152 decisions · 418msnewest first
  • PTAB · Jan 23, 2026 · IPR2024-01342 · APJ Terrence W Mcmillin · IPR · Final written decision

    Claims 1–4 and 6–10 are unpatentable as obvious over each asserted ground; claim 5 was not shown unpatentable because the petitions failed to establish its additional feed and time-period limitations.

    RulingsFinal written decision
    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “1b, 1c, and 1e of claim 1 and in claims 4 and 5 of the ’753 patent. Patent Owner contends that the plain and ordinary meaning of “feed” is “one or more associated media elements.” See, e.g., PO Resp. 4. However, as discussed below, this alleged plain and ordinary meaning of feed is not supported by the claim language, the specification of the ’753 patent, or dictionary definitions of feed as contended by Patent Owner. We reject this contention and the related contentions that the cited art may be distinguished from the claims of the ’753 patent based on the recited term “feed.” Patent Owner relies on the language of claim 1 to support its” slip op. at 13

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “The parties’ definitions are similar, although we observe that Patent Owner proposes that the person of ordinary skill would have a bachelor’s degree or an equivalent or professional experience, whereas Petitioner proposes that such a person would have both a degree and experience. Neither party presents any arguments relating or referring to the level of ordinary skill in the art. Determining the level of ordinary skill in the art involves various factors, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citation omitted). The prior art of record also reflects the level of ordinary skill in the art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). We adopt Petitioner’s assessment of the level of skill in the art. Petitioner’s assessment is supported by the testimony of Dr. Almeroth and is consistent with the ’753 patent and the asserted prior art. However, our obviousness analysis would be the same under either party’s assessment. See Ex. 2014 ¶ 17 (Patent Owner’s declarant, Dr. Goodrich, stating that “I note that my definition of a POSITA is similar to that of Dr. Almeroth” and “My opinions in this declaration would not change were I to adopt the definition of a POSITA offered by Dr. Almeroth.”).” slip op. at 11

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “16 With regard to claim 5, the Petition cites paragraphs 97 and 98 of the Almeroth Declaration (Ex. 1002). See Pet. 28–29. We have considered the cited paragraphs in the Almeroth Declatation and found that they consist of nothing more than the inadequate and conclusory contentions in the Petition preceded by, in paragraph 97, “[i]n my opinion” and “it is my opinion” and, in paragraph 98, “[i]t is also my opinion.” Ex. 1003 ¶¶ 97, 98. As related to claim 5, we accord the Almeroth Declaration little or no weight. See 37 C.F.R. § 42.65 (a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”). that might become out-of-date before a user accesses access [sic] them. Ex. 1003, 11:49–58 (emphasis added). The cited passage in Whitehead mentioning “near real-time” does not support finding that Whitehead teaches or suggests the elements recited in claim 5.” slip op. at 39

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “Petitioner contends, “[a] POSITA would have modified Whitehead’s mixing server 130 to incorporate Marcus ’904’s algorithm (running on Marcus ’904’s receiver) for receiving, selecting, ordering, and assembling different media streams (both for content and advertising).” Pet. 33. Petitioner supports this contention by articulating the following reasons for the asserted modification of Whitehead’s mixing server 130 to incorporate Marcus ’904’s algorithm: “makes it more likely the system will identify content best suited for a particular user,” “allows for more targeted advertising and/or an opportunity to maximize revenue,” “improves Whitehead’s ability to target content and advertising to a particular user,” “would unlock new revenue sources for Whitehead,” “Marcus ’904’s content selection and concatenation algorithm improves Whitehead’s efficiency,” “[b]oth Whitehead and Marcus ’904 generate custom media programming based on a user profile,” “incorporating Marcus ’904’s teachings would not require redesigning Whitehead’s architecture and instead merely supplements Whitehead’s disclosure,” and “Petitioner’s proposed modification can be implemented entirely in software and does not require any hardware modifications. Indeed, Whitehead acknowledges that such modifications are possible. EX1003 at 19:64-20:6, 22:26-40.” Id. at 33–35 (citing Ex. 1002 (Almeroth Decl.) ¶¶ 110–115) (emphasis omitted). Based on this undisputed showing, we find that one of ordinary skill would have had a motivation to combine the teachings of Whitehead and Marcus ’904 as asserted in the Petition with a reasonable expectation of success.” slip op. at 48

