  • PTAB · Nov 22, 2024 · IPR2024-00825 · APJ Andrew L Nalven · IPR · Institution

    The Board denied institution because the petition did not show a reasonable likelihood of proving any challenged claim unpatentable under the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Pursuant to 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons that follow, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing in demonstrating the unpatentability of at least one of the challenged claims. Accordingly, we decline to institute an inter partes review.” slip op. at 2

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner

      “Step 1 of Figure 7 begins by obtaining the geographic information of the area to search for possible remote targets. Id. at 8:57–59. In step 2, the next geographic region where a possible search for a PRU is estimated. Id. at 8:64–66. In step 3, a page is sent out to that geographic region for remote units in the region to reveal their location. Id. at 9:2–4. In steps 4 and 5, if remote units are identified in the paged area, that information is forwarded to the network and the process continues to step 7 where the process is aborted. Id. at 9:4–6. Step 6 is performed if no units are identified in the paged area. Id. at 9:6–9. There, a check is done to establish if there are any remaining cells or grids higher up in the chain to be searched, and if so, the process returns to step 2 to search additional geographic areas. Id. at 9:9–12. The iterative process described in Figure 7 is consistent with Patent Owner’s proposed construction requiring forwarding a notification to only one or more PRUs currently located in a specific geographic boundary. Ex. 2001 ¶ 55; see also Ex. 1001, 8:32–54 (describing a grid search technique that may be implemented by the process of Figure 7).” slip op. at 13

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “(“POSITA”) would have had “a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent.” Pet. 8 (citing Ex. 1002 ¶¶ 28–30). Patent Owner does not dispute Petitioner’s proffered definition as to the level of ordinary skill in the art. Prelim. Resp. 6. For purposes of this Decision, we adopt Petitioner’s assessment, which is consistent with the level of skill reflected in the Specification and asserted prior art.” slip op. at 16

    • Expert testimonyPatent owner expert creditedDecided for patent owner

      “We are further not persuaded by Petitioner’s argument that forwarding notifications to the PRUs only within a specified geographic region renders element 12[D]’s step of verifying whether the PRUs exists within said region unnecessary. Pet. 35 n.8. Rather, we credit Mr. McAlexander who testifies that forwarding notifications to individually pollable geographic boundaries “does not obviate the need for the PRU to identify that the notification has been received or verify its location within the individual geographic boundary before responding.” Ex. 2001 ¶ 155.” slip op. at 15

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,199,726
  • PTAB · Nov 22, 2024 · IPR2024-00827 · APJ Thomas L Giannetti · IPR · Institution

    Institution was denied because Petitioner did not show a reasonable likelihood of proving claims 1, 2, 15, or 22 unpatentable on any asserted obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 6 (citing Andrews Decl. ¶ 25). At this stage, Patent Owner does not dispute this contention. Prelim. Resp. 5. For the purpose of determining institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’918 patent specification and the asserted prior art.” slip op. at 20

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “means.” See Ex. 1001, 11:60–12:4, 12:6–8, 15:30–37. The use of the word “means” in a claim element creates a rebuttable presumption that 35 U.S.C. § 112 ¶ 63 applies. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). 3 Section 4(c) of the AIA re-designated 35 U.S.C. § 112, sixth paragraph, as 35 U.S.C. § 112(f). Because the ’918 patent has a filing date before the We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 1, 2, and 22. See Pet. 7–12; Prelim. Resp. 9–21. slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “Having reviewed Patent Owner’s position on claim limitation 1[C], we determine that we do not need to expressly construe this claim term to effective date of the relevant amendment, we refer to the pre-AIA version of § 112. Owner acknowledges that the asserted network “includes control units programmed to obtain the locations of the offender and victim devices,” and does not base its arguments on the construction of this limitation. Id. at 42.” slip op. at 11

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,756,918
  • PTAB · Nov 22, 2024 · IPR2024-00826 · APJ Thomas L Giannetti · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving any challenged claim unpatentable on the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 8 (citing Andrews Decl. ¶¶ 25–26). Patent Owner does not dispute this contention or offer an alternative formulation. See Prelim. Resp. 6. For the purpose of institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’752 patent specification and the asserted prior art.” slip op. at 19

