- U.S. Venture, Inc. v. Sunoco Partners Marketing & Terminals L.P.Rehearing deniedPTAB · Dec 17, 2020 · IPR2020-00728 · APJ Brent M Dougal · IPR · Rehearing
The Board denied rehearing, leaving in place its denial of institution for claims 16–17 based on the Fintiv factors and its § 314(a) discretion.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“When rehearing a decision on institution, the Board reviews the decision for an abuse of discretion. 37 C.F.R. § 42.71(c). An abuse of discretion may arise if the decision is based on an erroneous interpretation of law, if a factual finding is not supported by substantial evidence, or if an unreasonable judgment is made in weighing relevant factors. Star Fruits S.N.C. v. U.S., 393 F.3d 1277, 1281 (Fed. Cir. 2005); Arnold P’ship v. Dudas, 362 F.3d 1338, 1340 (Fed. Cir. 2004); In re Gartside, 203 F.3d 1305, 1315–16 (Fed. Cir. 2000). The burdens and requirements of a request for rehearing are stated in 37 C.F.R. § 42.71(d): The burden of showing a decision should be modified lies with the party challenging the decision. The request must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, or a reply. Thus, a request for rehearing is not an opportunity to present new arguments or evidence or merely to disagree with the panel’s assessment of the arguments or weighing of the evidence.” slip op. at 3
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for patent owner
“the evidence laid out an approximate time frame for when the trial would likely be held. Dec. 9 (citing Ex. 2003); see also id. at 8–9 (citing PO Resp. 35; Ex. 1026) (Discussing the Court’s Procedures and timeline for trial after the docket call). Thus, we determined that this factor favored denying institution under our analysis of the factors under Fintiv. Id. at 9.” slip op. at 4
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached
“Petitioner acknowledges that the proposed combination of the references relies on “us[ing] the cumulative totals of the flow rates of the unblended components in the Hoffman compensation process” (id.), however Patent Owner identifies that Hoffman appears to teach away from using the flow rates of the unblended components in its calculations because of the uncertainty in the flow rate of the blended line. Prelim. Resp. 19, 21– 22. Contrary to Petitioner’s position, it is not Patent Owner’s burden to show why “a person of ordinary skill in the art would be discouraged from measuring flow rates upstream for use in the Hoffman compensation process” (Reh. Req. 9), but rather, Petitioner bears the burden to show why a person of ordinary skill in the art would measure flow rates upstream for use in the Hoffman compensation process in view of the all of the teachings of the references (35 U.S.C. § 314(a) (Institution only authorized if “the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”)). Petitioner’s arguments do not show that we misapprehended or” slip op. at 8
- Claim Construction › Intrinsic evidence (Phillips canons) › Specification disavowal / 'present invention' languageNot reached
“argument concerning the construction of the term “in-line blending.” Id. at 13.” slip op. at 6
Claim construction§ 103 obviousnessDiscretionary denialPatents in suitUS 9,207,686 - Chemco Systems, L.P. v. RDP Technologies, Inc.Rehearing deniedPTAB · Jun 4, 2020 · IPR2019-01562 · APJ Jon B Tornquist · IPR · Rehearing
The Board denied Chemco’s rehearing request, leaving institution denied for claims 1, 2, 10, and 15 over Muzik because the petition did not construe claim 1(b).
