- Penumbra, Inc. v. Rapidpulse, Inc.No claims unpatentablePTAB · Feb 17, 2026 · IPR2024-01261 · APJ Jamie T Wisz · IPR · Final written decision
Claims 1–20 were not shown unpatentable because the asserted combinations did not teach the claimed predetermined cycle for controlling distal fluid flow.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“(1) a person with a B.S. in engineering or an equivalent field, with two-four years of academic or industry experience in aspiration embolectomy and thrombectomy or comparable industry experience who would, where appropriate, work or consult with others, including a physician, to develop embolectomy or thrombectomy devices; or (2) an interventional neurosurgeon with at least three years of experience developing and/or using medical devices in embolectomy or thrombectomy procedures, and who would, where appropriate, work or consult with others, including an engineer, to develop such a medical device. Pet. 11 (citing Ex. 1005 ¶ 48). Petitioner also contends that, “[a] person with less education but more relevant practical experience, or more relevant education but less practical experience, may also meet this standard.” Id. Patent Owner states that for purposes of its PO Response, it “accepts ¶ 44). We adopt Petitioner’s characterization because it is consistent with the level of skill in the art at the time of the invention as reflected by the ’402 patent and the cited prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))).” slip op. at 8
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“specification explicitly includes sensors similar to those in the prior art in support of their argument that the claimed “predetermined cycle” must not exclude the use of such sensors. Pet. Reply 15 (citing Ex. 1001, 32:55–33:7, 40:66–41:5, 44:9–29). We reviewed the portions of the specification cited by Petitioner. We agree with Patent Owner that one excerpt discussing sensor use appears to be directed to triggering the predetermined cycle rather than causing timing changes during the cycle itself (Ex. 1001, 32:55–66) (describing use of a pressure sensor to “determine when the vacuum channel 3 is clogged by a thrombus and automatically perform the unclogging procedures described herein”), while another excerpt discusses a sensor that Petitioner that the ’402 patent discusses the use of sensors to “tune” the system and that such “tuning” can be done statically (setting the cycle timing in advance) or dynamically (adjusting the timing during the cycle itself). See Ex. 1001, 48:19–49:50. Overall, we find that these disclosures involving sensors demonstrate that sensors may be used in various ways in different embodiments. However, none of these disclosures explicitly discuss the use of sensors in conjunction with a “pre-determined cycle.” Therefore, we find that the ’402 patent specification’s discussion of “sensors” are not particularly informative as to the appropriate construction of a “predetermined cycle” and do not outweigh the other explicit disclosures of “predetermined cycle” in the patent. We next turn to the other intrinsic evidence discussed by the parties — the prosecution history. As discussed by Patent Owner, in the Notice of Allowance, the Examiner found that Garrison did not teach or suggest a “predetermined cycle” because Garrison’s controller “changed the cycle of opening and closing the valves based on feedback from sensors.” Ex. 1004, 86. We acknowledge that the patent applicant filed subsequent comments during prosecution in which they stated that they “do[] not concede that the Examiner’s characterizations of the terms of the claims and the prior art are correct.” Id. at 29. However, we agree with Patent Owner that the importance of the Examiner’s statement in the Notice of Allowance does not rely on it being an express disclaimer (a standard which it does not meet). PO Sur-reply 8. We also considered Petitioner’s contention that the Examiner’s interpretation of Garrison may have been in error (PO Resp. 16); however, even if this were true, the Examiner’s statement still provides helpful insight into how the Examiner was interpreting the term sensors to change the opening and closing of valves during a cycle was not a “predetermined cycle.” Id. at 86. In sum, we find that Patent Owner’s proposed construction is consistent with the usage of the term “predetermined cycle” in the ’402 patent specification and prosecution history. Thus, after considering all of the cited evidence, we construe “predetermined cycle” to mean that “the timing of the sequence of valve operations in the cycle is determined beforehand, i.e., fixed, rather than varying based on feedback after operation begins.”” slip op. at 14
