- Medtronic, Inc. v. Moskowitz Family LLCInstitutedPTAB · Aug 20, 2026 · IPR2026-00162 · APJ John A Squires · IPR · Director review
The Director granted the petition and instituted inter partes review of claims 8, 9, 13, and 17–21 based on Palmatier.
RulingsDirector review decision- Director reviewOther
“Before JOHN A. SQUIRES, Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office. DECISION Granting Institution of Inter Partes Review” slip op. at 1
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“1 US 9,445,919 B2, issued Sept. 20, 2016 (Ex. 1057). 2 At this preliminary stage, Petitioner establishes a reasonable likelihood that Palmatier anticipates or renders obvious the challenged claims (Pet. 22–66), and Patent Owner does not challenge Petitioner’s showings as to Palmatier.” slip op. at 2
- BurdenDecided for petitioner
“1 US 9,445,919 B2, issued Sept. 20, 2016 (Ex. 1057). 2 At this preliminary stage, Petitioner establishes a reasonable likelihood that Palmatier anticipates or renders obvious the challenged claims (Pet. 22–66), and Patent Owner does not challenge Petitioner’s showings as to Palmatier.” slip op. at 2
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportDecided for petitioner
“Patent Owner does present some evidence of conception, diligence, and constructive reduction to practice, but Petitioner persuasively disparages that evidence on the preliminary record. For example, Patent Owner relies on April and May 2011 emails exchanged between two or more of the named inventors (Exs. 2027–2031, 2056, 2057, 2059) and a declaration from one of the named inventors, Dr. Nathan Moskowitz (Ex. 2024), to show conception of the claimed subject matter. Prelim. Resp. 8–61. Patent Owner also relies on Dr. Moskowitz’s declaration and emails (Exs. 2045, 2049, 2050) to show reasonably continuous diligence leading up to the filing of a provisional patent application. Id. at 63–66. Petitioner asserts that the documentary evidence does not show conception of the claimed “ridges,” in part, because a key email attachment regarding an embodiment for ridges has not been provided. Pet. Reply 1–4. Petitioner also asserts that Patent Owner’s relies on the declaration testimony from only one named inventor, which is vague and should be the subject of cross-examination. Id. Given these disputes, during trial, the parties are free to develop the record as to the asserted prior conception and diligent reduction to practice of the claimed subject matter, relative to Palmatier’s filing date.” slip op. at 3
§ 102 anticipationPatents in suitUS 12,011,367 - Apple, Inc. v. Wecrevention, Inc.Institution deniedPTAB · Jun 24, 2026 · IPR2026-00242 · APJ John A Squires · IPR · Director review
The Director denied the petitions and instituted no trial, exercising discretion based on Petitioner’s unexplained inconsistent claim-construction positions before the Board and district court.
RulingsDirector review decision- PTAB / AIA Trials › Discretionary denialInstitution denied discretionary otherInstitution denied
“As I have indicated previously, petitioners should be presenting a single construction and applying that construction consistently. See Infineon Techs. Americas Corp. v. Mosaid Techs. Corp., IPR2025-01456, Paper 27 at 3–4 (Director Mar. 17, 2026). Failure to do so, without adequate explanation, is problematic and raises concerns of strategic litigation behavior spill-over into the PTAB inconsistent with Congress’s intent to provide a quick and cost-effective alternative to district court litigation. Id.; Revvo, Paper 20 at 3–4; see H.R. Rep. No. 112-98 at 48 (2011). Here, Petitioner offers no explanation for its divergent positions.” slip op. at 3
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner
“As I have indicated previously, petitioners should be presenting a single construction and applying that construction consistently. See Infineon Techs. Americas Corp. v. Mosaid Techs. Corp., IPR2025-01456, Paper 27 at 3–4 (Director Mar. 17, 2026). Failure to do so, without adequate explanation, is problematic and raises concerns of strategic litigation behavior spill-over into the PTAB inconsistent with Congress’s intent to provide a quick and cost-effective alternative to district court litigation. Id.; Revvo, Paper 20 at 3–4; see H.R. Rep. No. 112-98 at 48 (2011). Here, Petitioner offers no explanation for its divergent positions.” slip op. at 3
Claim constructionDiscretionary denialPatents in suitUS 11,894,098 - Apple, Inc. v. Wecrevention, Inc.Institution deniedPTAB · Jun 24, 2026 · IPR2026-00241 · APJ John A Squires · IPR · Director review
The Director denied institution of the IPR, finding Apple's unexplained inconsistent claim-construction positions before the Board and district court problematic.