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “1. Means-Plus-Function Terms Challenged claims 14 and 15 recite elements using the word “means.” See Ex. 1001, 13:6–18, 13:20–22. The use of the word “means” in a claim ’752 patent has a filing date prior to the effective date of the applicable AIA amendment, we refer to the pre-AIA version of §103. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). Construing a means-plus-function claim term is a two-step process. We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 14 and 15. See Pet. 8–12; Prelim. Resp. 11–19.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner

      “geographic region.” The ’752 patent describes polling specific sub-regions of the network for a PRU. Ex. 1001, 2:12–15, 7:22–34. As Mr. McAlexander testifies, “[a] PRU may choose to instruct the network to relay certain information to mobile units in a specific geographic region. That information would then be appended to the geographic boundary information and beamed in the specified geographic region.” McAlexander Decl. ¶ 49 (quoting Ex. 1001, 10:19–23) (alteration in original). For example, a nearby boundary can be polled for the locations of nearby wireless customers within proximity of a distressed wireless customer. As described in the ’752 patent, a distressed mobile user M1 may need to find where another party might exist in that geographic region. The user could initiate a page from their PRU for the closest available PRUs that could be found in that geographic jurisdiction. Looking at FIG. 3, mobile user M1 will provide its location, latitude and longitude (x0,y0) to the closest available ground station serving area C1 or grid G1. As stated earlier, appropriate terrestrial technology will be scattered in that region to serve the PRUs in that area as shown in FIG. 1. Once a ground station picks up this signal, it sends a page for all location reporting devices in the specified boundary surrounding mobile unit M1, FIG. 3 to disclose their location. Ex. 1001, 7:22–34 (emphasis added). slip op. at 18

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,441,752
  • PTAB · Nov 5, 2024 · IPR2024-00802 · APJ Bach V Hoang · IPR · Institution

    The Board denied institution because Petitioner failed to show a reasonable likelihood that any of claims 1–20 would be unpatentable on any asserted obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “An inter partes review may not be instituted unless “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Having reviewed the parties’ papers and the evidence of record, we determine that Petitioner has not shown a reasonable likelihood it would prevail in establishing the unpatentability of any of the challenged claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner asserts that “a person having ordinary skill in the art (‘POSITA’) at the relevant time, would have had at least a bachelor’s degree in electrical engineering, or equivalent experience of at least two years working in the field of the design electrical driver systems for Light Emitting Diodes (LEDs).” Pet. 20. Patent Owner has not addressed the level of ordinary skill in the art. See generally Prelim. Resp. For purposes of this Decision, we adopt Petitioner’s proposed level of ordinary skill, as articulated above. We determine this level of skill comports with the qualifications a person would have needed to understand and implement the teachings of the ʼ432 Patent and the prior art of record. Cf. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (noting that the prior art itself may reflect an appropriate level of skill in the art). We note, however, that the open-ended language “at least” expands the range of education and experience indefinitely with no upper bound. Therefore, we do not adopt this aspect of Petitioner’s formulation.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Based on the record before us, we do not find it necessary to expressly construe any claim terms or phrases to reach our decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (per curiam) (claim terms need to be construed “only to the extent necessary to resolve the controversy” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). Petitioner’s constructions do not affect our determinations, and, even under Petitioner’s constructions, Petitioner fails to show a reasonable likelihood of success with respect to its proposed grounds of unpatentability for the challenged claims of the ’432 Patent.” slip op. at 10

