  • PTAB · Jan 15, 2026 · IPR2025-01231 · APJ Mary C Hoffman · IPR · Institution

    The Board instituted IPR on claims 1–13 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “petition identifies all real parties in interest. 35 U.S.C. § 312(a)(2). Whether an unnamed party is a real party in interest “is a highly fact-dependent question.” See Applications in Internet Time, LLC v. RPX Corp., 897 F.3d 1336, 1351, 1360 (Fed. Cir. 2018) (“AIT”); Ventex Co., Ltd. v. Columbia Sportswear N. Am., Inc., IPR2017-00651, Paper 152 at 4–5 (PTAB Jan. 24, 2019) (precedential) (citing Worlds Inc. v. Bungie, Inc., 903 F.3d 1237, 1242 (Fed. Cir. 2018)); Consolidated Trial Practice Guide, 13 (2019), https://www.uspto.gov/sites/default/files/documents/tpgnov.pdf (CTPG). “A common consideration is whether the non-party exercised or could have exercised control over a party’s participation in a proceeding.” CTPG at 16. Other considerations include whether the non-party is funding or directing the proceeding; the non-party’s relationship with the petitioner; the non-party’s relationship to the petition itself, including the nature and/or degree of involvement in the filing; and the nature of the entity filing the petition. Id. at 17–18.” slip op. at 8

    • Skill levelSkill level board ownOther

      “person of ordinary skill in the art (“POSITA”) “would have at least a bachelor’s degree in electrical engineering or a related field and at least two years of experience with lighting technology.” Pet. 2 (citing Ex. 1017 ¶ 35). Petitioner makes additional contentions about what a POSITA would have understood. Id. (“A POSITA would understand that all types of cameras (e.g., analog and digital, photo and video) generally involve the same lighting considerations . . . . [and] that it is important to provide light that evenly illuminates the target subject or object to minimize reflected glare and shadows.”). Patent Owner contends that a POSITA would have at least: (a) a bachelor’s degree in electrical engineering, optical engineering, or a related field; (b) two years of practical experience in designing and developing lighting systems, particularly those integrated with electronic devices such as webcams or computer monitors; and (c) knowledge of user-interface considerations for consumer electronics . . . . Additional experience can substitute for education and vice versa. Prelim. Resp. 12 (citing Ex. 2036 ¶ 48). Patent Owner disputes Petitioner’s contentions regarding what a POSITA would have understood. Prelim. Resp. 12–13 (“[O]ne of ordinary skill in the art would have understood that analog and digital cameras have different operating principles and lighting requirements [and] Petitioner’s lack of appreciation for the suitability and unsuitability of different lights for different applications infects and dooms its invalidity analysis.” (citing Ex. 2036 ¶¶ 36–47)). and years of experience required for a POSITA. Pet. 2; Prelim. Resp. 12. For purposes of this Decision, we consider a person of ordinary skill in the art to have a bachelor’s degree in electrical engineering or related field and two years of practical experience in lighting technology, and that additional experience may substitute for education and vice versa, which is consistent with the level of skill reflected in the ’729 patent and prior art of record. See Exs. 1001, 1005–1010, 1012–1015; see also Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Patent Owner agrees that the Board need not formally construe any claim terms in order to adjudicate the merits of the Petition and argues Petitioner fails to show unpatentability of any claim under any reasonable construction of the claims. Prelim. Resp. 13 (citing Ex. 2036 ¶ 51). We determine that no express claim construction is necessary to determine whether institution is warranted in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (holding that only terms in controversy must be construed “and only to the extent necessary to resolve the controversy”) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 14

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “claimed subject matter and the prior art are “such that the subject matter as a whole would have been obvious at the time the invention was made to a person having ordinary skill in the art to which said subject matter pertains.” KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). When a ground in a petition is based on a combination of references, we consider “whether there was an apparent reason to combine the known elements in the fashion claimed by the patent at issue.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). We base our obviousness inquiry on factual considerations including (1) the scope and content of the prior art, (2) any differences between the claimed subject matter and the prior art, (3) the level of skill in the art, and (4) any objective indicia of obviousness or non-obviousness that may be in evidence.14 See Graham, 383 U.S. at 17–18.” slip op. at 24

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,841,729
  • PTAB · Oct 28, 2025 · IPR2024-00850 · APJ Arthur M Peslak · IPR · Final written decision

    Claims 1, 3–12, 14, and 23–27 are unpatentable as obvious over Raizer and Hangzhou.

