- Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - PTAB · May 21, 2025 · IPR2025-00193 · APJ Sheridan K Snedden · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, or 30 were unpatentable on any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the evidence and arguments presented in the Petition, we determine that Petitioner has not demonstrated a reasonable likelihood of success in proving that at least 1 claim of the ’030 patent is unpatentable.” slip op. at 2
- BurdenNot shown unpatentable
“What is missing from Petitioner’s stated motivation for modifying the array of Cantor is a reason why a POSA would seek to correlate the identification sequence with a location on the array at all. Prelim. Resp. 72. Indeed, the location of a bead on the substrate is not pertinent to the analysis disclosed in Cantor. Ex. 2002 ¶ 172; see also id. at ¶ 31 (Cantor “does not relate to the [spatial] analysis of tissue samples . . . .”). “[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, and 30 would have been obvious over Cantor.” slip op. at 20
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner does not argue that any claim term requires construction. Pet. 22–23. Likewise, Patent Owner takes the position that “no claim terms 2 Person of ordinary skill in the art. require explicit construction” for purposes of determining whether to institute inter partes review. Prelim. Resp. 19. Having considered the parties’ positions and evidence of record, we determine that no express construction of any claim term is necessary to determine whether to institute inter partes review. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 8
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable
“What is missing from Petitioner’s stated motivation for modifying the array of Cantor is a reason why a POSA would seek to correlate the identification sequence with a location on the array at all. Prelim. Resp. 72. Indeed, the location of a bead on the substrate is not pertinent to the analysis disclosed in Cantor. Ex. 2002 ¶ 172; see also id. at ¶ 31 (Cantor “does not relate to the [spatial] analysis of tissue samples . . . .”). “[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, and 30 would have been obvious over Cantor.” slip op. at 20
Claim construction§ 102 anticipation§ 103 obviousnessPatents in suitUS 11,761,030 - PTAB · May 21, 2025 · IPR2025-00192 · APJ Sheridan K Snedden · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1, 5, 17, 20, 23, 28, or 29 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the evidence and arguments presented in the Petition, we determine that Petitioner has not demonstrated a reasonable likelihood of success in proving that at least 1 claim of the ’138 patent is unpatentable.” slip op. at 2
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentableNot shown unpatentable
“[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 5, 17, 20, 23, 28, and 29 would have been obvious over Cantor. slip op. at 21
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedDecided for patent owner
“3. Discussion Petitioner challenges whether certain elements of independent claims 1 and 17 are supported by the ’124 provisional and/or whether the ’138 patent’s priority chain is intact. Pet. 52–60. Having considered the parties’ positions and evidence of record, however, we agree with Patent Owner’s written description analysis, summarized above, and find (1) that the ’124 Provisional provides adequate written description support for each of the challenged claim elements; (2) that the ’138 patent’s priority chain is intact; and (3) that the ’138 patent is therefore entitled to the priority date of April 5, 2010. Consequently, Frisen is not prior art to the challenged claims.” slip op. at 28
- Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference not prior artDecided for patent owner
“3. Discussion Petitioner challenges whether certain elements of independent claims 1 and 17 are supported by the ’124 provisional and/or whether the ’138 patent’s priority chain is intact. Pet. 52–60. Having considered the parties’ positions and evidence of record, however, we agree with Patent Owner’s written description analysis, summarized above, and find (1) that the ’124 Provisional provides adequate written description support for each of the challenged claim elements; (2) that the ’138 patent’s priority chain is intact; and (3) that the ’138 patent is therefore entitled to the priority date of April 5, 2010. Consequently, Frisen is not prior art to the challenged claims.” slip op. at 28
Claim construction§ 102 anticipation§ 103 obviousnessPatents in suitUS 11,549,138 - SML Intelligent Inventory Solutions LLC / SML (USA) Inc. v. Adasa Inc.Institution deniedPTAB · May 20, 2025 · IPR2025-00125 · APJ Devon Zastrow Newman · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that any challenged claim was unpatentable under the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2019). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that Petitioner has not established a reasonable likelihood of prevailing on its assertion that at least one challenged claim is unpatentable based on the grounds advanced here. Accordingly, we deny institution of inter partes review of claims 1–20 of the ’967 patent.” slip op. at 2
