- Uatp IP LLC v. Slick Slide LLCSome claims unpatentablePTAB · Oct 2, 2026 · PGR2024-00054 · APJ Brian D Range · PGR · Final written decision
Claims 22–26 are unpatentable based on obviousness; claims 1–17, 27, and 28 were not shown unpatentable. Patent Owner’s motion to terminate was denied.
RulingsFinal written decision- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownDecided for patent owner
“1. Mesh Layer Petitioner contends “no formal claim construction is necessary in this” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“5. Analysis On this complete record, we determine that Petitioner’s arguments do” slip op. at 31
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable
“form of nylon and some form of Teflon (and possible combinations thereof) having the specific coefficient of friction range given in limitation [1c] breaks down, because the building blocks of the obviousness argument are not sufficiently identified in Phillips alone, nor in the supporting testimony. Accordingly, we determine that Petitioner’s arguments and evidence fail to show that Phillips renders the challenged claims obvious. 6. Conclusion Based on the foregoing, we determine that Petitioner has not established by a preponderance of the evidence that claims 1–4, 6, and 7 would have been anticipated by or obvious in view of Phillips.” slip op. at 33
- Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner
“2. Products and Nexus We first consider the issue of whether certain evidence relied upon by” slip op. at 20
Patent outcomesUS 11,998,854 mixedClaim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips · Graham · NautilusPatents in suitUS 11,998,854 - Solaris Oilfield Site Services Operating, LLC / Solaris Oilfield Site Services Personnel, LLC v. Masaba, Inc.All claims unpatentablePTAB · Jan 26, 2026 · IPR2024-01179 · APJ Carl M Defranco · IPR · Final written decision
Claims 1–25 are unpatentable under § 103 over the asserted combinations of Waldner, Dynatek, and additional references; the Board cancelled all challenged claims.
RulingsFinal written decision- Expert testimonyPetitioner expert creditedPatent owner expert discountedDecided for petitioner
“Also, to the extent Masaba relies on extrinsic expert testimony, we note that Masaba’s expert cites absolutely no support for his understanding of the claims, much less explains why we should adopt his understanding over the plain and ordinary meaning of “conveying aggregate” and “moving aggregate.” See Ex. 2004 ¶ 34. Absent supporting citations, such extrinsic testimony is entitled to little, if any, weight. As such, we reject the notion that Waldner’s discharge chute member 242 is not a conveyor “for conveying aggregate” or “for moving aggregate,” as required by claim elements 1[h] and 1[i].” slip op. at 21
- Skill levelSkill level petitioner adoptedDecided for petitioner
“We disagree that Dr. Durham does not possess the necessary level of skill in the art to qualify as an expert in this case. Looking at the specification of the ’689 patent and the prior art of record, we think Masaba sets the bar too high. We acknowledge that one of ordinary skill in the art should have some education and/or experience in the mechanical art of conveying aggregate materials, but we do not think opining on the ’689 patent and asserted prior art necessarily requires that person to have the amount of education and experience that Masaba advocates. The ’689 patent relates generally to an “aggregate transferring system for receiving aggregate from a vehicle and elevating the aggregate to a higher vertical level for deposit into, for example, a silo.” Ex. 1001, 1:15– 18. And, as described in the ’689 patent and discussed later, the transferring system is an assembly of known types of conveyors, such as a belly-dump truck conveyor, a bucket elevator, and an articulated belt conveyor, for transferring the aggregate horizontally and vertically from a belly-dump truck to the discharge point, such as a silo. Without doubt, Dr. Durham has enough education and experience to reliably opine on the combination of known parts.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Plain and ordinary meaningNo construction needed
“We reject this argument for several reasons. First, nowhere does the plain language of the claims specify how the aggregate is conveyed or moved from the conveyor extension assembly’s inlet to its outlet, be it passively by means of gravity or actively by means of a conveyor belt. Instead, the claims simply use those verbs according to their plain and ordinary meaning, which is “to transfer or deliver” or “to cause to go or pass” from one place to another. See Ex. 3001, 253 (defining “convey”), 760 (defining “move”).10 Second, the specification of the ’689 patent similarly uses these terms in a plain and ordinary sense, without ever attributing to them some sort of special meaning. See, e.g., Ex. 1001, 4:9–12 (“The apparatus 10 is suitable for performing the transfer of aggregate from 10 We reference the original pagination of the dictionary in which these definitions appear. one location to another, such as, for example, from a vehicle carrying the aggregate to a silo 1 for storing the aggregate.”). The ’689 patent specification also makes clear that active conveyance of the aggregate is an option and not a requirement of the claimed invention, stating that the conveyor extension assembly “may further include a conveyor belt 150.” Ex. 1001, 10:60–66 (emphasis added). Limiting claim elements 1[h] and 1[i] to a device “for actively conveying” or “for actively moving aggregate” would improperly import limitations from the specification into the claims. Thus, based on the intrinsic evidence, we determine that claim elements 1h and 1k are properly construed to encompass passive and/or active movement of the aggregate via the conveyor extension assembly.” slip op. at 20