    • BurdenNot shown unpatentable

      “First, even under Petitioner’s assertion that “controller RG . . . performs the functions of an error amplifier and amplifier output stage” (id. at 37), Petitioner has not adequately shown that controller RG meets all three of “an error amplifier,” “a control voltage,” and “an amplifier output stage.” Petitioner’s assertions that those elements are “interior to” or “include[d]” in controller RG are conclusory and unsupported. Petitioner summarizes and reproduces portions of Sudhaus regarding the output currents of controller RG, but has not explained the relevance of its summary and reproduction with respect to each recited claim element. See id. at 37–38 (citing Ex. 1005, 2:32–33, 4:25–28, 4:46–50, 8:47–55), 40– 41. Nor has Petitioner explained why or how the summarized or reproduced portions of Sudhaus show that those claim elements are interior or included in controller RG. See id. Further, Petitioner also fails to show how Sudhaus teaches the claimed interactions and relations between the error amplifier, control voltage, and amplifier output stage. The claim recites the error amplifier compares voltages to “generate a control voltage” and the amplifier output stage controls output current “based on the control voltage.” Petitioner has not explained what specific signal controller RG generates that teaches a “control voltage” used to control output current. Nor has Petitioner stated, let alone explained how, controller RG generates a control voltage in the claimed manner and controls output current based on that control voltage. Simply because controller RG produces outputs that are allegedly similar to the claimed outputs does not by itself show that controller RG produces the claimed outputs using the claimed elements in the claimed manner.” slip op. at 16

    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR
    Patents in suitUS 11,653,432
  • PTAB · Nov 1, 2024 · IPR2024-00850 · APJ Josiah C Cocks · IPR · Institution

    The Board instituted IPR on claims 1, 3–12, 14, and 23–27 because Petitioner showed a reasonable likelihood of proving them obvious over Raizer and Hangzhou.

    RulingsInstitution decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “A person of ordinary skill in the art (“POSITA”) at the time of the alleged invention of the ’632 Patent would have been a person with a working knowledge of mechanical design and automation. That person would have had a Bachelor of Science degree in an academic discipline emphasizing the design of mechanical, automation, and robotics technologies, in combination with training or at least one to two years of related work experience. Alternatively, that person could have also had a Master of Science degree in a relevant academic discipline with less than a year of related work experience in the same discipline. (Ex. 1003, ¶¶42-43). More education can supplement practical experience and vice versa (Ex. 1003, ¶¶42-43).” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “Neither Petitioner nor Patent Owner contends that any claim term has a meaning other than its ordinary and customary meaning. See, e.g., Pet. 4; Prelim. Resp. 8. Having considered the record, we determine that no express claim construction is necessary for any claim term. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (holding that only claim terms in controversy need to be construed, and only to the extent necessary to resolve the controversy (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 11

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “reasons why a skilled artisan would have sought to combine the teachings of Raizer and Hangzhou. See supra § IID.3. On this record, and for purposes of institution, we find those contentions persuasive. For example, as Petitioner observes (see, e.g., Pet. 7), and which is not disputed by Patent Owner, Hangzhou sets forth that, in the area of automating warehouses, it is a known and recognized practice to provide pathways (e.g., auto-guided trolley passage spaces 112) underneath shelving units for movement of automated trolleys or robots. See, e.g., Ex. 1006 ¶ 48 (“an auto-guided trolley 200 preferentially travels in column laneways 32 and in auto-guided trolley passage spaces 112”); Fig. 2. Patent Owner also does not meaningfully dispute Dr. Derby’s testimony that “[i]t was well known to elevate the shelving units above the floor so that robots loaded with containers can travel underneath thereby allowing for more flexible route planning and the elimination of bottlenecks.” See Ex. 1003 ¶ 107; see also id at Section VI., ¶¶ 45–53 (describing in detail, with citation to record evidence, that one of ordinary skill in the art understood that shelving units could be elevated above warehouse floors).” slip op. at 27

    • Other 314aInstitution denied discretionary otherDenied

      “PETITION UNDER 35 U.S.C. § 314 IS WARRANTED Patent Owner requests that we exercise our discretion to deny institution under 35 U.S.C. § 314. See Prelim. Resp. 34–36. The principle basis for that request is that the panel should accept Patent Owner’s arguments as to insufficient reason or motivation to combine the teachings of Raizer and Hangzhou, and exercise discretion to deny on that basis. See id. at 34. As set forth above, however, on this record we conclude that Petitioner has shown a reasonable likelihood in its challenge to all the challenged claims.” slip op. at 30

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · Graham
    Patents in suitUS 11,472,632
  • PTAB · Oct 29, 2024 · IPR2023-00643 · APJ Matthew S Meyers · IPR · Final written decision