RulingsDirector review decision- Other 314aInstitution denied discretionary otherDenied
“As I have indicated previously, petitioners should be presenting a single construction and applying that construction consistently. See Infineon Techs. Americas Corp. v. Mosaid Techs. Corp., IPR2025-01456, Paper 27 at 3–4 (Director Mar. 17, 2026). Failure to do so, without adequate explanation, is problematic and raises concerns of strategic litigation behavior spill-over into the PTAB inconsistent with Congress’s intent to provide a quick and cost-effective alternative to district court litigation. Id.; Revvo, Paper 20 at 3–4; see H.R. Rep. No. 112-98 at 48 (2011). Here, Petitioner offers no explanation for its divergent positions.” slip op. at 3
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Other
“that “[a]ll claim terms should be construed according to their ordinary and customary meaning,” and that “no claim terms need be construed to resolve issues of controversy in the present Petition.” Paper 2, 4 (emphasis added). Petitioner also states, as part of its analysis of the challenged claims, that “Petitioner does not concede that the preambles of the Challenged Claims are limiting.” Id. at 9 n.5 (emphasis added). In district court, however, Petitioner tells a different story, arguing there that the preamble is limiting. Ex. 2016, 6, 7, 9, 12. Indeed, Petitioner specifically denotes that “[r]eview of ‘the entirety of the patent’ makes clear that the preamble phrase ‘high speed memory chip module’ contains the core of what the inventors ‘actually invented and intended to encompass by the claims,’ . . . and so the preamble should be limiting.” Id. at 7 (internal citations omitted, emphasis added).” slip op. at 2
Claim constructionDiscretionary denialPatents in suitUS 10,998,017 - Apple, Inc. v. Wecrevention, Inc.Institution deniedPTAB · Jun 24, 2026 · IPR2026-00240 · APJ John A Squires · IPR · Director review
The Director denied Apple’s petitions and instituted no trial, exercising discretion based on Apple’s unexplained inconsistent claim-construction positions before the Board and district court.
RulingsDirector review decision- PTAB / AIA Trials › Discretionary denialInstitution denied discretionary otherInstitution denied
“As I have indicated previously, petitioners should be presenting a single construction and applying that construction consistently. See Infineon Techs. Americas Corp. v. Mosaid Techs. Corp., IPR2025-01456, Paper 27 at 3–4 (Director Mar. 17, 2026). Failure to do so, without adequate explanation, is problematic and raises concerns of strategic litigation behavior spill-over into the PTAB inconsistent with Congress’s intent to provide a quick and cost-effective alternative to district court litigation. Id.; Revvo, Paper 20 at 3–4; see H.R. Rep. No. 112-98 at 48 (2011). Here, Petitioner offers no explanation for its divergent positions.” slip op. at 3
- Claim Construction › Intrinsic evidence (Phillips canons) › Preamble limiting or notOther
“that “[a]ll claim terms should be construed according to their ordinary and customary meaning,” and that “no claim terms need be construed to resolve issues of controversy in the present Petition.” Paper 2, 4 (emphasis added). Petitioner also states, as part of its analysis of the challenged claims, that “Petitioner does not concede that the preambles of the Challenged Claims are limiting.” Id. at 9 n.5 (emphasis added). In district court, however, Petitioner tells a different story, arguing there that the preamble is limiting. Ex. 2016, 6, 7, 9, 12. Indeed, Petitioner specifically denotes that “[r]eview of ‘the entirety of the patent’ makes clear that the preamble phrase ‘high speed memory chip module’ contains the core of what the inventors ‘actually invented and intended to encompass by the claims,’ . . . and so the preamble should be limiting.” Id. at 7 (internal citations omitted, emphasis added).” slip op. at 2
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Other
“IPR2026-00243 are similarly problematic. In its Petitions, Petitioner identifies “input/output unit” as a means-plus-function limitation and identifies the corresponding structure as input/output unit 106 in the challenged patent. See, e.g., IPR2026-00241, Paper 2, 4. Petitioner also asserts “the applied prior art anticipates or renders obvious the Challenged Claims, regardless of whether ‘input/output unit’ is construed as a §112(f) means-plus-function limitation,” and that “Petitioner is not conceding . . . that the ’017 Patent provides adequate structure for the ‘input/output unit.’” Id. at 5 (emphasis added). In District Court, however, Petitioner once again takes a different position, arguing that the claim term “input/output unit” should be construed as a means-plus-function limitation, identifying the function as “performing input and/or output functions with respect to memory,” and asserting that the challenged patent “[l]acks sufficient structure (indefinite).” IPR2026-00241, Ex. 2016, 12. According to Petitioner, “[t]he specification fails to disclose sufficient corresponding structure for performing input and output operations with respect to memory, much less for performing those operations within any particular voltage range.” Id. at 19. Petitioner fails to adequately explain its different positions here before the Board and those it propounds in district court. See, e.g., IPR2026-00241, Paper 9. Patent Owner well states the issue; that “[t]o the extent § 112(f) governs, then either input/output unit 106 is sufficient corresponding structure (in which case [Petitioner’s] district-court indefiniteness argument fails), or it is not (in which case [Petitioner’s] IPR mapping relies on a structure [Petitioner] itself maintains is inadequate).” IPR2026-00241, Paper 8, 8–9. I agree. Petitioner’s statement that it does not concede the challenged patent provides adequate structure for the “input/output unit” thus only compounds the problem.” slip op. at 3
Claim constructionDiscretionary denialPatents in suitUS 9,201,834 - Westinghouse Air Brake Technologies Corp. v. Railware, Inc.Institution deniedPTAB · May 15, 2026 · IPR2026-00133 · APJ John A Squires · IPR · Director review
The Director denied the petitions and instituted no trial, exercising discretion based on the complete record and the petitioner’s failure to present a consistent claim construction position.
RulingsDirector review decision- PTAB / AIA Trials › Discretionary denialInstitution denied discretionary otherInstitution denied
“As I have indicated previously, a petitioner should present a single construction and apply that construction consistently. See Infineon Techs. 1 Citations are to papers in IPR2026-00133. The parties filed similar papers in IPR2026-00134 and IPR2026-00135. Americas Corp. v. Mosaid Techs. Corp., IPR2025-01456, Paper 27 at 3–4 (Director Mar. 17, 2026). Failure to do so, without adequate explanation, is problematic. Id.; Revvo, Paper 20 at 3–4. A petitioner may not avoid presenting its own claim construction position in a proceeding before the Office by presenting an analysis based on claim construction positions taken by other parties in a different proceeding. See 37 C.F.R. § 42.104(b)(3) (requiring that the petition must “set forth . . . [h]ow the challenged claim is to be construed”); Trial Practice Guide2 §§ II.B.(3) and (6). Permitting such conduct would allow a petitioner to avoid taking a consistent claim construction position. Such conduct would undermine the purpose of inter partes review proceedings and detract from the Office’s goal of “providing greater predictability and certainty in the patent system.” Revvo, Paper 20 at 4–5. While certain arguments are highlighted above, the determination to exercise discretion to deny institution is based on the complete record and a holistic assessment of all of the evidence in light of the arguments presented.” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Other
“As I have indicated previously, a petitioner should present a single construction and apply that construction consistently. See Infineon Techs. 1 Citations are to papers in IPR2026-00133. The parties filed similar papers in IPR2026-00134 and IPR2026-00135. Americas Corp. v. Mosaid Techs. Corp., IPR2025-01456, Paper 27 at 3–4 (Director Mar. 17, 2026). Failure to do so, without adequate explanation, is problematic. Id.; Revvo, Paper 20 at 3–4. A petitioner may not avoid presenting its own claim construction position in a proceeding before the Office by presenting an analysis based on claim construction positions taken by other parties in a different proceeding. See 37 C.F.R. § 42.104(b)(3) (requiring that the petition must “set forth . . . [h]ow the challenged claim is to be construed”); Trial Practice Guide2 §§ II.B.(3) and (6). Permitting such conduct would allow a petitioner to avoid taking a consistent claim construction position. Such conduct would undermine the purpose of inter partes review proceedings and detract from the Office’s goal of “providing greater predictability and certainty in the patent system.” Revvo, Paper 20 at 4–5.” slip op. at 2
Claim constructionDiscretionary denialPatents in suitUS 9,517,782 - PTAB · Mar 17, 2026 · IPR2025-01487 · APJ John A Squires · IPR · Director review
The Director instituted review of claims 1–21 and bound Petitioner to its district court construction of “clock output signal” for claims 4, 5, and 19.