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Not reached
“Owner asserts” that two claim terms—“unloader structure” and “trailer structure”—should be construed as means-plus-function limitations under 35 U.S.C. § 112(f), Solaris submits an express construction detailing the corresponding structure in the specification for performing the recited function of the claimed unloader and trailer structures. See id. at 24–25. Only in disputing Solaris’s Ground 3 does Masaba advocate that the claim term “trailer structure” should be construed under § 112(f), and then only in conjunction with dependent claims 3 and 21. See PO Resp. 58. As such, we address Masaba’s proposed construction in our analysis of Ground 3. We now turn to Solaris’s grounds of unpatentability.” slip op. at 12
Patent outcomesUS 11,780,689 unpatentableClaim construction§ 103 obviousnesscites KSRPatents in suitUS 11,780,689 - Weatherford U.S., L.P v. Halliburton Energy Services, Inc.Some claims unpatentablePTAB · Dec 9, 2025 · IPR2024-00990 · APJ Brent M Dougal · IPR · Final written decision
Claims 11–12 and 14–20 are unpatentable; claims 1–10 and 21–23 are not shown unpatentable. Substitute claims 29–37 are unpatentable, and the motion to amend is denied as to them.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“The level of skill is uncontested. Patent Owner adopts the level of skill identified by Petitioner as: [at] the time of the alleged invention in 2018, a POSITA[2] would have had a B.S. degree in mechanical or petroleum engineering or a similar technical discipline, with at least five years of experience in oil or gas well drilling, completion, and/or subsurface production operations or in technical support of such operations including at least some experience in unconsolidated formations utilizing sand control methods and means. Also,” slip op. at 8
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableNot shown unpatentableMixed
“on embodiments of Yeh with concentric sand screens having nine shunt tubes (six transport tubes and three packing tubes) (Yeh Figures 4A–B) and eccentric sand screens with four shunt tubes (two transport tubes and two packing tubes) (Yeh Figures 8A, 8C). See Pet. 32–37, 39, 41–43. Yet, Petitioner’s reasoning as to why “a higher-pressure shunt tube assembly necessitated greater wall thickness” rests on an unspoken one to one comparison between the shunt tubes of the different systems. See id.; see also Ex. 1003 ¶¶ 291–297 (Petitioner’s declarant comparing possible transport tubes of different pressure regions without considering or addressing any difference in the number of transport tubes). However, the embodiments relied on by Petitioner have different numbers of shunt tubes, and thus the greater wall thickness does not appear to be “necessitated” in the way inferred by Petitioner. Further, Petitioner’s analysis would seem to be most appropriate when comparing two concentric sand screens for different pressure regions, or two eccentric sand screens for different pressure regions. relies on Yeh’s teachings related to a horizontal well bore of 5000 feet for the “concentric screen → crossover tool → eccentric screen” arrangement, as well as, for why the concentric screen needs to be rated for a high pressure. Pet. 32–37, 39, 41–43. Petitioner also refers to these features for why one of skill in the art would combine the teachings of Yeh and Yeh2. Id. at 32. However, on cross-examination, Petitioner’s declarant agreed that it is concentric sand screens having a 6x3 shunt tube design that would provide the noted benefits of being rated for a higher pressure and being more robust (as relied on in the Petition), as compared to eccentric sand screens. Ex. 2013, 42:20–43:8; Sur-reply 4–5. This also exposes another issue with Petitioner’s arguments. Though Petitioner identifies that one of skill in the art would be aware that material choice, wall thickness, and pipe diameter all impact burst pressure of a pipe (Pet. 42 (citing Ex. 1017, 24 (Equation (14))), the Petition essentially ignores the fact that the claims do not require a single pipe in isolation. The claims require two shunt tube assemblies, each surrounding a base pipe within a wellbore. It is uncontested that a wellbore provides a confined space for such a system and thus any change in wall thickness of one pipe can result in a significant impact in the function of the other pipes. We find the testimony of Petitioner’s declarant (see, e.g., Ex. 1003 ¶¶ 290–297) unpersuasive when discussing wall thickness because it focusses on basic considerations of a standalone pipe, without sufficient consideration of the claimed completion assembly with its required pipe and tube structure. PO Resp. 20–26.” slip op. at 17