    RulingsFinal written decision
    • Skill levelOther

      “B. Level of Ordinary Skill in the Art We consider the asserted grounds of unpatentability in view of the” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction Neither Petitioner nor Patent Owner proposes an express construction” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.” KSR, 550 U.S. at 417. In this case, we must determine whether one of ordinary skill in the art would recognize that Hangzhou’s disclosure of driving its auto-guided trolleys 200 under shelves 100 would improve the operation of Raizer’s system in the same way. For us to resolve this question in Petitioner’s favor, Petitioner must provide “some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). However, bodily incorporation, i.e., “an actual physical substitution of” Hangzhou’s auto-guided trolleys or operating software into Raizer’s system, is not required. See In re Mouttet, 686 F.3d 1322, 1332 (Fed. Cir. 2012) (“It is well-established that a determination of obviousness based on teachings from multiple references does not require an actual, physical substitution of elements.”); In re Nievelt, 482 F.2d 965, 968 (CCPA 1973) (“Combining the teachings of references does not involve an ability to combine their specific structures.”).” slip op. at 23

    Patent outcomesUS 11,472,632 unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,472,632
  • PTAB · Oct 16, 2025 · PGR2025-00041 · APJ Justin T Arbes · PGR · Institution

    The Board instituted PGR of claims 1–20 on all asserted grounds after finding claim 1 more likely than not obvious over Hendry.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “a post-grant review unless the information in the petition, if unrebutted, “would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” See 37 C.F.R. § 42.4(a) (“The Board institutes the trial on behalf of the Director.”). For the reasons that follow, we institute a post-grant review as to claims 1–20 of the ’243 patent on all grounds of unpatentability asserted in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “a person of ordinary skill in the art would have had “at least a bachelor’s degree in computer science, electrical engineering, or a related field, and two years’ experience in data management or client-server systems and communications,” where “a higher education or skill level might make up for less experience, and vice-versa.” Pet. 6 (citing Ex. 1003 ¶¶ 35–39). Patent Owner did not file a Preliminary Response disputing Petitioner’s position. Based on the record presented, including our review of the ’243 patent and the types of problems and solutions described in the ’243 patent and cited prior art, we agree with Petitioner’s proposed definition of the level of ordinary skill in the art and apply it for purposes of this Decision, except that we remove the term “at least” to eliminate vagueness as to the amount of education and practical experience.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “any reasonable construction.” Pet. 7. Patent Owner did not file a Preliminary Response disputing Petitioner’s position. We conclude that no express interpretation of any claim term is necessary to determine whether to institute a post-grant review in this proceeding.4 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)). 4 The parties, however, are encouraged to address during trial (1) interpretation of the term “user profile” in the challenged claims, particularly in view of the Specification’s apparent definition of the term “profile” (see Ex. 1001, col. 14, ll. 51–55) and description of exemplary data from which a “user profile” may be generated (id. at col. 18, ll. 40–58), and (2) the scope of the various instances of the phrase “in response to” in the challenged claims. Also, if either party intends to argue a claim interpretation during trial, including what the plain and ordinary meaning of a term is, the party should do so in a clearly designated section of its briefing. See Patent Trial and Appeal Board Consolidated Trial Practice Guide (Nov. 2019), 44–49, available at https://www.uspto.gov/ TrialPracticeGuideConsolidated; O2 Micro Int’l Ltd. v. Beyond Innovation Tech. Co., 521 F.3d 1351, 1361 (Fed. Cir. 2008) (“A determination that a claim term ‘needs no construction’ or has the ‘plain and ordinary meaning’ may be inadequate when a term has more than one ‘ordinary’ meaning or when reliance on a term’s ‘ordinary’ meaning does not resolve the parties’ dispute.”).” slip op. at 11