RulingsDirector review decision- Director reviewDirector review, grantedGranted
“Accordingly, it is: ORDERED that, pursuant to 35 U.S.C. § 314(a), an inter partes review of claims 1–21 of the ’381 patent is instituted; FURTHER ORDERED that Petitioner shall be bound by its proposed district court construction of the term “clock output signal” in its analysis of claims 4, 5, and 19 of the ’381 patent; and” slip op. at 4
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Accordingly, it is: ORDERED that, pursuant to 35 U.S.C. § 314(a), an inter partes review of claims 1–21 of the ’381 patent is instituted;” slip op. at 4
- Prior constructionTerm construed petitioner constructionDecided for patent owner
“positions in the district court that are inconsistent with those presented in the Petition and fails to sufficiently explain why those different positions are warranted. Prelim. Resp. 3–4, 9 (citing Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 (Director Nov. 3, 2025) (precedential) (“Revvo”)). In particular, Patent Owner notes that in District Court, Petitioner has proposed a construction of the term “clock output signal” in dependent claims 4, 5, and 19 as being “a periodic signal that synchronizes system operations.” Id. at 9 (quoting Ex. 2007, 12). In the Petition, however, Petitioner contends that “no claim terms require a formal construction for purposes of addressing the grounds in this Petition.” Pet. 2.” slip op. at 2
Claim constructionPatents in suitUS 9,972,381 - Tiktok, Inc. v. Shopsee, Inc.Institution deniedPTAB · Jan 16, 2026 · IPR2025-01485 · APJ John A Squires · IPR · Director review
The Director granted Patent Owner’s request for discretionary denial and denied the Petition under § 314(a), declining to institute an IPR.
RulingsDirector review decision- Other 314aInstitution denied discretionary otherInstitution denied
“[W]hen a petitioner advances different positions before the Board and a district court, that petitioner is required to explain why those different positions are warranted.” Tesla Inc., v. Intellectual Ventures II, LLC, IPR2025-00340, Paper 18 at 3 (Director Nov. 5, 2025) (informative) (citing Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 at 3–5 (Director Nov. 3, 2025) (precedential)). Petitioner has not done so. Rather, Petitioner has stipulated that it will continue to pursue different constructions and abandon the inconsistent construction in district court if the IPR is instituted. This is not in keeping with our precedent, and I decline to modify it to permit this approach. Additionally, Petitioner’s claim construction stipulation is distinguishable from its stipulation that “it will not pursue in the parallel litigation the grounds it raised or could have reasonably raised in the petition, and that it will not pursue any ground that relies on Ohliger or the Veepio system.” DD Opp. 1–2. The latter stipulation increases efficiency by reducing duplication between the district court and the Board. It also minimizes the potential for inconsistent outcomes in the two proceedings. Petitioner’s stipulation not to continue to advance different claim construction positions lacks similar benefits. At best, it replaces one argument in district court for another argument at the Board. Accordingly, the Petition is denied under 35 U.S.C. § 314(a). slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Decided for patent owner
“[W]hen a petitioner advances different positions before the Board and a district court, that petitioner is required to explain why those different positions are warranted.” Tesla Inc., v. Intellectual Ventures II, LLC, IPR2025-00340, Paper 18 at 3 (Director Nov. 5, 2025) (informative) (citing Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 at 3–5 (Director Nov. 3, 2025) (precedential)). Petitioner has not done so. Rather, Petitioner has stipulated that it will continue to pursue different constructions and abandon the inconsistent construction in district court if the IPR is instituted. This is not in keeping with our precedent, and I decline to modify it to permit this approach. slip op. at 2
Claim constructionDiscretionary denialPatents in suitUS 11,134,316 - PTAB · Sep 25, 2025 · IPR2025-00207 · APJ Gregg I Anderson · IPR · Director review
The Board instituted inter partes review of claims 1–7, 11–14, and 16–19 on all asserted grounds, finding a reasonable likelihood of success on at least one challenged claim.
