PTAB
Advanced fields
294 decisions · 1240msnewest first
  • PTAB · Jul 15, 2025 · IPR2024-00425 · APJ Bach V Hoang · IPR · Final written decision

    Claims 1–3, 5, 9, and 10 are unpatentable as obvious over Beck, Heller, and Lovejoy; the Board did not reach the alternative Bandy grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not dispute this assessment. See generally PO Resp. Having considered the record, we adopt Petitioner’s proposed level of skill, as articulated above. We are satisfied that Petitioner’s proposal comports with the level of skill necessary to understand and implement the teachings of the ’307 Patent. Accord Inst. Dec. 8–9.” slip op. at 8

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “both the unique sensor ID as well as the associated unique wireless device ID is contradicted, or at least unsupported, by the claim language and the Specification. We determine that this limitation does not require authentication of both the unique sensor ID and the unique wireless device ID, or otherwise require authentication using the unique wireless ID. Rather, the limitation only requires authentication of the unique sensor ID. The language and structure of the claim itself, “the remote server authenticates said unique sensor ID associated with said unique wireless device ID,” requires authentication of the unique sensor ID but not the unique wireless device ID. See Ex. 1001, 19:51–52 (emphasis added). The portion of the limitation reciting “associated with said unique wireless device ID” is linguistically an appositive modifying the “unique sensor ID.” Indeed, Patent Owner acknowledges the “plain meaning of the claim term is that the remote server authenticates the unique sensor ID and that such unique sensor ID is associated with a unique wireless device ID.” PO Resp. 18.” slip op. at 10

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “Patent Owner does not contest Petitioner’s proposed constructions of any of these other claim terms or phrases. PO Resp. 24. We agree with the parties that the identified limitations—which each recite a “means” or “means for” performing a particular function—are means-plus-function limitations that should be interpreted under pre-AIA 35 U.S.C. § 112 ¶ 6. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1349 (Fed. Cir. 2015) (en banc) (holding that “use of the word ‘means’ creates a presumption that § 112, ¶ 6 applies”). And we agree with Petitioner’s uncontested identification of the recited functions and corresponding structure for these limitations for the reasons explained by Petitioner. See Pet. 11–15 (citing Ex. 1001, 2:20–21, 2:24–28, 3:33–36, 17:18–30); id. at 13–15 (citing Ex. 1009, 9:4–6, 9:19–20, 9:57–65, 10:10– 11) (explaining that Lovejoy is incorporated by reference into the ’307 Patent). We adopt the uncontested constructions identified by Petitioner, as” slip op. at 15

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “We agree with Petitioner that the improvements offered by the incorporation of Heller’s teachings would have motivated one of ordinary skill in the art to combine the teachings of Beck and Heller in the manner proposed by Petitioner. Confirming Petitioner’s assertion that the combination yields improvements, Heller states that it improves the type of glucose monitor used in one of Beck’s embodiments. Beck states that its “medical device 130 includes a glucose meter” which “measure[s] blood glucose levels of blood applied to test strips.” Ex. 1007 ¶ 34. Specifically addressing such “conventional” test strip glucose monitoring, Heller states that its in vivo glucose sensor system addresses a need for continuous or automatic monitoring in a small, comfortable device. Ex. 1016, 2:1–7, 2:15–58, 3:19–25. As such, we agree that a person of ordinary skill in the art would have been motivated to combine the teachings of Beck and Heller to improve Beck’s medical device. See KSR, 550 U.S. at 401. We further agree with Petitioner that a POSITA would have been motivated to incorporate sensor implementation details described in Heller, e.g., an A/D converter and patient attachment systems, with Beck’s medical device. Pet. 44–45, 53, 55; Ex. 1003 ¶¶ 228, 234, 236–238, 259, 267, 278, which do no more than yield predictable results, e.g., converting signals or attaching a sensor to a patient. See KSR, 550 U.S. at 401 (“[A] combination of familiar elements according to known methods is likely to be obvious when it does no more than yield predictable results.”).” slip op. at 20

    Patent outcomesUS 7,969,307 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 7,969,307
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
  • PTAB · May 16, 2025 · IPR2024-01487 · APJ Julia Heaney · IPR · Institution