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“2. Other Terms The parties also provided proposed constructions for the limitations of “[limited/limiting] to a positive amount of exit flow” and “control[ling] fluid flow in and out from the distal end of the catheter.” See Pet. 15–16; Pet. Reply 1–8; PO Resp. 22–24; PO Sur-Reply 2–6. However, having evaluated the arguments and evidence before us, we determine that construction of these terms is not necessary for purposes of this Decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”)).” slip op. at 16
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableNot shown unpatentable
“We agree with Patent Owner that neither Petitioner nor Mr. Brown propose any combination of Yang and Mullins that does not include Mullins’s pressure sensor in order “to control fluid flow in and out from the distal end of the catheter.” Indeed, in addressing the “predetermined cycle” limitation, Mr. Brown contends that Mullins discloses a “cycling controller that ‘varies aspiration pressure according to sensed pressure within the catheter lumen.’” Ex.1005 ¶¶ 131–32 (citing, e.g., Ex.1008, 27:40–28:20 (“[a] novel aspect of this pump system is the incorporation of feedback into the pump algorithm in order to produce more effective pressure cycling”)). This use of a sensor to change pressure during a cycle, is not a “predetermined cycle” under our construction. combinations is its discussion of distal end flow control, not for its sensors.” Pet. Reply 17 (citing Ex. 1035 ¶ 83). However, Petitioner’s obviousness grounds rely on the combination of Yang and Mullins, especially with regard to Mullins’s disclosure of “a controller” in order “to control fluid flow in and out.” As discussed above, Mullins relies on the sensor-feedback approach in order to control flow and we find that Petitioner has not presented persuasive evidence of how the combined disclosures of Yang and Mullins would control flow without using Mullins’s sensor feedback approach. See W.L. Gore & Assocs., Inc. v. Garlock, Inc., 721 F.2d 1540, 1550 (Fed. Cir. 1983) (error to “consider[] … references in less than their entireties, i.e., in disregarding disclosures in [them] … that diverge from and teach away from the invention”). Therefore, we determine that Petitioner has not sufficiently shown that the combination of Yang and Mullins discloses or renders obvious “a controller configured to open and close the vacuum valve and the vent valve in a predetermined cycle to change a level of vacuum at the distal end of the catheter and to control fluid flow in and out from the distal end of the catheter.” Accordingly, having considered the parties’ respective evidence and arguments, we find that Petitioner has not shown by a preponderance of the evidence that claim 1 of the ’402 patent would have been unpatentable as obvious over the combination of Yang and Mullins.” slip op. at 27
Patent outcomesUS 11,406,402 not shown unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,406,402 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Interactive Communications International, Inc. v. Blackhawk Network Inc.All claims unpatentablePTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision
Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.
RulingsFinal written decision- Skill levelSkill level board ownDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner
“On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37
- Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner
“On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37
Patent outcomesUS 11,488,451 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,488,451 - PTAB · Apr 25, 2025 · IPR2024-01463 · APJ David Cotta · IPR · Institution
The Board instituted inter partes review of claims 1–10 on all asserted grounds, finding a reasonable likelihood of success on at least one claim.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner
“predict how the district court in the related district court litigation will proceed because the court may determine whether or not to stay any individual case . . . based on a variety of circumstances and facts beyond our control and to which the Board is not privy.” Sand Revolution II LLC v. Cont’l Intermodal Grp., IPR2019-01393, Paper 24, 7 (PTAB June 16, 2020) (informative). We decline to speculate on how the court may rule on the pending motion to stay. Accordingly, this factor is neutral.” slip op. at 13
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), inter partes review may not be instituted unless the Petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Petitioner has established a reasonable likelihood of prevailing on its assertion that at least one of the challenged claims is unpatentable based on the grounds advanced here. We decline to deny the Petition on a discretionary basis as requested by Patent Owner. Thus, for reasons explained below, we institute inter partes review of claims 1–10 of the ’706 patent.” slip op. at 2