- Skill levelSkill level petitioner adoptedOther
“VSI Int’l Inc., 174 F.3d 1308, 1324 (Fed. Cir. 1999) (citing Graham v. John Deere Co., 383 U.S. 1, 17–18 (1966); Ryko Mfg. Co. v. Nu-Star, Inc., 950 F.2d 714, 718 (Fed. Cir. 1991)). Petitioner adopts the following definition of a person of ordinarily skill in the art (hereafter, sometimes “POSITA”) of the ’967 patent proposed by Patent Owner in the Avery Dennison litigation: [A]t least a bachelor’s degree in electrical engineering, computer science, or computer engineering, or a related discipline, and at least five years of experience which would consist of, A, designing, developing, evaluating and/or using RFID or other AIDC [automatic identification and data capture] technologies in inventory management, unique object identification, and/or security; or B, studying and conducting research related to RFID technologies and using RFID and other AIDC technologies in inventory management, unique object identification, and/or security. Pet. 6 (citing Ex. 1030, 707:3–13). Patent Owner does not offer a definition of an ordinarily skilled artisan of the ’967 patent at this time. See generally Prelim. Resp. Based on the information presented, we find that the asserted prior art itself is sufficient to demonstrate the level of skill in the art at the time of the invention. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself can reflect the appropriate level of ordinary skill in the art). To the extent a more precise definition is required, we apply Petitioner’s unopposed proposed definition for purposes of determining whether to institute review because it is consistent with the disclosures of the asserted prior art references and the problems addressed in the ’967 patent.” slip op. at 17
- Prior constructionPrior construction adoptedDecided for patent owner
“Petitioner proposes the following claim constructions: “an allocated block of serial numbers” as “a pre-authorized range of binary serial numbers” and “uniquely corresponding” as the “term’s plain and ordinary meaning, consistent with the articulation of the plain and ordinary meaning” in the Avery Dennison litigation. Pet. 8–12. As to the remaining claim terms, Petitioner applies the district court’s constructions in the Avery Dennison litigation. Id. at 12 (citing Ex. 1028). Patent Owner applies the following constructions that were entered during in the Avery Dennison litigation: “object class information space” as “data field within the memory of the RFID integrated circuit chip for information identifying the class of an object, such as a company prefix, item reference code, partition value, and/or filter value,” “unique serial number space” as “data field within the memory of the RFID integrated circuit for information identifying a unique serial number,” “being assigned a limited number of most significant bits” as “includes a limited, predefined sequence at the leading end,” “remaining bits of lesser significance” as “the remaining lower order bits at the trailing end,” “is encoded with one serial number instance” as “has stored within it one serial number instance,” “an allocated block of serial numbers” as “a pre-authorized range of serial numbers,” and “uniquely corresponding” as its plain and ordinary meaning. Prelim. Resp. 32. For purposes of resolving whether to institute trial, we adopt and apply the interpretations stated in the district court’s claim construction order and applied by the Federal Circuit on appeal, Ex. 1028.11 See 55 F.4th 900, 908–909, 912–913 (Fed. Cir. 2022) (citing the district court’s claim construction order).” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached
“IBM200 and Kuhno would have made it obvious for a POSITA to commission RFID tags with unique serial numbers partitioned into MSBs and bits of lesser significance. See Pet. 34–39; Ex. 1005 ¶¶ 167–176. However, on this record, Petitioner has not sufficiently shown that the POSITA, having read IBM200 and Kuhno, would have been led to create a serial number space in which the limited number of “most significant bits” uniquely corresponds to those bits assigned to an allocated block of serial numbers, as recited in limitation [f].” slip op. at 25
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,798,967 - Aardevo North America, LLC v. Agventure B.V.Institution deniedPTAB · May 1, 2025 · IPR2025-00136 · APJ Jeffrey N Fredman · IPR · Institution