    The Board instituted IPR on all challenged claims and grounds, finding a reasonable likelihood that claim 1 would have been obvious over Nakazawa and Glaug.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon consideration of the Petition in view of the record at this stage, we determine that Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one claim challenged in the Petition. We also determine that the arguments and evidence of record do not support discretionary denial of the Petition under 35 U.S.C. § 314(a). Accordingly, we grant institution of an inter partes review of all claims and all grounds asserted in the Petition.1” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “person of ordinary skill would modify either Nakazawa’s diffusion sheet or Glaug’s fluid acquisition system, but rather Petitioner argues “various layers in absorbent articles are invariably interchangeable.” Prelim. Resp. 41–42. Contrary to Patent Owner’s argument, as discussed above, Petitioner explains why and how a person of ordinary skill would modify Nakazawa’s diffusion sheet, and provides reasons for doing so. On this record, we find Petitioner’s reasoning sufficient.” slip op. at 24

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › Teaching awayTeaching away not foundDecided for petitioner

      “Patent Owner further argues Nakazawa teaches away from Petitioner’s asserted modification in which Glaug’s lower non-perforated layer is added to Nakazawa’s diffusion sheet. Prelim. Resp. 42. Specifically, Patent Owner argues Nakazawa teaches that its embodiment in which the second absorbent material is wrapped in a hydrophilic sheet has the advantage of preventing leakage of super absorbent polymer (“SAP”) from the second absorbent material without impeding permeation of excretory fluid through the hydrophilic sheet. Id. at 43 (citing Ex. 1008 ¶ 85, Fig. 15). Patent Owner further relies on Petitioner’s argument that Nakazawa’s hydrophilic layer is analogous to the lower non-perforated layer in Glaug. Id. (citing Pet. 93–94). Therefore, Patent Owner argues, Nakazawa teaches that Glaug’s fluid acquisition system would impede permeation of fluid rather than promote it. Id. Patent Owner’s teaching away argument is unavailing based on the current record. Patent Owner improperly relies on Petitioner’s contention in its anticipation challenge based on Nakazawa, and characterizes it as an argument about Glaug. As further discussed in Section II.G below, Petitioner’s anticipation challenge is based on analogizing Nakazawa’s hydrophilic sheet to a core wrap feature identified in Patent Owner’s infringement contention in parallel district court litigation. See Pet. 92–93. Contrary to Patent Owner’s argument, Petitioner’s obviousness contention does not argue Nakazawa’s hydrophilic layer is analogous to Glaug’s nonperforated fibrous layer. Because Patent Owner is not properly characterizing Petitioner’s obviousness contention, Patent Owner’s teaching away argument is not persuasive.” slip op. at 24

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “Under Fintiv, we consider the following factors: 1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. Fintiv at 5–6.” slip op. at 35

    Claim construction§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 9,308,138
  • PTAB · Apr 8, 2025 · PGR2024-00054 · APJ Julia Heaney · PGR · Institution

    The Board instituted PGR on claims 1–17 and 22–28 and all asserted grounds, finding a sufficient likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of a post-grant review is authorized by statute when “the information presented in the petition . . . would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a) (2018). Upon consideration of the parties’ submissions and the evidence of record, we determine that Petitioner has demonstrated that it is more likely than not that at least one claim challenged in the Petition is unpatentable. Further, Patent Owner has not persuaded us that it is appropriate to exercise our discretion not to institute review. Accordingly, we institute a post-grant review of all claims and all grounds asserted in the Petition.1” slip op. at 2