    Claims 1–7 are unpatentable as obvious over Willner and Park; the Board did not reach the other instituted grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “The main distinction between Petitioner’s ordinarily skilled artisan and Patent Owner’s is that Patent Owner’s definition requires “a mechanical engineering degree” whereas Petitioner’s definition allows for a degree in “mechanical, electrical, or computer engineering.” See Pet. Reply 16 (citing Pet. 13). However, Mr. Kitchen states that he qualifies as one of ordinary skill in the art based on Patent Owner’s proffered definition “even without an undergraduate degree in mechanical engineering” because he has “over 40 years of experience in the design and development of interactive products, including specifically with respect to handheld gaming devices.” Ex. 1033 ¶ 7 (citing Ex. 1002 ¶¶ 24–30). Mr. Kitchen asserts that his experience is in “the same category of products claimed in the ’393 patent and described in the prior art references at issue in this proceeding.” Id. In view of this and based on the complete record before us, we view the parties’ proposals as substantially the same because Petitioner’s proposed definition includes the requisite education Patent Owner’s definition requires. Thus, we find (as we did in the Institution Decision) that Petitioner’s level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’393 patent and the prior art of record. See Inst. Dec. 20–21 (citing Okajima, 261 F.3d at 1355). More particularly, we do not agree with Patent Owner that the education component for the level of ordinary skill in the art for computing gaming devices would be limited to just mechanical engineering. We note that, based on the record and evidence before us, our decision and analysis would be the same applying either party’s definition of a person of ordinary skill in the art.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “After reviewing the full record, we determine that it is unnecessary to construe the term “confinement structures,” as it appears in the limitation “a pair of confinement structures” to reach a determination in this proceeding. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). However, we will address the parties’ dispute regarding whether the prior art discloses or teaches physical component(s) that hold(s) a computing device within our merits analysis below. The parties do not dispute the construction of any other claim terms and we find that no other terms require express construction to resolve the controversy between the parties. Accordingly, we do not construe any other claim terms expressly. See Realtime Data, 912 F.3d at 1375 (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., 200 F.3d at 803).” slip op. at 12

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundUnpatentable

      “First, the test for obviousness “is not whether the features of a secondary reference may be bodily incorporated into the structure of the primary reference, . . . but rather whether ‘a skilled artisan would have been motivated to combine the teachings of the prior art references to achieve the claimed invention.’” Allied Erecting & Dismantling Co. v. Genesis Attachments, LLC, 825 F.3d 1373, 1381 (Fed. Cir. 2016); see also Pet. Reply 11–12 (arguing the same). Second, we disagree with Patent Owner’s assertion that the proposed combination would fail “to retain[] computing device 10 in position during normal user operation” because Park’s adjustable bridge “configuration does not allow mobile phone (1) to be seated for stability in the device.” PO Resp. 20 (citing Ex. 1004 ¶ 42; Ex. 2004 ¶ 68). At the outset, we note that Patent Owner’s argument mischaracterizes the disclosure of Park. Instead, we find Park discloses that a “basic configuration of [Park’s] game pad device for a mobile phone according to the present invention” “sufficiently allows mobile phone (1) to be mounted on the device according to the present invention and used.” Ex. 1004 ¶¶ 25, 41. Although Park discloses that “mobile phone (1) may come loose during gaming or become detached in severe cases” (id. ¶ 41), we do not view this disclosure to otherwise negate Park’s teaching that its adjustable bridge (30,40) “sufficiently allows mobile phone (1) to be mounted on the device according to the present invention and used.” Id. We credit Mr. Kitchen’s declaration testimony to that effect. See Ex. 1033 ¶ 47 (declaring that one of ordinary skill in the art would have “understood this disclosure to mean that a computing device (mobile phone) would have been secured by the device for normal use . . . as part of a handheld gaming device.”).” slip op. at 24

    • Expert testimonyPetitioner expert creditedPatent owner expert discountedDecided for petitioner