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“TC(220), and ΔRz/Ra are result effective variables and that copper foils having ΔPD, TC(220), and ΔRz/Ra values that meet the values recited in claim 1 have advantageous properties. See, e.g., Ex. 1005 ¶ 45 (Kim ’761, disclosing that preferably the “difference in peak count roughness Rpc between the shiny surface . . . and the matte surface . . . of the electrolytic copper foil . . . is preferably 60 or less” because “when the difference in the peak count roughness Rpc exceeds 60 capacity maintenance of the secondary battery is deteriorated.”);15 Ex. 1007, 3:16–23, 4:14–23 (Cheng, disclosing that the foils of Cheng’s invention have (220) and (311) surfaces that provide increased elongation and that solve a high roughness problem that rendered traditional products unsuitable for use in a lithium ion secondary battery), 10:27–34 (Cheng, disclosing that in the foils of Cheng’s invention “the roughness difference between both sides was extremely small” and thus “it was . . . not easy for the electrolytic copper foil to break or fracture during the charging-discharging cycles and the life of a battery is thus increased”), Tables 3 & 4 (Cheng, disclosing embodiments and comparative examples with TC(220) values meeting the requirements of claim 1); Ex. 1008, 6:36–44 (Wolski, disclosing that “the surface roughness Rz at the matte side of the untreated copper foil of the present invention is the same or smaller than the surface roughness Rz at the shiny side . . . so that the surface treated copper foil . . . becomes more low-profiled . . . whereby it becomes a foil having a large etching factor”), 9:1–29 & Table 2 (Wolski, disclosing 15 Dr. Randall testifies that “Kim ’761’s peak count roughness Rpc corresponds to the peak density PD of the ’706 patent.” Ex. 1003 ¶ 52. At this stage in the proceeding, this testimony is unrebutted. 38 embodiments meeting the ΔRz/Ra of claim 1, describing them as having “matte side roughnesses” that are “sufficiently small,” and as having “excellent” “high temperature elongation characteristics”), 11:37–41 (Wolski, describing comparative examples as having “large” matte side roughnesses “whereby etching factors are not good”), 12:12–27 (Wolski, teaching that “as compared with a conventional untreated copper foil, both surfaces of the untreated copper foil obtained by [Wolski’s] invention are flat” resulting in a low profile foil that has “excellent elongations at room temperature and high temperature and also high tensile strength”). The teachings in the prior art support the presently unrebutted testimony of Dr. Randall explaining why the POSA would have been motivated to modify Kim ’761’s copper foil to have the claimed TC(220) and ΔRz/Ra. Ex. 1003 ¶¶ 66–68, 71–74; Pfizer Inc., v. Sanofi Pasteur Inc., 94 F.4th 1341, 1348 (Fed. Cir. 2024) (“Where [a gap in prior art] includes a parameter not necessarily disclosed in the prior art, it is not improper to consider whether or not it would have been recognized as result-effective. If so, then the optimization of that parameter is ‘normally obvious.’”). Accordingly, we are not persuaded by Patent Owner’s argument that Petitioner failed to articulate a sufficient motivation to combine the references. To the contrary, the preliminary record presents a strong showing that the POSA would have been motivated to combine the references in the manner described in the Petition.” slip op. at 38
- Skill levelSkill level petitioner adoptedDecided for petitioner
“At this stage of the proceeding, Patent Owner does not contest Petitioner’s definition of the level of skill in the art. Prelim. Resp. 4 (“For purposes of this Preliminary Response, Patent Owner applies Petitioner’s level of skill for a person of ordinary skill in the art”). Petitioner’s definition appears to be consistent with the field of the invention reflected in the prior art of record and the disclosure of the ’706 patent. Accordingly, for purposes of this Decision, we adopt Petitioner’s proposed definition of the person of ordinary skill in the art.” slip op. at 21
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 11,591,706 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached
“IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,089,946 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13
- BurdenNot shown unpatentable
“We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,814,071 - PTAB · Mar 13, 2025 · IPR2024-01467 · APJ Michael A Valek · IPR · Institution