    • Skill levelSkill level patent owner adoptedOther

      “On this record, we do not find Patent Owner’s proposed experience level of at least five years in measurement and analysis of coefficient of friction to be supported. As to the necessity of experience in textile engineering and fiber science, Patent Owner’s position, although not supported by declarant analysis of the factors listed above, is consistent with the disclosure of the ’854 patent, which describes features of a mesh layer in textile and fiber terms. See e.g., Ex. 1001, 10:17–11:14, 12:65–13:8, 14:20–24. On the whole, however, we do not discern on this record how specific experience in textile engineering and fiber science of a person of ordinary skill would materially alter the outcome at this stage of the proceeding. For purposes of this decision only, we apply Patent Owner’s proposed definition of a person of ordinary skill in the art, except for the requirement of five years of experience in measurement and analysis of coefficient of friction. The level of skill in the art remains an open issue in this proceeding. Further submissions by the parties may include argument and evidence that would assist in the resolution of this issue at the close of trial.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner contends “no formal claim construction is necessary in this proceeding.” Pet. 10; Reply 1, 4. Patent Owner contends the terms “mesh layer” and “coefficient of friction” require construction. Prelim. Resp. 14–16; Sur-reply 2–5. We have considered the parties’ arguments and discuss them below with regard to each of the terms Patent Owner contends should be construed. Because our determination that Petitioner demonstrates at least one challenged claim meets the threshold for institution (see SAS Inst., 138 S. Ct. at 1359–60) is not based on construing the term “mesh layer” or “coefficient of friction,” we determine we need not construe either claim term at this stage of the proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”)). As further discussed below, we invite the parties to address claim construction at trial.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Specification disavowal / 'present invention' languageDisclaimer not foundDecided for petitioner

      “We agree with Petitioner that the ’854 patent specification does not include clear and explicit lexicography or a disclaimer that would support requiring “coefficient of friction” to be determined by a specific ASTM test method. The portion of the specification Patent Owner asserts as a definition of “coefficient of friction” (see Ex. 1001, 11:31–42) is a description of an embodiment; we find it does not express patentee intent to redefine the term. Further, the statement that “the coefficient of friction … may be determined using the … ASTM D1894 standard test method” (id. at 11:32–35) indicates that use of that specific test method is optional. Accordingly, in the absence of patentee lexicography or disavowal, we do not limit the scope of the term “coefficient of friction” to require that it be measured by a specific ASTM standard. Luminara Worldwide, LLC v. Liown Elecs. Co., 814 F.3d 1343, 1353 (Fed. Cir. 2016) (“Absent lexicography or disavowal, we do not depart from the plain meaning of the claims.”); In re Am. Acad. Of Sci. Tech Ctr., 367 F.3d 1359, 1369 (Fed. Cir. 2004) (“We have cautioned against reading limitations into a claim from the preferred embodiment described in the specification, even if it is the only embodiment described, absent clear disclaimer in the specification.”). We note that the ’854 patent specification sets forth a definition for the coefficient of friction between the surfaces of the mesh material and the slide surface. Ex. 1001, 4:38–46. As stated above, however, we do not expressly construe any claim term at this stage of the proceeding. Should the parties address the construction of “coefficient of friction” at trial, we will make a determination after the close of evidence and any hearing.” slip op. at 13

    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosureDiscretionary denialcites KSR · Graham
    Patents in suitUS 11,998,854
  • PTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached

      “IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,089,946
  • PTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13

    • BurdenNot shown unpatentable

      “We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 9,814,071
  • PTAB · Mar 18, 2025 · IPR2024-01377 · APJ Brian D Range · IPR · Institution

    The Board instituted IPR on claims 1–25 on all petitioned grounds, finding a reasonable likelihood of success, including that GMW14400 likely qualifies as prior art.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review pursuant to 35 U.S.C. § 6(b). Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” The Board determines whether to institute a trial on behalf of the Director. 37 C.F.R. § 42.4(a). The following findings of fact and conclusions of law are not final, but are made for the sole purpose of determining whether Petitioner meets the threshold for initiating review. Any final decision shall be based on the full trial record, including any response timely filed by Patent Owner. Any arguments not raised by Patent Owner in a timely-filed response may be deemed waived. For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. We hereby institute an inter partes review as to claims 1–25 of the ’227 patent based upon Petitioner’s asserted grounds of unpatentability.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “efficiency and integrity of the system are best served by denying or instituting review.” Fintiv at 6. Here, Fintiv factors one and five are neutral, factors two and three favor discretionary denial, factor four strongly weighs against discretionary denial, and favor six weighs against discretionary denial. The integrity of the system will benefit from institution because of the strong merits the Petition presents (factor six), and the ITC Investigation will not resolve these merits (factor four). This outweighs any potential inefficiency as indicated by factors two and three. We further note that any inefficiency in resolving the grounds the Petition presents is mitigated by the stay of the district court action (factor one). We, thus, decline to exercise discretionary denial under 35 U.S.C. § 314(a).” slip op. at 17