RulingsDirector review decision- Director reviewDirector review, grantedGranted
“Petitioner filed a request for Director Review of the Decision granting Patent Owner’s request for discretionary denial and denying institution (“Decision,” Paper 10) and Patent Owner filed an authorized response. See Paper 121 (“DR Request”); Paper 13 (“Patent Owner Response”). The Director granted the DR Request and referred the Petition to the Board “to handle the case in the normal course, including by issuing a decision on institution addressing the merits and other non-discretionary considerations, as appropriate.” Paper 14 (“Order Granting Director Review”).” slip op. at 2
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. See 35 U.S.C. § 314(a) (inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”) We therefore institute inter partes review as to all of the challenged claims of the ’228 patent and all of the asserted grounds of unpatentability. See SAS Inst. Inc. v Iancu, 584 U.S. 357, 364–65 (2018); 37 C.F.R. § 42.108 (a)” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“As noted above, Patent Owner did not file a Preliminary Response and thus does not respond at this time. Petitioner’s description is consistent with the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself may reflect an appropriate level of skill). For the purpose of our Decision, we adopt Petitioner’s proposal.” slip op. at 13
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“a “single caching agent,” which is recited in claim 1 here. ’1344 IPR, Paper 31 (“Final Written Decision”), 16–18. We concluded that a “‘single caching agent’ means ‘one caching agent for the processor, which may be formed from distributed portions.’” Id. at 18.” slip op. at 14
Claim constructioncites KSR · NautilusPatents in suitUS 8,984,228 - PTAB · Oct 16, 2024 · IPR2023-01218 · APJ Avelyn M Ross · IPR · Director review
The Board instituted IPR of claims 1–19 on all asserted grounds, finding a reasonable likelihood that Astera and Edwards anticipate or render the claims obvious.
RulingsDirector review decision- Director reviewOther
“under 35 U.S.C. § 314(a), to deny the Petition because it challenges a patent that was previously challenged before the Board. Paper 9; see generally IPR2022-00099 (challenging the ’944 patent). On April 19, 2024, the Director of the United States Patent and Trademark Office granted Director Review, vacated our prior decision, and remanded the case for further proceedings. Paper 12. We have authority to determine whether to institute an inter partes review under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a). For the reasons set forth below, we institute an inter partes review of the challenged claims.” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Neither Petitioner nor Patent Owner proposes any claim terms for construction.5 See Pet. 10; Prelim. Resp. 3–4. For purposes of this Decision, we need not expressly construe any claim terms at this time. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (holding that “only those terms need to be construed that are in controversy, and only to the extent necessary to resolve the controversy”); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs. in the context of an inter partes review).” slip op. at 9
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that a person of ordinary skill in the art “would have had at least a Bachelor of Science degree in electrical engineering, or a closely related field, along with at least two years of experience in the design of entertaining lighting systems, and the design and use of LED lights.” Pet. 10. Patent Owner does not, at this time, dispute Petitioner’s proposed definition. See generally Prelim. Resp. On this record, Petitioner’s proposed definition appears consistent with the prior art of record and we apply it for purposes of this Decision.” slip op. at 8
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“At this preliminary stage, we determine whether the information presented shows a reasonable likelihood that Petitioner would prevail in establishing that at least one of the challenged claims is anticipated by or would have been obvious over the asserted prior art.” slip op. at 8
Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 10,845,044
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.