RulingsRehearing decision- RehearingRehearing, deniedDenied
“A petition must set forth “[h]ow the challenged claim is to be construed.” 37 C.F.R. § 42.104(b)(3). This is particularly important when a claim term is ambiguous. Petitioner did not provide an express construction of claim 1(b) in the petition, or specifically address the interplay between this claim limitation and the other limitations of the claim. Thus, we could not have overlooked or misapprehended the claim construction arguments made in the request for rehearing. Accordingly, we deny Petitioner’s request for rehearing on this ground.” slip op. at 3
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner
“slurry tank via a delivery line and extracting a portion of the slurry delivered from the slurry tank via the delivery line and discharging said extracted portion of the slurry from said delivery line.” Ex. 1002, 5:29–32. Neither party proposed an express construction for this claim term. Dec. 5. In the Decision, we analyzed the language of claim 1(b), as well as “the interplay between claims 1(b) and 1(c),” and construed claim 1 to require that the “extracted portion” be discharged from “the delivery line” separate from “the rest of the slurry.” Id. at 9.” slip op. at 3
Claim constructionPatents in suitUS 8,133,401 - Teradata Operations, Inc. v. Berkeley*ieorRehearing deniedPTAB · Nov 5, 2019 · CBM2019-00013 · APJ Jon B Tornquist · CBM · Rehearing
The Board denied rehearing of its decisions denying institution of CBM review of the challenged claims in four proceedings, finding no overlooked or misapprehended matter.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“II. STANDARD FOR REHEARING Pursuant to 37 C.F.R. § 42.71(d): A party dissatisfied with a decision may file a single request for rehearing without prior authorization from the Board. The burden of showing a decision should be modified lies with the party challenging the decision. The request must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, or a reply. When reconsidering a decision on institution, we review the decision for an abuse of discretion. 37 C.F.R. § 42.71(c). An abuse of discretion exists where a “decision [i]s based on an erroneous conclusion of law or clearly erroneous factual findings, or . . . a clear error of judgment.” PPG Indus. Inc. v. Celanese Polymer Specialties Co., 840 F.2d 1565, 1567 (Fed. Cir. 1988).” slip op. at 3
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“the relational database management system to . . . calculate” as requiring that the recited calculations be performed “in the RDBMS.” Inst. Dec. 8–10. Petitioner did not provide an express construction for this claim term in the Petition. Id. at 7. For purposes of deciding whether to institute trial, and after reviewing the claim language, the written description of the involved patents, and the relevant prosecution history, we adopted Patent Owner’s proposed construction. Id. at 8–10. Petitioner contends the construction adopted by the panel is incorrect because the claims on their face are broad enough to encompass “[a]ny use of the RDBMS,” for example using the RDBMS to” slip op. at 3
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“As explained in the Institution Decision, Petitioner’s arguments with respect to whether the challenged claims recite a technological feature that is novel and unobvious over the prior art relied on a claim construction that we did not adopt. Inst. Dec. 13–14. As such, the Petition did not adequately explain why it was not novel and obvious to use an RDBMS itself to perform the claimed profit calculations. Id. at 14. Although Petitioner disagrees with our conclusion, and now cites to disparate portions of the Petition to support its argument, a mere disagreement is not the proper basis for rehearing, and a rehearing request is not the proper vehicle to make arguments that were not clearly set forth in the Petition.” slip op. at 5
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached
“Petitioner also contends that the Board failed to consider its obviousness arguments. Req. Reh’g 14–15. We considered these arguments, but ultimately found them unpersuasive. Inst. Dec. 13–14. In short, Petitioner presumed a construction of “using the relational database management system to . . . calculate” that we did not adopt, and did not explain sufficiently why the prior art of record would have rendered the challenged claims obvious under the adopted claim construction. A request for rehearing is not an opportunity to remedy these deficiencies.” slip op. at 7
Claim construction§ 103 obviousnessPatents in suitUS 7,882,137 - Teradata Operations, Inc. v. Berkeley*ieorRehearing deniedPTAB · Nov 5, 2019 · CBM2019-00009 · APJ Jon B Tornquist · CBM · Rehearing