      “We agree with Petitioner and find more credible Mr. Kitchen’s opinion regarding “normal user operation.” In doing so, we credit Mr. Kitchen’s opinion that Willner’s sidewalls would “function to secure the sides of the computing device and hold it in place” and, “[i]n the combination, Park’s bridge would be adjusted to reduce the length of the bridge and thereby ‘mount’ a computing device by having Willner’s side walls (confinement structures) ‘apply pressure’ to opposing sides of the computing device.” Ex. 1002 ¶¶ 154–156 (citing Ex. 1004 ¶¶ 38–41). We note that the ’393 patent operates in a similar manner using a sufficient compressive load to hold a computing device. More particularly, the ’393 patent discloses that [t]he expansion and contraction of the distance between the pair of confinement structures 316, facilitates placement of the computing device 302 between the pair of confinement structures 316, the application of sufficient compressive load being placed on the computing device 302 to securely hold the computing device between the pair of confinement structures 316. Ex. 1001, 10:11–20. Thus, we find Mr. Kitchen’s opinion credible and supported by the complete record. Accordingly, we find that Petitioner has proven, by a preponderance of the evidence, that the combination of Willner and Park teaches or suggests “a pair of confinement structures,” as recited by limitation 1[b][1].” slip op. at 22

    Patent outcomesUS 10,391,393 unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,391,393
  • PTAB · Oct 23, 2024 · IPR2024-00823 · APJ Carl W Whitehead Jr · IPR · Institution

    Instituted IPR on claims 1–8 and 13–22 over Bigbee and Nguyen, finding a reasonable likelihood of obviousness, and granted Valeo’s motion to join IPR2023-01373.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Having considered the arguments presented in the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has demonstrated a reasonable likelihood of success in proving that at least one claim of the ’958 patent is unpatentable as obvious over the combination of Bigbee and Nguyen. Accordingly, we institute an inter partes review of all challenged claims (i.e., claims 1–8 and 13–22) on all grounds set forth in the Petition. Our determinations at this stage of the proceeding are based on the evidentiary record currently before us. This decision to institute trial is not a final decision as to the patentability of any claim for which we have instituted an inter partes review. See TriVascular, Inc. v. Samuels, 812 F.3d 1056, 1068 (Fed. Cir. 2016) (noting that “there is a significant difference between a Petitioner’s burden to establish a ‘reasonable likelihood of” slip op. at 12

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner asserts: A person of ordinary skill in the art of the subject matter of the ’958 patent would have the equivalent of a bachelor’s degree in Computer Science, Computer Engineering (or a related field) and approximately two years of work experience with computer architecture design. Additional education in the field could be substituted for industry experience, and vice versa. See Prelim. Resp. 3. The parties’ positions appear to be more or less the same. Based on the current record, we adopt Petitioner’s proposed level of ordinary skill in the art for purposes of this Decision, as it is consistent with the level of ordinary skill in the art reflected by the prior art of record. We note that our Decision would be the same under either party’s proposed construction.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “At this stage of the proceeding, only terms that are in controversy need to be construed, and then only to the extent necessary to determine whether to institute inter partes review. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F. 3d 795, 803 (Fed. Cir. 1999))). After reviewing the parties’ evidence and contentions, we do not observe a dispute over the meaning of these terms that is necessary to resolve at this stage. Accordingly, we determine that we do not need to expressly construe any term for purposes of this Decision.” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “Based on our review and consideration of the current record, we determine that Petitioner has sufficiently shown that the combination of Bigbee and Nguyen teaches the recited elements of limitation 19a for purposes of institution and has provided reasons sufficiently supported by factual underpinnings to combine the references with a reasonable expectation of success. Nguyen discloses, “[t]he present invention addresses mechanisms for combining recoverable and non-recoverable error handling mechanisms efficiently in FRC-enabled processors.” Ex. 1006 ¶ 9. Subsequently, Nguyen distinguishes recoverable from non-recoverable errors by treating non-recoverable errors differently from recoverable errors. Nguyen discloses, “If an error reaches error detector 140 from either core 120, recovery module 150 is activated to implement a recovery routine. Recovery can be implemented with relatively low latency by hardware, software, firmware or some combination of these.” Id. ¶ 22, Fig. 1. “However, an FRC error will be triggered if the corrupted data from one execution core and an uncorrupted version of the data from the other execution are allowed to reach FRC checker 130 before recovery module 150 is activated.” Id. Nguyen recognizes, “[s]ince FRC errors are not recoverable, reset module 160 resets the system, if FRC checker 130 signals an FRC error before the underlying parity/ECC error is detected.” Id. Nguyen further recognizes that, “[n]ot all FRC-errors are traceable to underlying parity/ECC or other correctible soft errors. For those that are, it is faster for error detector 140 to address the under lying soft error than for FRC-checker to address the FRC error that results when the corrupted data reaches FRC boundary 104.” Id. ¶ 23 (emphasis added). In this instance instead of the FRC-error being processed by the FRC checker 130 and the Reset module 160, the FRC error is directed to the Error detector 140 and eventually recovery module 150. See id. at Fig. 1. Nguyen also discloses, “the recovery routine triggered by error detector 140 provides greater system availability than the reset routine triggered by FRC checker 130” and “[e]xpanding the FRC boundary thus increases both the amount of logic that is duplicated for execution cores 120 and the flight time, during which detectable errors may be identified.” Id. ¶ 30, Fig 1; see Pet. 37. Nguyen further discloses, “[t]he former increases FRC protection, albeit through a reset mechanism” as shown in Figure 1, elements FRC Checker 130 and Reset Module 160. Ex. 1006 ¶ 30. “The latter increases the likelihood that errors identifiable through parity, ECC [error correction code] or similar core-specific protections are handled through recovery rather than reset” as shown in Figure 1, elements Error Detector, 140 and Recovery Module 150. Id. Additionally, Nguyen’s Figure 7, as discussed above, “is a block” slip op. at 33