    Patent outcomesUS 8,886,753 mixed
    Claim construction§ 103 obviousnesscites Graham
    Patents in suitUS 8,886,753
  • PTAB · Dec 12, 2025 · IPR2025-01116 · APJ Christopher M Kaiser · IPR · Institution

    The Board instituted IPR of claims 1–15 on all asserted grounds, finding a reasonable likelihood that claim 1 would have been obvious over Sudre, Lee, and Penven.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “determine whether to institute an inter partes review under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a). Inter partes review may not be instituted unless “the information presented in the petition filed under [35 U.S.C.] section 311 and any response filed under [35 U.S.C.] section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). “When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a) (2023). In other words, a decision to institute under § 314 may not institute on fewer than all claims challenged in the petition. SAS Inst., Inc. v. Iancu, 138 S. Ct. 1348, 1359–60 (2018). In addition, if the Board institutes trial, it will “institute . . . on all grounds in the petition.” PTAB Consolidated Trial Practice Guide, 5–6 (Nov. 2019)1 (“CTPG”); see also PGS Geophysical AS v. Iancu, 891 F.3d 1354, 1360 (Fed. Cir. 2018) (interpreting the statute to require “a simple yes-” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “had at least (1) a Bachelor’s Degree (or higher) in material science, materials engineering, mechanical engineering, textile engineering, or a related field, and (2) a minimum of two years of working experience in textiles engineering, fibers and textiles manufacturing, or a related field.” Pet. 4 (citing Ex. 1003 ¶¶ 21–22). Petitioner also argues that “[a]dditional education could substitute for professional experience, and vice versa.” Id. On the present record, Patent Owner does not contest Petitioner’s proposed level of ordinary skill. Prelim. Resp. 25–26. For purposes of this Decision, we adopt Petitioner’s assessment of the level of ordinary skill in the art, as it appears consistent with the ’566 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Both parties argue that no claim terms require express construction at this stage of the proceeding. Pet. 3; Prelim. Resp. 26. On the present record, we agree. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). To the extent the parties’ arguments regarding unpatentability do address claim construction issues, we address these issues below.” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “articulated a reason why a person of ordinary skill in the art would have combined the teachings of Sudre, Lee, and Penven. Prelim. Resp. 60–63. In particular, Patent Owner argues that a person of ordinary skill in the art “would not have been motivated to look into Penven to modify the teachings of Lee because Lee and Penven disclose substantially different structures.” Id. at 60–61. This argument does not address Petitioner’s proposed reason to combine, which looks to Lee and Penven each to modify Sudre, not to Penven to modify Lee. See Pet. 79–81. In addition, “[c]ombining the teachings of references does not involve an ability to combine their specific structures.” In re Nievelt, 482 F.2d 965, 968 (CCPA 1973). In other words, “[t]he test for obviousness is not whether the features of a secondary reference may be bodily incorporated into the structure of the primary reference . . . . Rather, the test is what the combined teachings of the references would have suggested to those of ordinary skill in the art.” In re Keller, 642 F.2d 413, 425–26 (CCPA 1981). Petitioner provides “some articulated reasoning with some rational underpinning” to combine the teachings of Sudre with those of Lee and Penven. KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 418 (2007). In particular, Petitioner directs us to Sudre’s teaching of “a method for manufacturing PMC,” to Sudre’s lack of teaching of “specific parameters, such as warp thread size and spacing” to satisfy the “particular requirements” of its fabric. Pet. 79 (citing Ex. 1003 ¶¶ 248–250; Ex. 1004, 1:2–5, 6:14–17). As Petitioner points out, id. at 79–80, Lee and Penven provided yarn diameters and loop diameters that were conventional, and there is evidence of record that a person of ordinary skill in the art would have used these conventional diameters in constructing Sudre’s paper machine clothing. Ex. 1003 ¶¶ 258–261, 263–266; Ex. 1006, 3:64–66.” slip op. at 14