Instituted IPR on claims 1–8 and 11–22 based on the §103(a) challenge over Xu-752 and Jones, after finding a reasonable likelihood of success on claims 16–22.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Having reviewed Petitioner’s showing, we find that it demonstrates a reasonable likelihood that Petitioner will prevail in demonstrating that claim 16 is unpatenable over Xu-752 and Jones. Patent Owner’s arguments in the Preliminary Response are unavailing on the current record. We address those arguments below.” slip op. at 17
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Having reviewed Petitioner’s showing, we find that it demonstrates a reasonable likelihood that Petitioner will prevail in demonstrating that claim 16 is unpatenable over Xu-752 and Jones. Patent Owner’s arguments in the Preliminary Response are unavailing on the current record. We address those arguments below.” slip op. at 17
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDecided for petitioner
“We agree with Petitioner that Oka is not cumulative of Jones. Jones discloses an impedance measuring system for measuring the impedance of each well of a multiwell plate. Ex. 1006, code (57). Moreover, Jones clearly teaches that the daughter boards in its system “may be equipped with multiple analog-to-digital converters.” Id. ¶ 18. Oka, in contrast, does not. As Patent Owner acknowledges, “Oka is a planar multielectrode array that 11 Oka et al., “A new planar multielectrode array for extracellular recording: application to hippocampal acute slice,” 93 J. of Neuroscience Methods 61– 67 (1999) (Ex. 1026) (“Oka”). measures via extracellular recording instead of impedance.” Prelim. Resp. 51 n. 10 (emphases added). This is consistent with the applicants’ arguments during prosecution that Oka does not disclose a multiwell plate, plurality of wells, or even measuring cell-substrate impedance. See, e.g., Ex. 1002, 191–193. Moreover, as Petitioner points out, Oka appears to disclose only a single ADC connected to a switch. See Ex. 1026, 63 (Fig. 2); see also Ex. 1002, 188 (applicant urging that “Oka uses a switch to connect the AD-C to different electrodes at different times” and therefore is not performing measurements for individual electrode arrays). Thus, unlike Jones, Oka does not disclose a plurality of ADCs, much less multiple ADCs arranged and operated in parallel such that impedances for multiple wells are measured at a time.12” slip op. at 28
- Skill levelSkill level petitioner adoptedDecided for petitioner
“of May 2009 “would have had a B.S. in electrical/mechanical/biomedical engineering or biological science, or a related field, and approximately 2 years of relevant experience or equivalent study in systems and methods for bioanalysis of cells.” Pet. 14 (citing Ex. 1003 ¶¶ 23–25). Patent Owner does not dispute or otherwise respond to Petitioner’s description of a POSA in its Preliminary Response. At this stage, we find Petitioner’s description of the level of ordinary skill in the art to be sufficiently supported by the record and apply it for purposes of this decision.” slip op. at 7
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 11,906,508 - Amphenol Corp. v. PPC Broadband, Inc.All claims unpatentablePTAB · Feb 19, 2025 · IPR2023-01363 · APJ Jon B Tornquist · IPR · Final written decision
Claims 1, 2, and 10–13 are unpatentable as obvious over the stated combinations of Holmberg, Battey, Blankenship, and Cowen.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends a person of ordinary skill in the art “would have had at least a bachelor’s degree in electrical engineering, computer engineering, or a related field, and at least 1 year of experience related to communication networks or the equivalent.” Pet. 7. Petitioner further contends that “[a]dditional education could substitute for professional experience or significant experience in the field could substitute for formal education.” Id. at 7–8 (citing Ex. 1003 ¶¶ 29–31). Dr. Eldering agrees that one of ordinary skill in the art “would have had at least a bachelor’s degree in electrical engineering, computer engineering, or a related field, and at least one year of experience related to communication networks or the equivalent.” Ex. 2001 ¶ 24. According to Dr. Eldering, “[a] person with less relevant practical experience but with additional experience would also qualify.” Id. Patent Owner contends that” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Although Patent Owner disagrees with Petitioner’s construction, it contends “the Board need not resolve this claim construction dispute because Petitioner’s proposed grounds 1-5 are all insufficient under either construction.” PO Resp. 19. Upon review of the parties’ arguments and the prior art of record, we determine that no claim terms require express construction for purposes of this decision. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). For example, we discuss below in Section III.G why we do not reach the claim construction issue presented by Petitioner.” slip op. at 11