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,502,958
  • PTAB · Oct 16, 2024 · IPR2023-00697 · APJ Barbara A Benoit · IPR · Final written decision

    Claims 1, 3, 4, and 8 were not proven unpatentable: Rauhala does not disclose the required simultaneous signal-strength determinations, and Masaaki does not cure the deficiency for claim 4.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Following institution, Patent Owner maintained the same level of ordinary skill proposed in its preliminary response and did not address our discussion of the level of ordinary skill in the art in the Institution Decision. PO Resp. 24–25; see also Prelim. Resp. 24. For the reasons discussed in the Institution Decision, we adopt and apply for this Decision the level of ordinary skill articulated by Petitioner and used previously in our Institution Decision. See Dec. 8–10. In light of our review of the complete record, we find that this formulation is consistent with the ’825 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Ex. 1002 ¶¶ 27– 31. Our decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “We agree with Patent Owner that the desired signal and interferer signal must be received at the same time. The plain language of the claim requires the wireless transceiver to “receiv[e] a wireless signal having a desired signal and an interferer signal,” the determining of a signal strength of the interferer signal and the determining of a signal strength of the desired signal must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. The specification supports this understanding. “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:20–22; see also id. at 5:31–33 (“FIGS. 2A and 2B illustrate examples of desired signals, interferers, and noise that may be received by one of the various circuits in a” slip op. at 21

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that Rauhala does not state that the signal strengths are measured simultaneously or at the same time. Indeed, as discussed above, Rauhala indicates unequivocally in the same paragraph the opposite—that detector DET provides to control unit 42 “an indication about either the receive channel signal strength RSS or the strength of any signal on the reception band.” Ex. 1004 ¶ 17. Rauhala describes that “control unit 42 provides two one-bit control signals cA and cM” based on indications received from detector DET. Id. Importantly, Rauhala indicates that “at the same time as” describes how the control unit 42 uses the received inputs RSS and RSSn shown in Figure 4, which are described earlier in paragraph 17 as indications of either RSS or RSSn from detector DET. Id. (“Signal cA is 0 when signal RSS is greater than S4 and signal RSSn is at the 11 Dr. Baker’s reply declaration correctly quotes Rauhala paragraph 17 but cites to paragraph 18. We deem this harmless error. same time smaller than Sn. . . . Signal cM is 1 when signal RSS is not greater than S4 and signal RSSn is at the same time at least Sn. Otherwise, signal cM is 0.”). The burden remains on Petitioner to demonstrate by a preponderance of the evidence that Rauhala discloses the disputed limitations as arranged or combined in the claim. Petitioner does not persuasively reconcile these “either/or” statements regarding the functioning of detector DET with the “at the same time as” statements regarding control signals output by control unit 42 in paragraph 17. We do not find persuasive Petitioner counsel’s position expressed at the hearing that Rauhala’s “either/or” statements are “simply an imprecise description” (Tr. 16:22–24). We do not see a lack of precision in Rauhala’s “either/or” statements.” slip op. at 30