- Strike new argumentNew argument disregardedDecided for patent owner
“In response to Patent Owner’s argument concerning Yeh’s embodiments relied on in the Petition, Petitioner argues for the first time that Patent Owner’s declarant “conceded, Yeh discloses that both concentric and 47:19–48:21). Petitioner does not provide a citation to Yeh or a citation to where the Petition relies on the same number of shunt tubes between concentric and eccentric screens. The deposition cited by Petitioner discusses Yeh at column 16, lines 26 through 35. However, the Petition does not cite or rely on these teachings of Yeh. Thus, we decline to consider this late argument.4 See 35 U.S.C. § 312(a)(3) (requiring the petition to identify “with particularity . . . the grounds on which the challenge to each claim is based, and the evidence that supports the grounds”); 37 C.F.R. § 42.104(b)(5).” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundUnpatentable
“Thus, we agree with Petitioner that the combination of Yeh and Yeh2 teaches determining the shunt tube system operating pressures associated with the distal end of the production zone, but also more generally, determining the operating pressures along the entire production zone. With this knowledge of the system operating pressures, Petitioner argues that one of skill in the art would have selected eccentric screens for the distal end of the production zone “at any point at which the slurry pressure dropped below the pressure capacity of the eccentric screen shunt tubes.” Pet. 66 (citing Ex. 1005, 30:16–20; Ex. 1003 ¶ 388). In other words, knowing that the pressure decreases as you approach the toe, Yeh’s low-pressure rated eccentric screens could be used from some point prior to and covering the toe. determined pressure.” PO Resp. 37–38. We disagree. As discussed above, the record supports Petitioner’s position that one of skill in the art would have “understood the need to determine the shunt tube system operating pressure throughout the horizontal wellbore.” Ex. 1003 ¶ 383; see also Pet. 64–65. We find convincing Petitioner’s argument that one of skill with this understanding of the system pressures would select a shunt tube system rated to not only address the distal end, but also to address the needs of the adjacent region, so long as the pressure rating supported such a selection. See Pet. 65–67; Ex. 1003 ¶¶ 385–388.” slip op. at 22
Patent outcomesUS 11,333,007 mixedClaim construction§ 101 eligibility§ 103 obviousness§ 112 disclosurecites GrahamPatents in suitUS 11,333,007 - Motorola Solutions, Inc. v. Stellar LLCInstitutedPTAB · Feb 13, 2025 · IPR2024-01207 · APJ Robert L Kinder · IPR · Institution
The Board instituted IPR on claims 1–22, finding a reasonable likelihood that at least one claim is unpatentable under the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“validity repeats all of the assertions in this Petition.” Prelim. Resp. 13. Thus, a significant portion of the resources consumed in preparing for trial would likely be useful in this proceeding. On November 11, 2024, Petitioner offered a stipulation, stating that, upon institution on this proceeding, Petitioner “will not pursue as to the challenged claims any ground raised or that reasonably could have been raised during the IPR” in the parallel litigation. See Ex. 1043 (filed in this proceeding Nov. 27, 2024). Petitioner’s stipulation applies to the following proceedings, which includes this proceeding: IPR2024-01205, challenging claims 1–20 of U.S. Patent No. 7,593,034; IPR2024-01206, challenging claims 1–13 of U.S. Patent No. 9,485,471; IPR2024-01207, challenging claims 1–22 of U.S. Patent No. 8,692,882; and IPR2024-01208, challenging claims 1–23 of U.S. Patent” slip op. at 6
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Having considered the arguments and the associated evidence presented in the Petition and the Preliminary Response, for the reasons described below, we institute inter partes review.” slip op. at 2
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“At this stage of the proceeding, we are persuaded that Petitioner has established a reasonable likelihood that a person of ordinary skill would have combined the teachings of Yerazunis and Fiore for the reasons arguments do not directly address the specific combination proposed by Petitioner nor the specific motivations provided by Petitioner. For example, as explained further below in our analysis of claim 1, the gun embodiment of Yerazunis does not stop recording video after a triggering event. See Ex. 1017, 17:50–59. Moreover, Fiore’s file-based approach would provide the benefits highlighted by Petitioner regardless of whether Yerazunis stops recording video after a triggering event or continues recording to the next event. Similarly, the argument that Fiore does not selectively write protect data does not address Petitioner’s combination, which relies on Yerazunis, not Fiore, for teaching selectively write protecting data. Patent Owner’s argument also does not explain why a person of ordinary skill would not use Fiore’s file-based approach in implementing Yerazunis’s video recording device. Finally, Patent Owner’s argument that Fiore does not store individual segments within the circular buffer does not address Petitioner’s reliance on Yerazunis’s gun implementation in which individual segments are stored in the circular buffer. See Pet. 28 (“Yerazunis does disclose that in a gun camera embodiment, ‘the head pointer 104 and the tail pointer 102 . . . defining the area(s) of the circular buffer memory, are stored in a table to allow later retrieval of the video data pertaining to each firing of the gun.’” (quoting Ex. 1017, 17:50–56)); see also Pet. 30–32, 38–39.” slip op. at 22