- Expert testimonyPetitioner expert creditedDecided for petitioner
“We find that Holmberg expressly contemplates using its wall box within multi-dwelling units, notes that multi-dwelling wall boxes in the prior art were “typically provided” on every floor, and discloses that the multi-dwelling wall boxes would contain optical couplings for each resident on a given floor. Ex. 1004 ¶¶ 7, 34; Pet. Reply 8–10. In view of these disclosures, we credit the testimony of Dr. Kiaei that one of ordinary skill in the art would have sought to use Holmberg’s wall box in multi-dwelling units and would have seen a need to access the area behind spice tray 230 to connect and disconnect subscribers. Ex. 1003 ¶ 92; Ex. 1033 ¶¶ 7–8. Moreover, even if Holmberg were limited to mid-span locations and distributing drop cables, as opposed to distribution cables for individual subscribers, as asserted by Patent Owner, Patent Owner does not dispute that a technician would still need periodic access to the area behind splice tray 230 in these mid-span devices. Tr. 38:3–39:1 (counsel agreeing that one would need to access the area behind splice tray 230 in Holmberg, albeit in “rare occasions”); Ex. 1003 ¶¶ 90–92; Ex. 1033 ¶¶ 7–8. Thus, whether used in the manner contemplated by Petitioner or Patent Owner, Petitioner persuasively demonstrates that access to the space behind splice tray 230 in Holmberg would be necessary. With access behind splice tray 230 required, Petitioner persuasively demonstrates that one of ordinary skill in the art would have seen a benefit to replacing Holmberg’s fasteners or screws with a hinged connection, such as that disclosed in Battey, to allow easier access to the area behind the splice tray. Pet. 41 (citing Ex. 1005 ¶ 39 (disclosing that a rotatable splice tray or shelf would “provide[] full and convenient access to the splice tray”)). First, Petitioner and Dr. Kiaei persuasively demonstrate that once the fibers of Holmberg are routed from behind splice tray 230 and the distribution cables spooled on this tray, a technician could not reasonably access fiber optic cables stored behind splice tray 230 without releasing or opening splice tray 230. Pet. Reply 14–15 (citing Ex. 1023, 60:20–61:15); Ex. 1033 ¶¶ 31–32. Second, Petitioner persuasively demonstrates that without a hinged connection, the technician would have to either hold the splice tray of Holmberg with one hand while performing the necessary routing and splicing steps, two screws would need to remain in place (essentially replicating a hinge), or the tray would have to be left to dangle, supported only by the routed and spliced fibers. Pet. Reply 19–20.” slip op. at 22
- Strike new argumentNew argument consideredDecided for petitioner
“Allegedly New Arguments on Reply Patent Owner contends that Petitioner’s arguments regarding the benefits of a hinged connection when performing the splicing and routing steps should be dismissed or ignored because they were improperly raised for the first time on reply. Sur-reply 19–20. We disagree. The Petition asserts that one of ordinary skill in the art would have sought to add a hinged connection, such as that disclosed in Battey, in Holmberg and would have seen a benefit to so doing. Pet. 40–44. Petitioner did not change its proposed combination or its stated rationale in its Reply. Rather, in response to Patent Owner’s counter-arguments, Petitioner expands upon the benefits of its proposed combination, i.e., the substitution of a hinged connection in place of fasteners. Pet. Reply 15–21. This is permissible, as a reply may properly expand on or extend previously raised arguments relating to the motivation to make the proposed changes to the prior art. See Rembrandt Diagnostics, LP v. Alere, Inc., 76 F.4th 1376, 1385 (Fed. Cir. 2023) (explaining that the reply arguments properly relied on the same legal ground, the same prior art references, and same legal argument—the motivation to make the proposed changes to the prior art reference).” slip op. at 25
Patent outcomesUS 9,008,483 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,008,483 - PTAB · Feb 14, 2025 · IPR2024-01330 · APJ Tina E Hulse · IPR · Institution
