. Patent App. Pub. No. 2017/0160751 A1, pub. June 8, 2017 (Ex. 1005). Pet. 8 (citing Ex. 1003 ¶¶ 50–54). Patent Owner does not presently dispute Petitioner’s proposed formulation. See generally Prelim. Resp. For purposes of this Decision, we adopt and apply Petitioner’s formulation regarding the level of ordinary skill in the art because it is (1) consistent with the ’711 Patent and the asserted prior art; and (2) it is supported by the testimony of Dr. Singhose. B.” slip op. at 6
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner
“But the Detecting Limitations of claims 1, 19, and 20, merely require that a target be “detected.” The Detecting Limitations do not require that target detection be performed “aboard the reference UAV,” and claim 19 does not recite or require “machine learning.” Moreover, the Specification makes clear that the claims should not be limited to aspects of the disclosed embodiments, as Patent Owner proposes to do here. See, e.g., Ex. 1001, 2:56–59 (“The invention is described in connection with such embodiments, but the invention is not limited to any embodiment. The scope of the invention is limited only by the claims . . . .”) Patent Owner additionally fails to cite any lexicographic definition or clear and unambiguous disclaimer of claim scope sufficient to limit the claims in the manner it proposes. We, thus, are not persuaded that the Detecting Limitations require “applying aboard the reference UAV a machine learning model to the capture image for: (i) identifying a target in the captured image.”” slip op. at 8
- Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateDecided for petitioner
“Priority Date of the Challenged Claims Petitioner contends that claims 1–20 of the ’711 Patent “should not have priority to the October 9, 2016 filing date of U.S. provisional [patent] application 62/405,972 due to a lack of written description support.” Pet. 3. Petitioner thus “assumes” a priority date of October 1, 2017 (the filing date of U.S. Provisional Patent Application No. 62/556,449) for purposes of this proceeding. Id. at n.2; see also Ex. 1003, code (60). Patent Owner does not presently dispute Petitioner’s contention that the ’711 Patent is not entitled to a priority date earlier than October 1, 2017. See generally Prelim. Resp. For purposes of this decision, we accept Petitioner’s undisputed contention that the ’711 Patent is not entitled to a priority date prior to 10 Any determination, no matter how designated in this Institution Decision (except our ultimate decision to institute), is preliminary and non-binding. Our Final Written Decision, based on a fully developed record of arguments and evidence, will state our binding determinations, findings, and conclusions. If a party disagrees with this preliminary construction, or any other determination set forth in this Institution Decision, that party should present its arguments at trial. The parties are reminded that any arguments not made during trial will be considered waived. Patent Owner is further reminded that arguments in the Preliminary Response are not preserved and will be considered waived at trial unless those arguments are re-raised in the Patent Owner Response. The parties are additionally reminded that arguments raised in subsequent briefing must be set forth in full in the briefs themselves, and may not be incorporated by reference from prior filings such as the Preliminary Response. See 37 C.F.R. § 42.6(a)(3). October 1, 2017.11 Accordingly, Petitioner has made a sufficient showing that all of the cited references qualify as prior art. See Pet. 4–6. D.” slip op. at 11
Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · KSR · GrahamPatents in suitUS 10,514,711
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.