    • Expert testimonyPetitioner expert discountedPatent owner expert creditedDecided for patent owner

      “When asked at his deposition to explain Rauhala’s use of the word “or” regarding the functioning of detector DET, Dr. Baker asserted that “[detectors] can be designed to determine RSS or RSSn.” Ex. 2016, 85:5– 12. We find Dr. Baker’s testimony that “it’s reasonable that if you can design . . . the detector to detect one or the other, you can also design it to detect both” to be without factual support. Id. at 85:13–16. He points to no textbook or other independent evidence to support that would have led one of ordinary skill to design such a detector or to support that one of ordinary skill would have understood Rauhala’s detector to be so designed. Furthermore, Dr. Baker recognizes that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. We give little weight to Dr. Baker’s unsupported testimony that one could design a detector to detect both RSS and RSSn from the same wireless signal. See 37 C.F.R. 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”); see also Xerox Corp. v. Bytemark, Inc., No. IPR2022-00624, 2022 WL 3648989, at *6 (PTAB 2022) (precedential) (Director affirming because “the cited declaration testimony is conclusory and unsupported, adds little to the conclusory assertion for which it is offered to support, and is entitled to little weight”).” slip op. at 31

    Patent outcomesUS 10,129,825 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,129,825
  • PTAB · Oct 16, 2024 · IPR2023-00698 · APJ Thomas L Giannetti · IPR · Final written decision

    Claims 7–11, 13, and 19–21 were not shown unpatentable because Rauhala does not disclose simultaneous desired and interferer signal-strength determinations, defeating anticipation and the obviousness combination.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “The two proposals are materially similar in the education requirement, but differ marginally in professional experience required (three versus five years). See supra. While we were persuaded, on the preliminary record, that both Petitioner’s and Patent Owner’s proposals were consistent with the problems and solutions in the ’202 patent and the prior art of record, on balance, we determined that Petitioner’s proposal was a better reflection of the level of skill in the prior art, and we therefore adopted it for our Institution Decision. See Institution Dec. 12–13. For this Decision, we adopt the description of the person of ordinary skill articulated by Petitioner and used previously in our Institution Decision. In light of our review of the complete record, we find that this formulation is consistent with the ’202 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Baker I Decl. ¶¶ 28–32. Our Decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “85:13–16. He admits that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. He points to no textbook or other independent evidence that would have led a person of ordinary skill to design such a detector. Our Trial Practice Guide cautions against crediting such unsupported testimony: The Board has broad discretion to assign weight to be accorded expert testimony. Yorkey v. Diab, 601 F.3d 1279, 1284 (Fed. Cir. 2010). However, the testimony must be based on sufficient facts and data. Fed. R. Evid. 702(b). “Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.” 37 C.F.R. § 42.65(a). Patent Trial and Appeal Board Consolidated Trial Practice Guide 35 (Nov. 2019).7 We therefore give Dr, Baker’s unsupported testimony on this issue little weight.” slip op. at 24

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We construe claim terms only as relevant to the parties’ contentions and only to the extent necessary to resolve the issues in dispute. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017). Having considered the positions of the parties, we find that for the purpose of this decision, we do not need to construe these terms to resolve a dispute.” slip op. at 9

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “requirement.” Pet. Reply 5. We do not agree with Petitioner. We find that the language of the claims supports Patent Owner’s argument that the desired signal and the interferer signal are received together. As discussed infra, claim limitations 7.7 and 7.8 recite determining a signal strength of the interferer signal and determining a signal strength of the desired signal. These determinations must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. See Larson II Decl. ¶ 70; Baker II Decl. ¶¶ 48–49 (explaining that consideration of signal strengths detected at the same time would be “essential”). The specification of the ’202 patent further supports this finding: “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:22–24; see also Figs. 2A, 2B (showing interferer signals and desired signals together).” slip op. at 17