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,261,566
  • PTAB · Nov 10, 2025 · IPR2025-00878 · APJ Carl M Defranco · IPR · Institution

    The Board instituted review of claims 1–3 and 11 after finding a reasonable likelihood that claim 1 is anticipated by Cleveland or obvious over Nakagawa.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “contentions, the cited portions of Cleveland, and the testimony of Clearwater’s expert), we find, preliminarily, that Cleveland discloses each claim element in the manner recited by claim 1. Thus, on the current record, Clearwater demonstrates a reasonable likelihood that challenged claim 1 is unpatentable as anticipated by Cleveland.” slip op. at 6

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “5 Clearwater argues that Cleveland qualifies as prior art under 35 U.S.C. § 102(e)(1) “based on both its provisional and non-provisional filing dates.” Pet. 17. In support, Clearwater asserts that Cleveland’s provisional (Ex. 1006) is “virtually identical” to Cleveland itself (id. at 18) and submits claim charts to demonstrate that the Cleveland provisional provides written support for: (1) at least claim 1 of Cleveland (id. at 18–21); and (2) the subject matter relied upon in Cleveland (id. at 21–40 (citing Ex. 1006 throughout)). Based on our review of the Cleveland provisional, as well as Clearwater’s claim charts, we are persuaded that the current record demonstrates that Cleveland is prior art to the challenged patent. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1381 (Fed. Cir. 2015).” slip op. at 4

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “satisfies each claim element as identified above in Section I.D, i.e., elements [1.pre]–[1.6]. See id. at 22–40. Clearwater also submits annotated Figure 3 of Cleveland, reproduced below, to further illustrate the specific laminate structure of Cleveland’s coffee cup. See id. at 39.” slip op. at 5

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted

      “protective layers have “a coat weight of from 5 to 30 lbs/3000 ft2,” Clearwater submits the declaration of its expert, who explains that, because Nakagawa identifies the specific polymers and the thickness of the coat used for the plastic layers and one skilled in the art “would recognize that the disclosed polymers have a given density,” then “[w]ith these known parameters, the coat weight is easily calculated to be 23.04 lbs./ 3000 ft2 — falling squarely within the claimed range.” Pet. 53–54 (citing Ex. 1003 ¶¶ 132–133; Ex. 1008 ¶ 24; Ex. 1024, at 4). At this stage, we find that testimony credible and supported by the evidence presently of record. After reviewing the preliminary record (including Clearwater’s contentions, the cited portions of Nakagawa, and the testimony of Clearwater’s expert), we find, preliminarily, that Nakagawa discloses or otherwise suggests each claim element in the manner recited by claim 1. Thus, on the current record, Clearwater demonstrates a reasonable likelihood that challenged claim 1 is unpatentable as obvious over Nakagawa. We need not decide Clearwater’s challenge of the dependent claims based on Nakagawa alone nor its challenge of claims 1–3 based on Nakagawa and Tanner. Our analysis of these challenges, in our view, is best left for trial after full development of the record.” slip op. at 8

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 8,637,126
  • PTAB · Oct 16, 2025 · PGR2025-00041 · APJ Justin T Arbes · PGR · Institution