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableInstituted
“of Yerazunis in combination with Fiore. On this record, Petitioner has demonstrated the similarities in the data recording systems of Yerazunis and Fiore. Petitioner asserts a reasonably sufficient basis for establishing the “specified frame data associated with [the] firing event” to be preserved as the disclosure of a designated segment that is write-protected. Based on the current record, we find Petitioner’s evidence more persuasive than Patent Owner’s assertion that Yerazunis preserves the entire buffer—not designated segments. Again, Petitioner admits Yerazunis does not expressly refer to “indexing write-protected segments as second files” but further establishes with sufficient basis that a person of ordinary skill in the art would understand the tagging features of Yerazunis aligns with the concept of indexing. Further, Petitioner shows that eventually it will be necessitated to locate or retrieve the data, providing further motivation for indexing, which is not only disclosed in Fiore, but demonstrated as well known in the art. See Pet. 28–29. Petitioner demonstrates the combination of Fiore and thus, on the current record, we are not persuaded by Patent Owner’s argument that Yerazunis only preserves post-recording data. Patent Owner further does not provide sufficient basis of reasoning that the “memory designation scheme” of Yerazunis which uses “unused block[s] of memory” establishes there is no write-protected segment. In consideration of the above, we are persuaded for purposes of this Decision that Petitioner has cited sufficient evidence to demonstrate that person of ordinary skill in the art would have had a rational basis to combine the teachings of Yerazunis and Fiore and this combination teaches these limitations of element 4.” slip op. at 33
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,692,882 - Motorola Solutions, Inc. v. Stellar LLCInstitutedPTAB · Feb 13, 2025 · IPR2024-01208 · APJ Brian J Mcnamara · IPR · Institution
The Board instituted IPR on claims 1–23 on all four §103 grounds, finding a reasonable likelihood of success based on Yerazunis or Ely, with Fiore and Lewellen.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“exercise our discretion to deny the Petition in favor of the parallel litigation. Prelim. Resp. 5–17. The Board has held that the advanced state of a parallel district court action is a factor that may weigh in favor of denying a petition under § 314(a). See NHK Spring Co. v. Intri-Plex Techs., Inc., IPR2018- 00752, Paper 8 at 20 (PTAB Sept. 12, 2018) (precedential); Trial Practice Guide, 58 & n.2. We consider the following factors to assess “whether efficiency, fairness, and the merits support the exercise of authority to deny institution in view of an earlier trial date in the parallel proceeding”: 1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 5–6 (PTAB Mar. 20, 2020) (precedential) (“Fintiv”). In evaluating these factors, we “take[] a” slip op. at 3
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“(“Petition” or “Pet.”), to institute an inter partes review (“IPR”) of claims 1– 23 (the “challenged claims”) of U.S. Patent No. 9,912,914 B2 (Ex. 1031, “the ’914 patent”). 35 U.S.C. § 311. Stellar LLC (“Patent Owner”) filed a Preliminary Response, Paper 8 (“Prelim. Resp.”), contending that the Petition should be denied as to all challenged claims. We have jurisdiction under 35 U.S.C. § 6, which provides that an inter partes review may not be instituted unless the information presented in the Petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” A decision to institute under § 314 may not institute on fewer than all claims challenged in the petition. SAS Inst., Inc. v. Iancu, 138 S. Ct. 1348, 1359–60 (2018). In addition, per Board practice, if the Board institutes trial, it will institute “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” See 37 C.F.R. § 42.108(a). Having considered the arguments and the associated evidence presented in the Petition and the Preliminary Response, for the reasons described below, we institute inter partes review.” slip op. at 2
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner