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “each of its elements was, independently, known in the prior art.” KSR, 550 U.S. at 418. An obviousness determination based on a combination of references requires finding “both ‘that a skilled artisan would have been motivated to combine the teachings of the prior art references to achieve the claimed invention, and that the skilled artisan would have had a reasonable expectation of success in doing so.’” Intelligent Bio-Sys., Inc. v. Illumina Cambridge Ltd., 821 F.3d 1359, 1367–68 (Fed. Cir. 2016) (quoting Kinetic Concepts, Inc. v. Smith & Nephew, Inc., 688 F.3d 1342, 1360 (Fed. Cir. 2012)); see also KSR, 550 U.S. at 418 (for an obviousness analysis, “it can be important to identify a reason that would have prompted a person of ordinary skill in the relevant field to combine the elements in the way the claimed new invention does”). Also, “[t]hough less common, in appropriate” slip op. at 8

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 12,039,243
  • PTAB · Oct 15, 2025 · IPR2025-00762 · APJ Scott B Howard · IPR · Institution

    The Board instituted IPR on claims 1–5 and 8–12 on all asserted grounds, finding a reasonable likelihood that claim 1 would have been obvious over Koskinen.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “determine whether to institute an inter partes review. 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). Inter partes review may not be instituted unless “the information presented in the petition filed under [35 U.S.C.] section 311 and any response filed under [35 U.S.C.] section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). “When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). For the reasons set forth below, upon considering the briefing and the evidence of record, we determine that the information presented in the Petition establishes a reasonable likelihood that Petitioner will prevail with respect to at least one of the challenged claims. Accordingly, we institute inter partes review on all of the challenged claims based on all of the grounds identified in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person having ordinary skill in the art “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field and at least two years of practical experience with design or development of telecommunication and/or wireless communications systems, or the equivalent.” Pet. 7 (citing Ex. 1003 ¶¶ 19–21). Petitioner further argues that “[a]dditional education” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “For the purposes of this Decision, we need not expressly construe any claim terms.6 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “Additionally, a person having ordinary skill in the art would have known and been familiar with information elements (IEs) that specified an RLC reordering timer value based on (1) general knowledge that IEs carried information in RRC messages and (2) that 3GPP TSs describe an IE carrying recording timer duration information for the RLC layer. See Ex. 1003 ¶ 151; Ex. 1014, 219–20. Accordingly, it would have been obvious to a person having ordinary skill in the art “that the PDCP timer information, which used similar variables as its RLC counterpart (Koskinen, ¶¶37-38), would also be carried in a PDCP configuration IE.” Ex. 1003 ¶ 151.” slip op. at 13

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,863,573
  • PTAB · Oct 14, 2025 · IPR2024-00421 · APJ Scott B Howard · IPR · Final written decision

    The Board held claims 1–152 unpatentable over the asserted prior art and struck Section II of Petitioner’s reply claim construction brief.

    RulingsFinal written decision
    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “d) Conclusion Regarding Claim 1 For the reasons set forth above, Petitioner has demonstrated by a” slip op. at 50

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownOther

      “1. “Contracted to Display a TV Ad Petitioner argues that the term means “contracted to display any form” slip op. at 14

    • Strike new argumentGranted

      “F. Sua Sponte Striking Section II of Petitioner’s Reply Claim Construction Brief Our order allowing post-hearing claim construction briefing stated that “[t]he parties may not address any issues besides claim construction.” Paper 38, 1. Despite that order, Section II of Petitioner’s Reply Claim Construction Brief addresses obviousness under Patent Owner’s proposed construction. See Pet. Reply Post-hearing Br. 2–3 (Titled: “The Petition’s Obviousness Theory Renders Claims 121 and 146 Obvious Even Under Patent Owner’s Improper Construction.”). Because the section is in violation of our order, we sua sponte strike that section. See 37 C.F.R. § 42.12.” slip op. at 74

    Patent outcomesUS 7,861,260 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,861,260
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Oct 1, 2025 · IPR2024-00942 · APJ Scott B Howard · IPR · Final written decision

    Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and Rao-based combinations render the others obvious.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Expert testimonyOther

      “157, and 171 are anticipated by Rao. Pet. 1, 19–39, 42. Petitioner’s arguments are supported by citations to the prior art and the testimony of Dr. Wolfe. See id. We have reviewed Petitioner’s arguments and evidence, agree with them, and, therefore, adopt Petitioner’s arguments and evidence as our own.” slip op. at 26