    The Board instituted PGR of claims 1–20 on all asserted grounds after finding claim 1 more likely than not obvious over Hendry.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “a post-grant review unless the information in the petition, if unrebutted, “would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” See 37 C.F.R. § 42.4(a) (“The Board institutes the trial on behalf of the Director.”). For the reasons that follow, we institute a post-grant review as to claims 1–20 of the ’243 patent on all grounds of unpatentability asserted in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “a person of ordinary skill in the art would have had “at least a bachelor’s degree in computer science, electrical engineering, or a related field, and two years’ experience in data management or client-server systems and communications,” where “a higher education or skill level might make up for less experience, and vice-versa.” Pet. 6 (citing Ex. 1003 ¶¶ 35–39). Patent Owner did not file a Preliminary Response disputing Petitioner’s position. Based on the record presented, including our review of the ’243 patent and the types of problems and solutions described in the ’243 patent and cited prior art, we agree with Petitioner’s proposed definition of the level of ordinary skill in the art and apply it for purposes of this Decision, except that we remove the term “at least” to eliminate vagueness as to the amount of education and practical experience.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “any reasonable construction.” Pet. 7. Patent Owner did not file a Preliminary Response disputing Petitioner’s position. We conclude that no express interpretation of any claim term is necessary to determine whether to institute a post-grant review in this proceeding.4 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)). 4 The parties, however, are encouraged to address during trial (1) interpretation of the term “user profile” in the challenged claims, particularly in view of the Specification’s apparent definition of the term “profile” (see Ex. 1001, col. 14, ll. 51–55) and description of exemplary data from which a “user profile” may be generated (id. at col. 18, ll. 40–58), and (2) the scope of the various instances of the phrase “in response to” in the challenged claims. Also, if either party intends to argue a claim interpretation during trial, including what the plain and ordinary meaning of a term is, the party should do so in a clearly designated section of its briefing. See Patent Trial and Appeal Board Consolidated Trial Practice Guide (Nov. 2019), 44–49, available at https://www.uspto.gov/ TrialPracticeGuideConsolidated; O2 Micro Int’l Ltd. v. Beyond Innovation Tech. Co., 521 F.3d 1351, 1361 (Fed. Cir. 2008) (“A determination that a claim term ‘needs no construction’ or has the ‘plain and ordinary meaning’ may be inadequate when a term has more than one ‘ordinary’ meaning or when reliance on a term’s ‘ordinary’ meaning does not resolve the parties’ dispute.”).” slip op. at 11

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “each of its elements was, independently, known in the prior art.” KSR, 550 U.S. at 418. An obviousness determination based on a combination of references requires finding “both ‘that a skilled artisan would have been motivated to combine the teachings of the prior art references to achieve the claimed invention, and that the skilled artisan would have had a reasonable expectation of success in doing so.’” Intelligent Bio-Sys., Inc. v. Illumina Cambridge Ltd., 821 F.3d 1359, 1367–68 (Fed. Cir. 2016) (quoting Kinetic Concepts, Inc. v. Smith & Nephew, Inc., 688 F.3d 1342, 1360 (Fed. Cir. 2012)); see also KSR, 550 U.S. at 418 (for an obviousness analysis, “it can be important to identify a reason that would have prompted a person of ordinary skill in the relevant field to combine the elements in the way the claimed new invention does”). Also, “[t]hough less common, in appropriate” slip op. at 8

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 12,039,243
  • PTAB · Oct 15, 2025 · IPR2025-00762 · APJ Scott B Howard · IPR · Institution

    The Board instituted IPR on claims 1–5 and 8–12 on all asserted grounds, finding a reasonable likelihood that claim 1 would have been obvious over Koskinen.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “determine whether to institute an inter partes review. 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). Inter partes review may not be instituted unless “the information presented in the petition filed under [35 U.S.C.] section 311 and any response filed under [35 U.S.C.] section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). “When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). For the reasons set forth below, upon considering the briefing and the evidence of record, we determine that the information presented in the Petition establishes a reasonable likelihood that Petitioner will prevail with respect to at least one of the challenged claims. Accordingly, we institute inter partes review on all of the challenged claims based on all of the grounds identified in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person having ordinary skill in the art “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field and at least two years of practical experience with design or development of telecommunication and/or wireless communications systems, or the equivalent.” Pet. 7 (citing Ex. 1003 ¶¶ 19–21). Petitioner further argues that “[a]dditional education” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “For the purposes of this Decision, we need not expressly construe any claim terms.6 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “Additionally, a person having ordinary skill in the art would have known and been familiar with information elements (IEs) that specified an RLC reordering timer value based on (1) general knowledge that IEs carried information in RRC messages and (2) that 3GPP TSs describe an IE carrying recording timer duration information for the RLC layer. See Ex. 1003 ¶ 151; Ex. 1014, 219–20. Accordingly, it would have been obvious to a person having ordinary skill in the art “that the PDCP timer information, which used similar variables as its RLC counterpart (Koskinen, ¶¶37-38), would also be carried in a PDCP configuration IE.” Ex. 1003 ¶ 151.” slip op. at 13

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,863,573
  • PTAB · Oct 14, 2025 · IPR2024-00422 · APJ Scott B Howard · IPR · Final written decision

    The Board held claims 1–152 unpatentable based on the asserted obviousness grounds and struck Section II of Petitioner’s reply claim-construction brief.