“Contentions Concerning Reasons to Combine Teachings of Yerazunis and Fiore Noting that Yerazunis and Fiore both concern recording devices with circular buffers that preserve data before and after a trigger event, Petitioner contends that an ordinarily skilled artisan would have had reason to combine the teachings of the references to incorporate into Yerazunis the benefits Fiore articulates concerning its file-based storage approach in such systems. Pet. 21. Petitioner emphasizes Fiore’s discussion of how implementing a circular buffer as a memory mapped file that indexes event data combines the access speed of the RAM memory with the large capacity of a disk file, making the indexing of data in memory mapped file 110 transparent to the circular buffer’s access objects. Id. at 21–22. Petitioner also emphasizes that an ordinarily skilled artisan would have had a reasonable expectation of success, given Fiore’s detailed disclosure of applying its techniques in a system like that of Yerzunis. Id. at 22 (citing Ex. 1003, Sarhan Decl. ¶¶ 168–172).” slip op. at 16
- Skill levelSkill level petitioner adoptedDecided for petitioner
“VIII. LEVEL OF ORDINARY SKILL IN THE ART Petitioner describes a person of ordinary skill in the art (“POSITA” or “ordinarily skilled artisan”) as having “at least a Bachelor’s Degree in electrical engineering, computer science, or computer engineering, or undergraduate training in an equivalent field and at least two years of relevant experience in electronics technology.” Pet. 7 (citing Ex. 1003, Sarhan Decl. ¶¶ 24–25). Petitioner further states that “[a]dditional graduate education could substitute for professional experience, and significant work experience could substitute for formal education.” Id. Patent Owner does not address the qualifications of a person of ordinary skill in the art. See Prelim. Resp. The level of ordinary skill in the art usually is evidenced by the references themselves. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). As Petitioner’s proposed description of a person of ordinary is commensurate with the subject matter” slip op. at 9
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,912,914 - Cambridge Mobile Telematics, Inc. v. Sfara, Inc.Institution deniedPTAB · Dec 13, 2024 · IPR2024-00966 · APJ John F Horvath · IPR · Institution
The Board denied institution because the Petition did not explain whether the component limitations invoke § 112(f) or identify corresponding structure, as required by Rule 42.104(b)(3).
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied
“The Consolidated Trial Practice Guide[1,2](“CTPG”) . . . instructs that “[w]here claim language may be construed according to 35 U.S.C. § 112(f), a petitioner must provide a construction.” CTPG 45 (emphases added) (citing 37 C.F.R. § 42.104(b)(3)). The CTPG advises that a party “may choose to elaborate why § 112(f) should or should not apply to the limitation at issue.” Id. Notably, the CTPG warns that “[a] petitioner who chooses not to address construction under § 112(f) risks failing to satisfy the requirement of 37 C.F.R. § 42.104(b)(3).” Id.” slip op. at 6
- BurdenDenied
“Given these facts, we determine that rule 104(b)(3) mandates that the Petition either identify “the specific portions of the specification that describe the structure, material, or acts corresponding to each claimed function” recited in the “component” term limitations or explain why the “component” term limitations are not subject to a means-plus-function construction. This, it fails to do. To be clear, we note that our rules do not prohibit a petitioner from taking inconsistent claim construction positions before the Board and a district court. See 10x Genomics, Inc. v. Bio-Rad Labs, Inc., IPR2020- 00086, Paper 8 at 18 (PTAB Apr. 27, 2020). However, where, as here, a petitioner has proposed a claim term be construed solely as a means-plus-function limitation in a district court proceeding and emphasized that the issue is not only “most significant” but potentially “case . . . dispositive,” we determine the petition is obliged to either apply that construction in this proceeding or explain why that construction is not applicable. Accordingly, we find the Petition to be deficient under rule 104(b)(3).4” slip op. at 8
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Other
“connote a definite structure. See Williamson, 792 F.3d at 1350 (identifying words such as “mechanism,” “element,” “device,” and others as verbal constructs that do not connote sufficiently definite structures). Indeed, the Specification discloses all of the “components” recited in claims 1, 8, and 15, including the “comparing component,” can be “implemented as a computer having tangible computer-readable media for carrying or having computer-executable instructions or data structures stored thereon.” Ex. 1001, 5:35–43. Thus, like the word “module,” a recognized nonce word, each of the recited “components” is nothing more than “a generic description for software or hardware that performs a specified function” and their recitation “operate[s] as a substitute for ‘means’ in the context of § 112, para. 6.” Williamson, 792 F.3d at 1350. Accordingly, we construe the “comparing component” limitation recited in claims 1, 8, and 15 as a meansplus-function limitation whose function is “generating a comparison signal.”2” slip op. at 14
- Skill levelNot reached
Claim constructionDiscretionary denialcites MarkmanPatents in suitUS 9,333,946 - Cambridge Mobile Telematics, Inc. v. Sfara, Inc.Institution deniedPTAB · Dec 13, 2024 · IPR2024-00952 · APJ Brent M Dougal · IPR · Institution
The Board denied institution on claims 1–18 because the Petition failed to satisfy 37 C.F.R. § 42.104(b)(3) by omitting required claim-construction analysis.