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed

      “anticipated by Rao. Pet. 1, 30–31, 33–42. We have reviewed Petitioner’s arguments for each of those dependent claims. See Pet. 30–31, 33–42. For each of those dependent claims, the Petition appears to only argue a theory of obvious. That is, the Petition never states that the additional limitation is disclosed by Rao. See id. For example, claim 26 depends from claim 1 and further recites “wherein the policy is based on a background service class.” Ex. 1001, 112:49–52. We reproduce Petitioner’s arguments directed to claim 26 below: Rao’s policies 520 may “define prioritization” for network packets “based on whether an application is running in the foreground or the background.” [Ex. 1002] ¶ 182; id. ¶¶ 38–43, 180, 182, 188–89, 193, Figs. 5A, 5B. Each packet “may be placed and arranged in a priority order respective to all other . . . packets to provide a packet by packet prioritization across all applications 338a-338n and . . . network packets.” Id. ¶ 191. It would have been obvious to determine and apply a policy assigning a specific priority to packets associated with background applications, supra [1e]-[1f], and Rao thus discloses or renders obvious assigning a priority to network communications based on whether they are characterized as background services (class of services associated with application(s) running in the background of client 105), EX-1015 ¶¶195-96; supra [1e], [1f]. Pet. 33–34. Although the Petition sets forth why the claim limitation would have been obvious, there is no discussion as to how the additional limitation of claim 26—policy based on background class—is disclosed in Rao. See id. Similar arguments are presented for the other claims. See Pet. 30–31, 35–42. Because the Petition does not sufficiently show how the additional limitations recited in claims 20, 26, 58, 64, 165, and 169 were disclosed by Rao, Petitioner has not shown by a preponderance of the evidence that claims 20, 26, 58, 64, 165, and 169 were anticipated by Rao.” slip op. at 28

    Patent outcomesUS 8,589,541 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,589,541
  • PTAB · Sep 3, 2025 · IPR2024-00441 · APJ Aaron W Moore · IPR · Final written decision

    Claims 1–18 are unpatentable over Kamieniecki and Konstantinos; Petitioner did not show claims 1–18 unpatentable over Renken or Renken and Cholas because Renken is not prior art.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Level of Ordinary Skill in The Art Petitioner contends that a person having ordinary skill in the art “would have had a degree in electrical engineering or a similar discipline, and three-to-four years of experience working with television signal processing and communication 1 Because the challenged claims have an effective filing date before the effective date of the AIA, we apply the pre-AIA version of 35 U.S.C. § 103. 2 US 2005/0114879 A1, published May 26, 2005 (Ex. 1009). 3 US 2010/0120386 A1, published May 13, 2010 (Ex. 1010). 4 US 2010/0303181 A1, published Dec. 2, 2010 (Ex. 1016). 5 US 2008/0313691 A1, published Dec. 18, 2008 (Ex. 1017). 6 US 8,649,421 B2, issued Feb. 11, 2014 (Ex. 1011). systems,” and that “[a]dditional education may substitute for professional experience and significant work experience may substitute for formal education.” Pet. 30 (citing Ex. 1002 ¶¶ 40–42). “Patent Owner accepts the Petition’s [description of a person of ordinary skill] solely for purposes of responding to the Petition in this proceeding.” PO Resp. 11. Based on our review of the record before us, we determine that Petitioner’s stated level of ordinary skill in the art is reasonable because it appears consistent with the evidence of record, including the asserted prior art. Accordingly, we apply Petitioner’s definition in this Decision. B.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “On the present record, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). C.” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “We agree that the record provides sufficient evidence that one of ordinary skill in the art would have found it advantageous to add a multi-channel receiver to improve monitoring, as Petitioner argues. Having the ability to monitor without waiting for idle or disturbing users would be a clear advantage.” slip op. at 18

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “We conclude that Patent Owner has not shown a sufficient nexus between the claimed invention and any product embodying the claimed invention that was successful, praised, or solved a long-felt need. Patent Owner identifies five elements allegedly required “[t]o implement MaxLinear’s Remote Spectrum Monitoring in CPE.” See PO Resp. 65. To support this, Patent Owner cites pages 5–7 of Exhibit 2009. See id.7 That exhibit, however, describes requirements for “Full Band Capture,” not MaxLinear’s “Remote Spectrum Monitoring.” To” slip op. at 31

    Patent outcomesUS 8,792,008 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousness
    Patents in suitUS 8,792,008
Page 1 of 21
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.