The Board denied Teradata’s rehearing requests, leaving in place the denials of CBM review based on the petition’s failure to show the challenged claims unpatentable under the adopted construction.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“II. STANDARD FOR REHEARING Pursuant to 37 C.F.R. § 42.71(d): A party dissatisfied with a decision may file a single request for rehearing without prior authorization from the Board. The burden of showing a decision should be modified lies with the party challenging the decision. The request must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, or a reply. When reconsidering a decision on institution, we review the decision for an abuse of discretion. 37 C.F.R. § 42.71(c). An abuse of discretion exists where a “decision [i]s based on an erroneous conclusion of law or clearly erroneous factual findings, or . . . a clear error of judgment.” PPG Indus. Inc. v. Celanese Polymer Specialties Co., 840 F.2d 1565, 1567 (Fed. Cir. 1988).” slip op. at 3
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner
“the relational database management system to . . . calculate” as requiring that the recited calculations be performed “in the RDBMS.” Inst. Dec. 8–10. Petitioner did not provide an express construction for this claim term in the Petition. Id. at 7. For purposes of deciding whether to institute trial, and after reviewing the claim language, the written description of the involved patents, and the relevant prosecution history, we adopted Patent Owner’s proposed construction. Id. at 8–10. Petitioner contends the construction adopted by the panel is incorrect because the claims on their face are broad enough to encompass “[a]ny use of the RDBMS,” for example using the RDBMS to” slip op. at 3
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“the relational database management system to . . . calculate” as requiring that the recited calculations be performed “in the RDBMS.” Inst. Dec. 8–10. Petitioner did not provide an express construction for this claim term in the Petition. Id. at 7. For purposes of deciding whether to institute trial, and after reviewing the claim language, the written description of the involved patents, and the relevant prosecution history, we adopted Patent Owner’s proposed construction. Id. at 8–10. Petitioner contends the construction adopted by the panel is incorrect because the claims on their face are broad enough to encompass “[a]ny use of the RDBMS,” for example using the RDBMS to” slip op. at 3
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“As explained in the Institution Decision, Petitioner’s arguments with respect to whether the challenged claims recite a technological feature that is novel and unobvious over the prior art relied on a claim construction that we did not adopt. Inst. Dec. 13–14. As such, the Petition did not adequately explain why it was not novel and obvious to use an RDBMS itself to perform the claimed profit calculations. Id. at 14. Although Petitioner disagrees with our conclusion, and now cites to disparate portions of the Petition to support its argument, a mere disagreement is not the proper basis for rehearing, and a rehearing request is not the proper vehicle to make arguments that were not clearly set forth in the Petition.” slip op. at 5
Claim construction§ 103 obviousnessPatents in suitUS 7,882,137 - BASF Corporation v. Ingevity South Carolina, LLCRehearing deniedPTAB · Oct 17, 2019 · IPR2019-00202 · APJ Christopher L Crumbley · IPR · Rehearing
The Board denied rehearing and maintained its denial of institution because BASF did not show a reasonable likelihood that any challenged claim was unpatentable.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“when rehearing a decision on a petition to institute trial the Board “will review the decision for an abuse of discretion.” 37 C.F.R. § 42.71(c). “An abuse of discretion occurs where the decision is based on an erroneous interpretation of the law, on factual findings that are not supported by substantial evidence, or represents an unreasonable judgment in weighing relevant factors.” Lacavera v. Dudas, 441 F.3d 1380, 1383 (Fed. Cir. 2006) (quoting Star Fruits S.N.C. v. United States, 393 F.3d 1277, 1281 (Fed. Cir. 2005)). The party requesting rehearing has the burden of showing the decision should be modified, and “[t]he request must specifically identify all” slip op. at 2