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied

      “After considering the record as a whole, we determine that Petitioner has adequately demonstrated that the Office erred in a manner material to the patentability of challenged claims. As we explain in Section III(G), infra, Petitioner’s challenges to the ’227 patent appear strong based on the current record, and Patent Owner’s present arguments to the contrary are weak. Given the strength of Petitioner’s challenges on the present record, this is not a situation where we would say that “reasonable minds can disagree regarding the purported treatment of the art,” and we therefore determine that the Examiner erred by not considering the art in substantially the combination Petitioner proposes. Where Patent Owner states that “evidence that the Examiner did not consider these references in combination” is lacking (PO Sur-Reply 5), we disagree. If the Examiner considered these references in combination, the Examiner would have, given the apparent strength of Petitioner’s position on the merits on this record, issued a rejection. The lack of a rejection based on the combination proposed in the Petition provides some evidence that the Examiner did not consider these references in combination (because the lack of such a rejection raises the likelihood that the Examiner did not make such a consideration). 3. Conclusion Because Petitioner adequately made a showing of material error, we decline to exercise discretion not to institute inter partes review under 35 U.S.C. § 325(d). See Advanced Bionics, LLC, IPR2019-01469, Paper 6 at 8–9.” slip op. at 19

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “For purposes of this Decision, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 11,326,227
  • PTAB · Mar 18, 2025 · IPR2024-01376 · APJ Brian D Range · IPR · Institution

    The Board instituted review of claims 1–30 on all petitioned grounds, finding a reasonable likelihood of success, including that GMW14400 likely qualifies as prior art.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “IV. CONCLUSION For the reasons above, we determine that the information presented in the Petition establishes that there is a reasonable likelihood that Petitioner would prevail with respect to challenged claims 1–30 of the ’602 patent. At this juncture in the proceeding, we have not made a final determination with respect to the patentability of the challenged claims, or with respect to claim construction. V. ORDER For the foregoing reasons, it is ORDERED that pursuant to 35 U.S.C. § 314(a), an inter partes review of claims 1–30 of the ’602 patent is hereby instituted with respect to all grounds of unpatentability set forth in the Petition; and” slip op. at 36

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “efficiency and integrity of the system are best served by denying or instituting review.” Fintiv at 6. Here, Fintiv factors one and five are neutral, factors two and three favor discretionary denial, factor four strongly weighs against discretionary denial, and favor six weighs against discretionary denial. The integrity of the system will benefit from institution because of the strong merits the Petition presents (factor six), and the ITC Investigation will not resolve these merits (factor four). This outweighs any potential inefficiency as indicated by factors two and three. We further note that any inefficiency in resolving the grounds the Petition presents is mitigated by the stay of the district court action (factor one). We, thus, decline to exercise discretionary denial under 35 U.S.C. § 314(a).” slip op. at 17

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDenied

      “After considering the record as a whole, we determine that Petitioner has adequately demonstrated that the Office erred in a manner material to the patentability of challenged claims. As we explain in Section III(G), infra, Petitioner’s challenges to the ’602 patent appear strong based on the current record, and Patent Owner’s present arguments to the contrary are weak. Given the strength of Petitioner’s challenges on the present record, this is not a situation where we would say that “reasonable minds can disagree regarding the purported treatment of the art,” and we therefore determine that the Examiner erred by not considering the art in substantially the combination Petitioner proposes. Where Patent Owner states that “evidence that the Examiner did not consider these references in combination” is lacking (PO Sur-Reply 5), we disagree. If the Examiner considered these references in combination, the Examiner would have, given the apparent strength of Petitioner’s position on the merits on this record, issued a rejection. The lack of a rejection based on the combination proposed in the Petition provides some evidence that the Examiner did not consider these references in combination (because the lack of such a rejection raises the likelihood that the Examiner did not make such a consideration). 3. Conclusion Because Petitioner adequately made a showing of material error, we decline to exercise discretion not to institute inter partes review under 35 U.S.C. § 325(d). See Advanced Bionics, LLC, IPR2019-01469, Paper 6 at 8–9.” slip op. at 19