    Patent outcomesUS 10,524,202 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 10,524,202
  • Masimo Corporation v. Apple Inc.No claims unpatentable
    PTAB · Oct 15, 2024 · IPR2023-00745 · APJ Robert L Kinder · IPR · Final written decision

    Claims 1–4 and 8–22 were not shown unpatentable because Mills did not disclose the required embedded structure and Markel combined with Mills did not teach it; the revised motion to amend was dismissed as moot.

    RulingsFinal written decision
    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached

      “Patent Owner’s Revised Contingent Motion to Amend asserts that in “the event the Board finds at least one challenged [Revised Motion to Amend] claim unpatentable, [Patent Owner] respectfully requests that the Board grant this Motion with respect to the corresponding proposed substitute claim(s).” Paper 27, 1. Because we determine that Petitioner has not established that any of the challenged claims 1–4 and 8–22 are unpatentable, Patent Owner’s Revised Contingent Motion to Amend is moot.” slip op. at 61

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner’s proposed level of ordinary skill in the art is somewhat broader in both education and proposed work experience. Patent Owner’s proposed work experience is somewhat vague and potentially outside the scope of the claimed invention. For example, the requirement that the person of ordinary skill in the art have experience with the “capture and processing of data or information, including but not limited to physiological information,” would seemingly encompass data processing areas that do not relate to the scope of the claimed invention. We adopt Petitioner’s level of the level of ordinary skill in art because it is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). Our analysis and the end result are the same under either proposed definition.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “structure where a lead is embedded in a portion of the enclosure from other embodiments where a lead is merely positioned against or in parallel contact with a portion of the enclosure. See Ex. 2003 ¶¶ 36–37. The Specification describes distinct embodiments such as “lead 472 of the heart sensor can be positioned against the back surface of bezel 460,” or “[a]lternatively, lead 472 can be placed within the thickness of bezel 460 (e.g., in a pocket within the bezel wall), but underneath the outer surface of the bezel.” Ex. 9:44–48. We agree with Patent Owner, and Dr. Kenny, that “[t]his passage distinguishes a lead that is embedded in a portion of the enclosure from a lead that is merely ‘positioned against’ or in parallel contact with a portion of the enclosure.” PO Resp. 6–7 (citing Ex. 2003 ¶¶ 33–35). See also Ex. 2008, 31:10–33:18, 109:18–110:19 (Petitioner’s expert, Mr. Oslan, suggesting that a first component or object in parallel contact with and positioned under a second component or object would not necessarily indicate that the first component or object is embedded in the second component or object). Similarly, we also agree that “the claims of the ’257 use the term ‘embedded in’ while also using the word ‘embedded’ in other contexts, which” indicates distinct claim scope for “the term ‘embedded in,’” versus “the broader term ‘embedded.’” Ex. 2003 ¶ 38. For instance, claim 9 distinctly requires “embedded with,” which is a broader term that, according to Dr. Kenny, encompasses embodiments where a lead may be adjacent/parallel to the first portion of the enclosure. Id.” slip op. at 18

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “under the exterior of the first portion” (see Pet. 21–22, 24–25; Pet. Reply 4); and (3) leaf spring 62 is embedded in housing 12 and electrode 14 (see Pet. 22–24). None of Petitioner’s mappings disclose every element of claim 1 and Petitioner improperly jumps between these various mappings without fully examining a single mapping for each and every limitation of claim 1. See Pet. 18–25. In essence, Petitioner invites the Board to piece together a single theory that meets all claim elements from these disparate theories that each require distinct structure within Mills. See Amazon.com, Inc., et al. v. Avago Technologies General IP (Singapore) PTE. LTD., IPR2017-01112, Paper 11, at 13 (PTAB Aug. 23, 2017) (“Petitioner is inviting us to assume the role of archeologist of the record, which invitation we decline.”).” slip op. at 36

    Patent outcomesUS 10,076,257 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,076,257

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.