The Board instituted IPR of claims 3, 4, and 12–19 on all asserted obviousness grounds, finding a reasonable likelihood of success and declining § 325(d) denial.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon considering the arguments and evidence presented in the papers, we determine that Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one claim challenged in the Petition, and we decline to exercise our discretion to deny institution under 35 U.S.C. § 325(d). Accordingly, we institute an inter partes review of the challenged claims of the ’746 Patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“As explained in the -459 IPR, we do not discern much of a substantive difference between the parties’ respective definitions in this proceeding beyond the number of years of experience after obtaining a doctoral degree. Compare Pet. 12, with Prelim. Resp. 21. For purposes of this Decision, we adopt Patent Owner’s definition as it appears to be reasonable and falls between Petitioner’s definitions asserted in the Petition and in its request for reexamination of the ’781 Patent. See Ex. 2001 ¶ 51. Moreover, Patent Owner’s definition appears consistent with the prior art’s demonstration of the level of ordinary skill in the art at the time of the invention. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))). To the extent the parties continue to disagree on the level of ordinary skill in the art, they should brief the issue further during trial.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Patent Owner states that it “does not believe that the Board must construe any claim terms in order to deny institution” and “reserves the right to assert claim construction positions should the Board institute IPR.” Prelim. Resp. 20. At this stage of the proceeding, we agree with the parties that no construction of any claim term is necessary for purposes of our Decision. See Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011) (“[C]laim terms need only be construed ‘to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 11,970,746 - PTAB · Jan 31, 2025 · IPR2024-00979 · APJ Lisa A Murray · IPR · Institution
The Board instituted inter partes review of claims 1–18 on all four asserted obviousness grounds, finding a reasonable likelihood that Dolan renders at least one challenged claim unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“As set forth in the Director’s Memorandum, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation (dated June 21, 2022), at 7, available at https://www.uspto. gov/sites/default/files/documents/interim_proc_discretionary_denials_aia_ parallel_district_court_litigation_memo_20220621_.pdf, the PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation (Ex. 1018) satisfies the language from the Director’s Memorandum quoted above. Therefore, we need not analyze each Fintiv factor to reach the determination that we will not exercise our discretion to deny institution in view of the parallel Eastern District of Texas Litigation.” slip op. at 7
- PTAB / AIA Trials › Real party in interest / privityNot reached
“Electronics, America, Inc.; and Google LLC as real parties in interest. Pet. 57. Petitioner explains that “Google LLC is a subsidiary of XXVI Holdings Inc., which is a subsidiary of Alphabet Inc.” Id. at 57 n.10. Petitioner asserts that “XXVI Holdings Inc. and Alphabet Inc. are not real parties-in-interest to this proceeding.” Id. Patent Owner identifies Cerence Operating Co., a subsidiary of Cerence, Inc., as a real party in interest. Paper 5, 1. Patent Owner disagrees with Petitioner, contending that Alphabet Inc. is also a real party in interest. Id. At this stage of the proceeding, we need not determine whether Alphabet Inc. is a real party in interest to Petitioner since neither Petitioner nor Patent Owner has identified any effect that determination would have on the outcome of this proceeding. To the extent Patent Owner seeks to maintain this contention, it should raise the issue in its Patent Owner response.” slip op. at 3
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner does not currently take a position on the relevant level of ordinary skill in the art and believes that “the Board could assume Petitioner’s proposed level of ordinary skill for the purposes of deciding whether to institute.” Prelim. Resp. 3. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’993 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Plain and ordinary meaningOther
“Additionally, only terms that are in controversy need to be construed, and these need to be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). At this time, neither party proposes a specific construction of any given claim term, instead requesting that the claims be given their plain and ordinary meaning. Pet. 10–11; Prelim. Resp. 5.” slip op. at 11
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,081,993
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.