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “For purposes of this Decision, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,961,602
  • PTAB · Mar 12, 2025 · IPR2024-01458 · APJ Julia Heaney · IPR · Institution

    The Board instituted IPR of claims 1, 7, 8, and 11 on all asserted grounds, finding a reasonable likelihood of unpatentability on at least one claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon consideration of the Petition in view of the record at this stage, we determine that Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one claim challenged in the Petition. Accordingly, we grant institution of an inter partes review of all claims and all grounds asserted in the Petition.1” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Patent Owner’s construction of the claims as informed by its allegations of infringement in co-pending litigation, as best Petitioner is able to understand such allegations.” Pet. 18 (citing Exs. 1016–1017). Petitioner does not propose construction of any claim term at this stage of the proceeding. Upon review of the record, we determine that no claim terms require express construction for purposes of this Decision. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 7

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “would possess at least a Bachelor’s degree in mechanical engineering, electrical engineering, industrial design or product design or product design engineering, chemistry, or physics, or a related field, and at least three to four years of industry experience, or a Master’s degree in mechanical engineering, electrical engineering, industrial design or product design or product design engineering, chemistry, or physics, or a related field, and at least one to two years of industry experience. Pet. 15 (citing Ex. 1003 ¶ 18). Petitioner further argues a “POSA would have been familiar with electrically powered cigarettes and their components and underlying technologies or similar components and technologies.” Id. For purposes of this decision, we adopt Petitioner’s definition of the level of ordinary skill in the art because it is consistent with the ’788 patent and the asserted prior art.” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “second chamber. Pet 55 (citing Ex. 1005 ¶ 20, Fig. 1a). Petitioner concedes Lee does not disclose a bulb containing a heating wire, but contends this would have been obvious at least in view of Gilbert. Id. at 56 (referring to Pet. 41–42, citing Ex. 1004, 2:45–46, 2:50, 2:71–3:2, Fig. 2). Petitioner contends a person of ordinary skill in the art would have been motivated to explore other types of heating elements than the nichrome wire described in Lee due to issues with e-cigarettes at the time, such as metallic taste or inhalation risks associated with the use of a metal wire heating element. Id. at 57 (citing Ex. 1003 ¶ 117). Petitioner contends it was known to use bulb heaters for vaporizing fluids for almost 100 years (id. ¶¶ 117–118), and therefore a person of ordinary skill would have been motivated to implement a heating element within a glass bulb in Lee’s device to address the metal taste and inhalation risk issues. Pet. 57. Petitioner further contends a person of ordinary skill in the art would have been motivated to implement a heating element within a glass bulb to increase the life of the heating element and prevent failure of the device, because Levin teaches that directly contacting the heating element was known to reduce the life of the heating element, and discloses a heater bulb for vaporizing an active ingredient for inhalation by the user. Id. at 58–59 (citing Ex. 1009 ¶¶ 4, 49, 56). In view of the foregoing, we determine Petitioner has demonstrated sufficiently for purposes of institution that the combination of Lee, Gilbert, and Levin teaches or suggests limitation [1d], and that a person of ordinary skill in the art would have had reason to use Gilbert’s or Levin’s bulb heater in Lee’s electronic cigarette, with a reasonable expectation of success.” slip op. at 14

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 9,538,788
  • PTAB · Feb 19, 2025 · IPR2023-01363 · APJ Jon B Tornquist · IPR · Final written decision

    Claims 1, 2, and 10–13 are unpatentable as obvious over the stated combinations of Holmberg, Battey, Blankenship, and Cowen.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends a person of ordinary skill in the art “would have had at least a bachelor’s degree in electrical engineering, computer engineering, or a related field, and at least 1 year of experience related to communication networks or the equivalent.” Pet. 7. Petitioner further contends that “[a]dditional education could substitute for professional experience or significant experience in the field could substitute for formal education.” Id. at 7–8 (citing Ex. 1003 ¶¶ 29–31). Dr. Eldering agrees that one of ordinary skill in the art “would have had at least a bachelor’s degree in electrical engineering, computer engineering, or a related field, and at least one year of experience related to communication networks or the equivalent.” Ex. 2001 ¶ 24. According to Dr. Eldering, “[a] person with less relevant practical experience but with additional experience would also qualify.” Id. Patent Owner contends that” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Although Patent Owner disagrees with Petitioner’s construction, it contends “the Board need not resolve this claim construction dispute because Petitioner’s proposed grounds 1-5 are all insufficient under either construction.” PO Resp. 19. Upon review of the parties’ arguments and the prior art of record, we determine that no claim terms require express construction for purposes of this decision. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). For example, we discuss below in Section III.G why we do not reach the claim construction issue presented by Petitioner.” slip op. at 11