RulingsInstitution decision- BurdenDenied
“Under these facts we determine that 37 C.F.R. § 42.104(b)(3) mandates that the Petition “identify the specific portions of the specification that describe the structure, material, or acts corresponding to each claimed function.” The Petition failed to do so. At a minimum, the Petition should have explained why the plain and ordinary meaning of the “component” terms should apply in this proceeding (why the inconsistent positions are warranted) or set forth an alternative means-plus-function claim construction. CTPG 45.” slip op. at 8
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied
“Under these facts we determine that 37 C.F.R. § 42.104(b)(3) mandates that the Petition “identify the specific portions of the specification that describe the structure, material, or acts corresponding to each claimed function.” The Petition failed to do so. At a minimum, the Petition should have explained why the plain and ordinary meaning of the “component” terms should apply in this proceeding (why the inconsistent positions are warranted) or set forth an alternative means-plus-function claim construction. CTPG 45.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner
“Under these facts we determine that 37 C.F.R. § 42.104(b)(3) mandates that the Petition “identify the specific portions of the specification that describe the structure, material, or acts corresponding to each claimed function.” The Petition failed to do so. At a minimum, the Petition should have explained why the plain and ordinary meaning of the “component” terms should apply in this proceeding (why the inconsistent positions are warranted) or set forth an alternative means-plus-function claim construction. CTPG 45.” slip op. at 8
Claim constructionDiscretionary denialcites MarkmanPatents in suitUS 8,989,952 - Lenovo (United States) Inc. / Motorola Mobility LLC v. Theta IP, LLCNo claims unpatentablePTAB · Oct 16, 2024 · IPR2023-00697 · APJ Barbara A Benoit · IPR · Final written decision
Claims 1, 3, 4, and 8 were not proven unpatentable: Rauhala does not disclose the required simultaneous signal-strength determinations, and Masaaki does not cure the deficiency for claim 4.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Following institution, Patent Owner maintained the same level of ordinary skill proposed in its preliminary response and did not address our discussion of the level of ordinary skill in the art in the Institution Decision. PO Resp. 24–25; see also Prelim. Resp. 24. For the reasons discussed in the Institution Decision, we adopt and apply for this Decision the level of ordinary skill articulated by Petitioner and used previously in our Institution Decision. See Dec. 8–10. In light of our review of the complete record, we find that this formulation is consistent with the ’825 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Ex. 1002 ¶¶ 27– 31. Our decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“We agree with Patent Owner that the desired signal and interferer signal must be received at the same time. The plain language of the claim requires the wireless transceiver to “receiv[e] a wireless signal having a desired signal and an interferer signal,” the determining of a signal strength of the interferer signal and the determining of a signal strength of the desired signal must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. The specification supports this understanding. “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:20–22; see also id. at 5:31–33 (“FIGS. 2A and 2B illustrate examples of desired signals, interferers, and noise that may be received by one of the various circuits in a” slip op. at 21
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that Rauhala does not state that the signal strengths are measured simultaneously or at the same time. Indeed, as discussed above, Rauhala indicates unequivocally in the same paragraph the opposite—that detector DET provides to control unit 42 “an indication about either the receive channel signal strength RSS or the strength of any signal on the reception band.” Ex. 1004 ¶ 17. Rauhala describes that “control unit 42 provides two one-bit control signals cA and cM” based on indications received from detector DET. Id. Importantly, Rauhala indicates that “at the same time as” describes how the control unit 42 uses the received inputs RSS and RSSn shown in Figure 4, which are described earlier in paragraph 17 as indications of either RSS or RSSn from detector DET. Id. (“Signal cA is 0 when signal RSS is greater than S4 and signal RSSn is at the 11 Dr. Baker’s reply declaration correctly quotes Rauhala paragraph 17 but cites to paragraph 18. We deem this harmless error. same time smaller than Sn. . . . Signal cM is 1 when signal RSS is not greater than S4 and signal RSSn is at the same time at least Sn. Otherwise, signal cM is 0.”). The burden remains on Petitioner to demonstrate by a preponderance of the evidence that Rauhala discloses the disputed limitations as arranged or combined in the claim. Petitioner does not persuasively reconcile these “either/or” statements regarding the functioning of detector DET with the “at the same time as” statements regarding control signals output by control unit 42 in paragraph 17. We do not find persuasive Petitioner counsel’s position expressed at the hearing that Rauhala’s “either/or” statements are “simply an imprecise description” (Tr. 16:22–24). We do not see a lack of precision in Rauhala’s “either/or” statements.” slip op. at 30
- Expert testimonyPetitioner expert discountedPatent owner expert creditedDecided for patent owner