    RulingsFinal written decision
    • BurdenFwd all claims unpatentableUnpatentable

      “Decision issues pursuant to 35 U.S.C. § 318(a). For the reasons that follow, we determine that Petitioner has shown by a preponderance of the evidence that the challenged claims are unpatentable.” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “1. “Contracted to Display a TV Ad Petitioner argues that the term means “contracted to display any form” slip op. at 14

    • Strike new argumentGranted

      “FURTHER ORDERED that Section II of Petitioner’s Reply Claim Construction Brief is stricken from the record; and” slip op. at 80

    Patent outcomesUS 7,861,260 unpatentable
    Claim constructioncites Phillips · KSR · Graham
    Patents in suitUS 7,861,260
  • PTAB · Oct 14, 2025 · IPR2025-00128 · APJ Scott B Howard · IPR · Final written decision

    The Board held claims 1–152 unpatentable based on obviousness grounds and struck Section II of Petitioner’s Reply Claim Construction Brief.

    RulingsFinal written decision
    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner

      “1. “Contracted to Display a TV Ad Petitioner argues that the term means “contracted to display any form” slip op. at 14

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableUnpatentable

      “d) Conclusion Regarding Claim 1 For the reasons set forth above, Petitioner has demonstrated by a preponderance of the evidence that the subject matter of claim 1 would have been obvious over Baig, Costa, and Zwicky. 5. Analysis of Claims 2–5, 7–9, 12, 15, 17, 21, 22, 24, 26–28, 31, 32, 34, 37, 42, 44, 53, 54–58, 61, 62, 69, 71–80, 83, 84, 86–88, 91, 94, 96, 100, 101, 103, 106, 116–119, 122, 125, 128, 135, 137– 145, 147, 148, 151, and 152 Petitioner argues that the combination of Baig, Costa, and Zwicky teaches the limitations recited in claims 2–5, 7–9, 12, 15, 17, 21, 22, 24, 26–28, 31, 32, 34, 37, 42, 44, 53, 54–58, 61, 62, 69, 71–80, 83, 84, 86–88, 91, 94, 96, 100, 101, 103, 106, 116–119, 122, 125, 128, 135, 137–145, 147, 148, 151, and 152 and that a person having ordinary skill in the art would have combined the teachings with a reasonable expectation of success. Pet. 28–60; 422Pet. 29–51. Petitioner’s arguments are supported by citations to the prior art and the testimony of Mr. Lett. See Pet. 28–60; 422Pet. 29–51. We have reviewed Petitioner’s arguments and evidence, agree with them, and, therefore, adopt Petitioner’s arguments and evidence as our own. Patent Owner does not separately address those claims. See PO Resp.; 422PO Resp. Instead, Patent Owner only relies on the arguments discussed above for claim 1. See PO Resp. 13–16; 422PO Resp. 13–16. For the same reason as discussed above in Section II.D.4(b), we do not agree with Patent Owner’s arguments regarding the reason to combine the references. Accordingly, Petitioner has shown by a preponderance of the evidence” slip op. at 50

    • Strike new argumentNew argument disregardedGranted

      “F. Sua Sponte Striking Section II of Petitioner’s Reply Claim Construction Brief Our order allowing post-hearing claim construction briefing stated that “[t]he parties may not address any issues besides claim construction.” Paper 38, 1. Despite that order, Section II of Petitioner’s Reply Claim Construction Brief addresses obviousness under Patent Owner’s proposed construction. See Pet. Reply Post-hearing Br. 2–3 (Titled: “The Petition’s Obviousness Theory Renders Claims 121 and 146 Obvious Even Under Patent Owner’s Improper Construction.”). Because the section is in violation of our order, we sua sponte strike that section. See 37 C.F.R. § 42.12.” slip op. at 74

    Patent outcomesUS 7,861,260 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,861,260
  • PTAB · Oct 14, 2025 · IPR2024-00421 · APJ Scott B Howard · IPR · Final written decision

    The Board held claims 1–152 unpatentable over the asserted prior art and struck Section II of Petitioner’s reply claim construction brief.