Institution of inter partes review was denied for claims 1–10 because Petitioner did not establish a reasonable likelihood of prevailing on any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Accordingly, we find that on the current record Petitioner has not shown that it has a reasonable likelihood that it would prevail on these obviousness grounds. XII. DISCRETIONARY DENIAL – 35 U.S.C. § 325(d) In view of our determination that the Petitioner does not meet the threshold for instituting review on the merits, we need not address the parties’ dispute about whether the Board should exercise its discretion to deny institution under 35 U.S.C. § 325(d). Pet. 74–75; Prelim. Resp. 38–54; Pet. Reply 1–5; PO Sur-Reply 1–5. XIII. CONCLUSION After reviewing the information presented in the Petition and the Preliminary Response, we determine that, based on the evidence of record, Petitioner has not established a reasonable likelihood that claims 1–10 of the ’841 patent are unpatentable. XIV. ORDER Accordingly, it is ORDERED that, pursuant to 35 U.S.C. § 314(a), institution of an inter partes review of all challenged claims on all grounds presented in the Petition is denied.” slip op. at 35
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element) › Inherent disclosureNot shown unpatentableInherency not foundNot shown unpatentable
“However, neither Petitioner nor Dr. Jansky provide specific data on the record before us showing the actual measured homozygosity of either of the inbred lines, US-W 5309 and US-W 5315. And Phumichai experimentally demonstrates that Dr. Jansky’s assumption that theoretical heterozygosity reduction of 50% per generation is not necessarily accurate, stating the “observed average percentage of reduction of heterozygosity per generation (38.4% or 38.5%) was lower than the theoretically expected value of 50%.” Ex. 1005, 982. Indeed, Phumichai disclosed that the “SOPH [Section-based observed percentage of heterozygosity] decreased steadily from the original 100% in 99H2–1 (S0) to the family means of 62.4% in 3H2 (S1), 37.9% in 3H3 (S2).” Id. at 981. That is, Phumichai experimentally shows that in an S2 generation of a potato line, the heterozygosity was 37.9%, resulting in homozygosity of about 62.1%, below the 75% theoretically expected and the 75% required by claim 1 of the ’841 patent. Therefore, the evidence of record does not show that the S2 generation of potato lines in Jong necessarily satisfies the homozygosity recitation in claim 1 of the ’841 patent, and so cannot establish on the record before us that Jong inherently teaches this limitation.” slip op. at 15
- Obviousness (§103) › Objective indicia / secondary considerationsObjective indicia outweighedNot shown unpatentableNot shown unpatentable
“Owner is telling. Petitioner does not refute Patent Owner’s evidence of objective indicia. On the current record, the objective indicia evidence is compelling. As to long felt need, Patent Owner cited evidence on record before the Examiner that showed a persistent need recognized by ordinarily skilled artisans. In re Gershon, 372 F.2d 535, 538 (CCPA 1967). For example, Dr. Huang states “This research is the breakthrough we have been waiting for since nearly a century . . . This is crucial for the potato breeding worldwide.” Ex. 2009, 687. There is no evidence that this long-felt need was satisfied by another before Appellant’s invention. See Newell Companies, Inc. v. Kenney Mfg. Co., 864 F.2d 757, 768 (Fed. Cir. 1988) (“[O]nce another supplied the key element, there was no long-felt need or, indeed, a problem to be solved . . . .”). Lastly, Dr. Lindhout explains that this invention satisfies the long-felt need, stating “I have discovered, and disclosed in the present application for patent, how a fertile homozygote in” slip op. at 33
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached
“XII. DISCRETIONARY DENIAL – 35 U.S.C. § 325(d) In view of our determination that the Petitioner does not meet the threshold for instituting review on the merits, we need not address the parties’ dispute about whether the Board should exercise its discretion to deny institution under 35 U.S.C. § 325(d). Pet. 74–75; Prelim. Resp. 38–54; Pet. Reply 1–5; PO Sur-Reply 1–5.” slip op. at 35
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 11,140,841 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached
“IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,089,946 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13
- BurdenNot shown unpatentable
“We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,814,071 - Samsung Electronics Co., Ltd. v. Advanced Coding Technologies, LLCInstitution deniedPTAB · May 23, 2024 · IPR2024-00062 · APJ Nathan A Engels · IPR · Institution
The Board denied institution because Petitioner did not show that the prior art disclosed or taught the construed “emphasis level” limitation in any challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“which the amplitude of the high frequency components of the video signal is increased,” as required by the construction of “emphasis level.”7 See Prelim. Resp. 9 (“the Petition’s analysis of the claim limitations containing these terms against the cited references does not indicate that those references disclose these limitations under Petitioner’s proposed constructions in the District Court Action”). Thus, without Petitioner mapping the constructions to the prior art in a clear and identifiable way, we determine the Petition itself does not satisfy Petitioner’s burden. See 37 C.F.R. §§ 42.104(b)(3)– (4).” slip op. at 6
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionDecided for petitioner