“When asked at his deposition to explain Rauhala’s use of the word “or” regarding the functioning of detector DET, Dr. Baker asserted that “[detectors] can be designed to determine RSS or RSSn.” Ex. 2016, 85:5– 12. We find Dr. Baker’s testimony that “it’s reasonable that if you can design . . . the detector to detect one or the other, you can also design it to detect both” to be without factual support. Id. at 85:13–16. He points to no textbook or other independent evidence to support that would have led one of ordinary skill to design such a detector or to support that one of ordinary skill would have understood Rauhala’s detector to be so designed. Furthermore, Dr. Baker recognizes that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. We give little weight to Dr. Baker’s unsupported testimony that one could design a detector to detect both RSS and RSSn from the same wireless signal. See 37 C.F.R. 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”); see also Xerox Corp. v. Bytemark, Inc., No. IPR2022-00624, 2022 WL 3648989, at *6 (PTAB 2022) (precedential) (Director affirming because “the cited declaration testimony is conclusory and unsupported, adds little to the conclusory assertion for which it is offered to support, and is entitled to little weight”).” slip op. at 31
Patent outcomesUS 10,129,825 not shown unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,129,825 - Lenovo (United States) Inc. / Motorola Mobility LLC v. Theta IP, LLCNo claims unpatentablePTAB · Oct 16, 2024 · IPR2023-00698 · APJ Thomas L Giannetti · IPR · Final written decision
Claims 7–11, 13, and 19–21 were not shown unpatentable because Rauhala does not disclose simultaneous desired and interferer signal-strength determinations, defeating anticipation and the obviousness combination.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“The two proposals are materially similar in the education requirement, but differ marginally in professional experience required (three versus five years). See supra. While we were persuaded, on the preliminary record, that both Petitioner’s and Patent Owner’s proposals were consistent with the problems and solutions in the ’202 patent and the prior art of record, on balance, we determined that Petitioner’s proposal was a better reflection of the level of skill in the prior art, and we therefore adopted it for our Institution Decision. See Institution Dec. 12–13. For this Decision, we adopt the description of the person of ordinary skill articulated by Petitioner and used previously in our Institution Decision. In light of our review of the complete record, we find that this formulation is consistent with the ’202 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Baker I Decl. ¶¶ 28–32. Our Decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12
- Expert testimonyPetitioner expert discountedDecided for patent owner
“85:13–16. He admits that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. He points to no textbook or other independent evidence that would have led a person of ordinary skill to design such a detector. Our Trial Practice Guide cautions against crediting such unsupported testimony: The Board has broad discretion to assign weight to be accorded expert testimony. Yorkey v. Diab, 601 F.3d 1279, 1284 (Fed. Cir. 2010). However, the testimony must be based on sufficient facts and data. Fed. R. Evid. 702(b). “Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.” 37 C.F.R. § 42.65(a). Patent Trial and Appeal Board Consolidated Trial Practice Guide 35 (Nov. 2019).7 We therefore give Dr, Baker’s unsupported testimony on this issue little weight.” slip op. at 24
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“We construe claim terms only as relevant to the parties’ contentions and only to the extent necessary to resolve the issues in dispute. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017). Having considered the positions of the parties, we find that for the purpose of this decision, we do not need to construe these terms to resolve a dispute.” slip op. at 9
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“requirement.” Pet. Reply 5. We do not agree with Petitioner. We find that the language of the claims supports Patent Owner’s argument that the desired signal and the interferer signal are received together. As discussed infra, claim limitations 7.7 and 7.8 recite determining a signal strength of the interferer signal and determining a signal strength of the desired signal. These determinations must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. See Larson II Decl. ¶ 70; Baker II Decl. ¶¶ 48–49 (explaining that consideration of signal strengths detected at the same time would be “essential”). The specification of the ’202 patent further supports this finding: “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:22–24; see also Figs. 2A, 2B (showing interferer signals and desired signals together).” slip op. at 17
Patent outcomesUS 10,524,202 not shown unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites GrahamPatents in suitUS 10,524,202 - Intuit Inc. v. Samesurf, Inc.All claims unpatentablePTAB · Jun 25, 2024 · IPR2023-00339 · APJ Barbara A Benoit · IPR · Final written decision
Claims 1–18 are unpatentable as obvious over Lebrun and Wang; the Board did not reach the separate Prajapat and Wang challenge.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“of the parties, we found that a person of ordinary skill in the art (“POSITA”) “would have had (1) at least a bachelor’s degree in computer science, computer engineering, or electrical engineering, or a similar field, and (2) at least two years of work experience in software development and/or web-based software,” which reflected Petitioner’s proposal. Dec. 11–12; see Dec. 9–12 (discussing the respective proposals and level of ordinary skill reflected in the challenged patent and asserted prior art). Patent Owner accepts this level of ordinary skill in the art. PO Resp. 42. Accordingly, we apply this determination of the level of ordinary skill in the art for purposes of this Decision.” slip op. at 12
- Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed petitioner constructionDecided for petitioner
“information related to a shared web browsing interaction” is interchangeable with “web browsing interaction data” and, as a result, this portion of the specification should limit the claim term. PO Resp. 18–19 (quoting Ex. 2004 ¶ 40). The quoted portion of Mr. Friedman’s testimony, however, addresses other terms in the specification and not “information related to a shared web browsing interaction.” PO Resp. 18–19 (quoting Ex. 2004 ¶ 40). As such, the testimony cited by Patent Owner does not support Patent Owner’s position. Accordingly, we determine that the patentee has not acted as a lexicographer to set forth a definition of “web browsing interaction data” in the written description. c. Plain and Ordinary Meaning Because the patentee has not acted as a lexicographer to set forth a definition of “web browsing interaction data,” we look to the plain and ordinary meaning of the term. See Edwards Lifesciences LLC v. Cook Inc., from the ordinary meaning will be adopted “when the patentee acted as his own lexicographer and clearly set forth a definition of the disputed claim term in either the specification or prosecution history” (internal quotation marks omitted)); Pet. Reply 5 (Petitioner arguing that “web browsing interaction data” should be afforded its plain and ordinary meaning) (citing Ex. 1034 ¶ 13). Notably, both Dr. Lieberman and Mr. Friedman agree that the plain and ordinary meaning of “web browsing interaction data” is sufficient to inform how one of ordinary skill would have understood the term. Ex. 1034 ¶ 13 (Dr. Lieberman testifying: “The plain meaning of ‘web browsing interaction data’ is data related to web browsing interactions. No additional definition or limitation is required in my opinion, nor is there any special or specific meaning given to the term in the specification of the ’145 patent.”); Ex. 1033, 171:5–16 (Patent Owner’s expert, Mr. Friedman, testifying that “the plain and ordinary meaning is sufficient.”). According to Petitioner, the plain and ordinary meaning is “data related to web browsing interactions.” Pet. Reply 5 (citing Ex. 1034 ¶ 13); Ex. 1034 ¶ 13 (“The plain meaning of ‘web browsing interaction data’ is data related to web browsing interactions.”). Patent Owner’s expert declined to opine on what the plain and ordinary meaning of “web browsing interaction data” other than it excludes webpages and partially filled webpages related to a web browsing interaction. See Ex. 1033, 171:5–16. slip op. at 27
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner
“Accordingly, we conclude that the plain language of the claims does not require “web browsing interaction data” to be limited to data describing interaction performed on a website by a host device. We turn to the specification because the meaning of “web browsing interaction data” is informed “not only in the context of the particular claim in which the disputed term appears, but in the context of the entire patent, including the specification.” Phillips, 415 F.3d at 1313. The written description does not provide a definition or clear meaning for “web browsing interaction data.” Patent Owner acknowledges the term is not expressly used in the written description. PO Resp. 17. Patent Owner, however, identifies “information related to a shared web browsing interaction” as a term that is interchangeable with “web browsing interaction data.” PO Resp. 18, 29. We recognize the specification term “information related to a shared web browsing interaction” is substantially similar10 to Petitioner’s proposed plain and ordinary meaning of “web browsing interaction data” as “data related to web browsing interactions.” 11 Patent Owner identifies three passages that each describe the present invention as receiving information related to a shared web browsing interaction performed by a host device and performing the shared web browsing interaction based on the received information. PO Resp. 17–18 (block quoting Ex. 1001, Abstract, 3:10–24). The identified passages, however, do not show intention to manifestly limit “web browsing interaction data” to data describing interactions” slip op. at 25
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable
“forth by Petitioner (Pet. 22–34) discloses or suggests all limitations recited by claim 1, we consider Petitioner’s conclusion that it would have been obvious to combine Lebrun and Wang in the manner proposed to arrive at the claimed invention. See Pet. 19–22. (i) Articulated Reasoning To demonstrate obviousness, “there must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” KSR, 550 U.S. at 418. Petitioner contends that one of ordinary skill would have been motivated to combine Wang’s activating a session invitation with Lebrun’s invitation to join a group-surfing session. Pet. 28. Specifically, Petitioner contends that “activating an invitation via a designated URL address would further enable” Lebrun’s group-surfing server “to coordinate and manage the group-surfing session, which would further Lebrun’s objective of providing an ‘improved technique for group access to web sites.’” Pet. 28 (citing Ex. 1005, 7:1). We agree with Petitioner that activating an invitation via a designated URL address would be a technique that helps coordinate a group-surfing session and would enable multiple related users being able to access “substantially the same” slip op. at 63
Patent outcomesUS 9,185,145 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,185,145
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.