    RulingsFinal written decision
    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “d) Conclusion Regarding Claim 1 For the reasons set forth above, Petitioner has demonstrated by a” slip op. at 50

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownOther

      “1. “Contracted to Display a TV Ad Petitioner argues that the term means “contracted to display any form” slip op. at 14

    • Strike new argumentGranted

      “F. Sua Sponte Striking Section II of Petitioner’s Reply Claim Construction Brief Our order allowing post-hearing claim construction briefing stated that “[t]he parties may not address any issues besides claim construction.” Paper 38, 1. Despite that order, Section II of Petitioner’s Reply Claim Construction Brief addresses obviousness under Patent Owner’s proposed construction. See Pet. Reply Post-hearing Br. 2–3 (Titled: “The Petition’s Obviousness Theory Renders Claims 121 and 146 Obvious Even Under Patent Owner’s Improper Construction.”). Because the section is in violation of our order, we sua sponte strike that section. See 37 C.F.R. § 42.12.” slip op. at 74

    Patent outcomesUS 7,861,260 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,861,260
  • PTAB · Oct 1, 2025 · IPR2024-00943 · APJ Scott B Howard · IPR · Final written decision

    Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and the stated Rao combinations render the remaining claims obvious.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Expert testimonyPetitioner expert creditedDecided for petitioner
    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed

      “preponderance of the evidence that claim 3 was anticipated by Rao.” slip op. at 25

    Patent outcomesUS 8,589,541 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,589,541
  • PTAB · Oct 1, 2025 · IPR2024-00942 · APJ Scott B Howard · IPR · Final written decision

    Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and Rao-based combinations render the others obvious.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Expert testimonyOther

      “157, and 171 are anticipated by Rao. Pet. 1, 19–39, 42. Petitioner’s arguments are supported by citations to the prior art and the testimony of Dr. Wolfe. See id. We have reviewed Petitioner’s arguments and evidence, agree with them, and, therefore, adopt Petitioner’s arguments and evidence as our own.” slip op. at 26

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed

      “anticipated by Rao. Pet. 1, 30–31, 33–42. We have reviewed Petitioner’s arguments for each of those dependent claims. See Pet. 30–31, 33–42. For each of those dependent claims, the Petition appears to only argue a theory of obvious. That is, the Petition never states that the additional limitation is disclosed by Rao. See id. For example, claim 26 depends from claim 1 and further recites “wherein the policy is based on a background service class.” Ex. 1001, 112:49–52. We reproduce Petitioner’s arguments directed to claim 26 below: Rao’s policies 520 may “define prioritization” for network packets “based on whether an application is running in the foreground or the background.” [Ex. 1002] ¶ 182; id. ¶¶ 38–43, 180, 182, 188–89, 193, Figs. 5A, 5B. Each packet “may be placed and arranged in a priority order respective to all other . . . packets to provide a packet by packet prioritization across all applications 338a-338n and . . . network packets.” Id. ¶ 191. It would have been obvious to determine and apply a policy assigning a specific priority to packets associated with background applications, supra [1e]-[1f], and Rao thus discloses or renders obvious assigning a priority to network communications based on whether they are characterized as background services (class of services associated with application(s) running in the background of client 105), EX-1015 ¶¶195-96; supra [1e], [1f]. Pet. 33–34. Although the Petition sets forth why the claim limitation would have been obvious, there is no discussion as to how the additional limitation of claim 26—policy based on background class—is disclosed in Rao. See id. Similar arguments are presented for the other claims. See Pet. 30–31, 35–42. Because the Petition does not sufficiently show how the additional limitations recited in claims 20, 26, 58, 64, 165, and 169 were disclosed by Rao, Petitioner has not shown by a preponderance of the evidence that claims 20, 26, 58, 64, 165, and 169 were anticipated by Rao.” slip op. at 28

    Patent outcomesUS 8,589,541 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,589,541
Page 1 of 16
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.