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “We find that Holmberg expressly contemplates using its wall box within multi-dwelling units, notes that multi-dwelling wall boxes in the prior art were “typically provided” on every floor, and discloses that the multi-dwelling wall boxes would contain optical couplings for each resident on a given floor. Ex. 1004 ¶¶ 7, 34; Pet. Reply 8–10. In view of these disclosures, we credit the testimony of Dr. Kiaei that one of ordinary skill in the art would have sought to use Holmberg’s wall box in multi-dwelling units and would have seen a need to access the area behind spice tray 230 to connect and disconnect subscribers. Ex. 1003 ¶ 92; Ex. 1033 ¶¶ 7–8. Moreover, even if Holmberg were limited to mid-span locations and distributing drop cables, as opposed to distribution cables for individual subscribers, as asserted by Patent Owner, Patent Owner does not dispute that a technician would still need periodic access to the area behind splice tray 230 in these mid-span devices. Tr. 38:3–39:1 (counsel agreeing that one would need to access the area behind splice tray 230 in Holmberg, albeit in “rare occasions”); Ex. 1003 ¶¶ 90–92; Ex. 1033 ¶¶ 7–8. Thus, whether used in the manner contemplated by Petitioner or Patent Owner, Petitioner persuasively demonstrates that access to the space behind splice tray 230 in Holmberg would be necessary. With access behind splice tray 230 required, Petitioner persuasively demonstrates that one of ordinary skill in the art would have seen a benefit to replacing Holmberg’s fasteners or screws with a hinged connection, such as that disclosed in Battey, to allow easier access to the area behind the splice tray. Pet. 41 (citing Ex. 1005 ¶ 39 (disclosing that a rotatable splice tray or shelf would “provide[] full and convenient access to the splice tray”)). First, Petitioner and Dr. Kiaei persuasively demonstrate that once the fibers of Holmberg are routed from behind splice tray 230 and the distribution cables spooled on this tray, a technician could not reasonably access fiber optic cables stored behind splice tray 230 without releasing or opening splice tray 230. Pet. Reply 14–15 (citing Ex. 1023, 60:20–61:15); Ex. 1033 ¶¶ 31–32. Second, Petitioner persuasively demonstrates that without a hinged connection, the technician would have to either hold the splice tray of Holmberg with one hand while performing the necessary routing and splicing steps, two screws would need to remain in place (essentially replicating a hinge), or the tray would have to be left to dangle, supported only by the routed and spliced fibers. Pet. Reply 19–20.” slip op. at 22

    • Strike new argumentNew argument consideredDecided for petitioner

      “Allegedly New Arguments on Reply Patent Owner contends that Petitioner’s arguments regarding the benefits of a hinged connection when performing the splicing and routing steps should be dismissed or ignored because they were improperly raised for the first time on reply. Sur-reply 19–20. We disagree. The Petition asserts that one of ordinary skill in the art would have sought to add a hinged connection, such as that disclosed in Battey, in Holmberg and would have seen a benefit to so doing. Pet. 40–44. Petitioner did not change its proposed combination or its stated rationale in its Reply. Rather, in response to Patent Owner’s counter-arguments, Petitioner expands upon the benefits of its proposed combination, i.e., the substitution of a hinged connection in place of fasteners. Pet. Reply 15–21. This is permissible, as a reply may properly expand on or extend previously raised arguments relating to the motivation to make the proposed changes to the prior art. See Rembrandt Diagnostics, LP v. Alere, Inc., 76 F.4th 1376, 1385 (Fed. Cir. 2023) (explaining that the reply arguments properly relied on the same legal ground, the same prior art references, and same legal argument—the motivation to make the proposed changes to the prior art reference).” slip op. at 25

    Patent outcomesUS 9,008,483 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,008,483

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.