“the terms “emphasis processing” and “emphasis level.” In the Petition, Petitioner states that no constructions are necessary (Pet. 2), but after filing 2 US 5,491,514; issued Feb. 13, 1996. Ex. 1005. 3 US 5,241,387; issued Aug. 31, 1993. Ex. 1006. 4 US 6,801,665 B1; published Sept. 30, 1999. Ex. 1007. the Petition, Petitioner proposed constructions of those terms in the parties’ district-court litigation, stating that: (i) the claim term “emphasis processing” means “increasing the amplitude of the high frequency components of a video signal;” and (ii) the claim term “emphasis level” means “a value that represents the amount by which the amplitude of the high frequency components of the video signal is increased.” Ex. 2003, 10– 11. After Patent Owner relied on those constructions in its Preliminary Response (see, e.g., Prelim. Resp. 8–10),5 Petitioner requested (Ex. 3001), and the Board authorized (Paper 8), additional briefing to address how the analysis in the Petition applies under those constructions.6 Because we determine Petitioner’s showings with respect to those constructions are inadequate to carry Petitioner’s burden, our discussion below focuses primarily on those aspects of the parties’ briefing.” slip op. at 4
- PTAB / AIA Trials › Discretionary denialNot reached
“Discretionary Denial Because we determine Petitioner has not carried its burden on the merits, we do not reach the parties’ arguments relating to discretionary denial. See Pet. 98–99; Prelim. Resp. 26–32.” slip op. at 11
Claim constructionDiscretionary denialPatents in suitUS 6,845,128 - Parse Biosciences, Inc. v. 10x Genomics, Inc.Institution deniedPTAB · Dec 19, 2023 · IPR2023-01033 · APJ Sheridan K Snedden · IPR · Institution
The Board denied institution of IPR challenging claims 1–30, finding substantially the same art had been presented to the Office and no material error was shown under § 325(d).
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dInstitution denied
“the following two-part framework: (1) whether the same or substantially the same art previously was presented to the Office or whether the same or substantially the same arguments previously were presented to the Office; and (2) if either condition of [the] first part of the framework is satisfied, whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of challenged claims. Advanced Bionics, LLC v. MED-EL Elektromedizinische Geräte GmbH, IPR2019-01469, Paper 6, 8 (PTAB Feb. 13, 2020) (precedential). The Becton, Dickinson factors provide useful insight into how to apply the framework under 35 U.S.C. § 325(d). Id. at 9 (referencing Becton, Dickinson & Co. v. B. Braun Melsungen AG, IPR2017-01586, Paper 8, 17– 18 (PTAB Dec. 15, 2017) (precedential as to § III.C.5, first paragraph)).” slip op. at 12
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Not reached
“presented to the Office, and (2) Petitioner has not demonstrated that the Office erred. We therefore conclude that it is appropriate to exercise discretion under 35 U.S.C. § 325(d) to deny the Petition. III. CONCLUSION For the foregoing reasons, we exercise discretion under 35 U.S.C. § 325(d) to deny institution of an inter partes review. IV. ORDER In consideration of the foregoing, it is hereby: ORDERED that the Petition is denied, and no trial is instituted.” slip op. at 21
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner
“enzyme complex” and “nucleic acid insert element.” Pet. 21. Patent Owner, for its part, states that “[n]o terms require construction for considering institution.” Prelim. Resp. 18. We determine that neither of the two limitations identified by Petitioner requires an express construction for purposes of this Decision. It bears mentioning, however, that the ’357 patent states that “[t]he insertional enzyme can be a transposase.” Ex. 1001, 3:47–48. There is no dispute that Grunenwald discloses the use of a transposase and, thus, an insertional enzyme complex. See Pet. 16 (citing Ex. 1003 ¶¶ 17, 93–94, 162); Prelim. Resp. 13 (“Grunenwald further defines ‘transposase’ to mean ‘an enzyme that is capable of forming a functional complex . . . and catalyzing insertion or transposition of the transposon end-containing composition into the double-stranded target DNA with which it is incubated in an in vitro transposition reaction.” (citing Ex. 1003 ¶ 93)).” slip op. at 6
- Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed board ownDecided for patent owner
“express construction of the term “chromatin.” The ’357 patent itself provides a definition, stating: The term “chromatin,” as used herein, refers to a complex of molecules including proteins and polynucleotides (e.g. DNA, RNA), as found in a nucleus of a eukaryotic cell. Chromatin is composed in part of histone proteins that form nucleosomes, genomic DNA, and other DNA binding proteins (e.g., transcription factors) that are generally bound to the genomic DNA. Ex. 1001, 12:61–67. This is the meaning that we apply in this Decision.” slip op. at 6
Claim constructionDiscretionary denialPatents in suitUS 10,738,357
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.