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“In our Decision, we reviewed BASF’s arguments and submitted evidence, and concluded that the record lacked sufficient support for these three links in BASF’s logical chain. First, we found that BASF had not provided evidence “why a person of skill in the art would have been led by Park’s strength requirement for an air intake system to select Formulation D” for the evaporative emissions systems that are the focus of the ’844 patent. Dec. 17–18. Second, we found no reason to conclude that, even if a person of ordinary skill in the art would have selected Park’s Formulation D to use in an evaporative emissions system, the resulting honeycomb would have the 73.8% voidages that Park considers desirable. Id. at 18–19. Finally, we found unsupported Mr. Lyons’ testimony that BAX 1500 carbon was the highest-capacity carbon known in the art at the time of the invention. Id. at 19–20. Each of these independent findings was sufficient to lead us to conclude that BASF had not shown that a system resulting from the use of Park’s honeycomb filter in an evaporative emissions system would necessarily have an IAC below 35 g/L, as required by the claims. Id. at 20–21. As such, we found that BASF had not established a reasonable likelihood that any claim of the ’844 patent was unpatentable.” slip op. at 4
- Expert testimonyPetitioner expert discountedDecided for patent owner
“insufficient to support a reasonable likelihood of inherency on this record. To justify a conclusion of inherency in an obviousness inquiry, “the limitation at issue necessarily must be present, or the natural result of the combination of elements explicitly disclosed by the prior art.” Par Pharm., Inc. v. TWI Pharm., Inc., 773 F.3d 1186, 1196 (Fed. Cir. 2014). In other words, even were we to accept BASF’s contentions that a person of ordinary skill would have formed a filter using Park’s Formulation D and having 73.8% voidages, we would also have to conclude that the artisan would have had reason to select a carbon that necessarily would result in an IAC below 35 g/L. And, as we stated in our Decision, the reason for selecting a particular carbon cannot be based on the very IAC property that is allegedly inherent. Dec. 14 (“properties that are inherent—and, therefore, possibly unknown—cannot be used as the basis for this motivation unless they were expected.”) (citing Honeywell Int’l v. Mexichem Amanco Holding, 865 F.3d 1348 (Fed. Cir. 2017)). BASF’s Petition discussed two available carbons, BAX 1100 and BAX 1500, because they were referenced in the specification of the ’844 patent. Pet. 23. But there is insufficient evidence in the record why these were the two carbons that a person of ordinary skill in the art would have found it obvious to select from among the carbons that were available at the time of the invention, and the record is silent as to whether other carbons, if selected, would have necessarily resulted in the same IAC or lower. As we observed in our Decision, all that BASF presented on this point was the unsupported testimony of its expert that BAX 1500 had “the highest possible IAC known at the time of the ’844 patent.” Dec. 19–20 (citing Ex. 1003 ¶ 111). Again, BASF cites our rules, contending that we erred by not viewing a disputed issue of material fact in the light most favorable to it. Req. Reh’g 14. In particular, BASF notes our statement in the Decision acknowledging that “BAX 1500 certainly has the highest IAC of any carbon disclosed in the ’844 patent,” and argues that this alone is “evidence in the record that BAX-1500 was the highest-capacity carbon available at the time.” Id. (citing Dec. 20). But the disclosure of two particular carbons in the record says nothing about the existence—or lack thereof—of other carbons. In other words, as we stated in the Decision, “on this record we cannot extrapolate beyond [the] disclosure to all activated carbons known at the time of the invention.” Dec. 20. The issue is not one of viewing a disputed issue of fact in the light most favorable in BASF; rather, it is an issue of BASF asking us to conclude from the disclosure of two carbons in the ’844 patent that these are the carbons that a person of ordinary skill in the art, upon reading Park, would have selected. The record is insufficient to reach such a conclusion, and we did not err in deciding so.” slip op. at 9
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable
“would have selected Park’s Formulation D when creating a filter for use as a subsequent adsorption volume, BASF contends that we misapprehended its evidence supporting such a selection. Id. at 9–12. BASF notes its argument was that a person of ordinary skill in the art would have selected Formulation D “because it is the only formulation that meets Park’s explicit requirements for the air intake application: a carbon content of 25–35% by weight and an axial crushing strength from 1200–1600 psi.” Id. at 10 (citing Pet. 33–34). But BASF’s argument misses the point of our conclusion in the Decision, which was that the record contained no evidence that the requirements of an air intake application, as discussed by Park, were the same as the requirements of the evaporative emissions application that is the focus of the ’844 patent and the primary prior art references in each combination. In other words, while a person of ordinary skill in the art might have been led to Formulation D if trying to create a filter for an air intake system, the record contains no persuasive evidence that the same is true of the artisan creating an evaporative emissions system. Indeed, as we noted in the Decision, the only evidence on this point is to the contrary, and comes from Ingevity’s expert witness Dr. Ritter. As we noted, “Dr. Ritter testifies that evaporative emission systems and air intake systems are designed for use with different vapor concentrations and, more importantly, different flow rates.” Dec. 17 (citing Ex. 2001 ¶¶ 43–44).” slip op. at 5
§ 102 anticipation§ 103 obviousness - Nitro Fluids, L.L.C. v. Cameron International CorporationRehearing deniedPTAB · Oct 15, 2019 · IPR2019-00804 · APJ Jon B Tornquist · IPR · Rehearing
The Board denied the rehearing request and maintained denial of institution for claims 1–15 under § 325(d) based on Kajaria and Guidry.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“II. STANDARD FOR REHEARING Pursuant to 37 C.F.R. § 42.71(d): A party dissatisfied with a decision may file a single request for rehearing without prior authorization from the Board. The burden of showing a decision should be modified lies with the party challenging the decision. The request must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, or a reply. When reconsidering a decision on institution, we review the decision for an abuse of discretion. 37 C.F.R. § 42.71(c). An abuse of discretion exists where a “decision [i]s based on an erroneous conclusion of law or clearly erroneous factual findings, or . . . a clear error of judgment.” PPG Indus. Inc. v. Celanese Polymer Specialties Co., 840 F.2d 1565, 1567 (Fed. Cir. 1988).” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dInstitution denied
“Dickinson & Co. v. B. Braun Melsungen AG, Case IPR2017-01586, Paper 8 at 17–18 (PTAB Dec. 15, 2017) (precedential in relevant part) and determined that the balance of these factors favored denial of the Petition under 35 U.S.C. § 325(d). Dec. 11–23. As part of this analysis, we determined that: Kajaria was previously presented to the office during prosecution and was the basis for a rejection by the Examiner; Petitioner and the Examiner relied on the same disclosures of Kajaria to support their arguments; Petitioner did not sufficiently point out how the Examiner erred in his evaluation of Kajaria; and the declaration testimony of Mr. Ely did not warrant reconsideration of the prior art previously analyzed by the Examiner. Id. at 12–22.” slip op. at 3
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Other
“fracturing tree, wherein the single outlet is coupled to the fracturing tree by a single fluid conduit that is the only fluid conduit connecting the skid apparatus in fluid communication with the well at which the one fracturing tree is positioned. Ex. 1001, 7:6–30.” slip op. at 3
- Obviousness (§103) › Motivation to combine / reasonable expectation of successOther
“obviousness ground relies solely on modification of distribution modules 42. Req. Reh’g 14. According to Petitioner, the Petition specifically alleges that “it would have been obvious to modify any module, including specifically module 40, to use a single manifold, to support only a single valve group, for delivery of fluid to a single well, via a single fluid conduit.” Id. (citing Pet. 35–42, 49–52, 56–57; Ex. 1002 ¶¶ 92, 96, 99, 102, 103, 122, 124–126, 128, 138). We did not misunderstand or misapprehend this argument; indeed, we noted its logical appeal. Dec. 21 n.10. We instead declined to credit the inference underpinning this argument, i.e., that a single-manifold embodiment would use a single fluid conduit, because the only reference of record having a single distribution module coupled to a single manifold had two fluid conduits extending from the distribution module to the well. Id. Accordingly, we are not persuaded that we misunderstood or overlooked Petitioner’s obviousness arguments.” slip op. at 11
§ 102 anticipation§ 103 obviousnessDiscretionary denialPatents in suitUS 9,903,190 - Teradata Operations, Inc. v. Berkley*ieorRehearing deniedPTAB · Sep 27, 2019 · CBM2019-00015 · APJ Josiah C Cocks · CBM · Rehearing
The Board denied Teradata’s rehearing request, leaving institution denied for claims 1, 3–5, and 10–26 because it had not shown the patent was not a technological invention.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“A request for rehearing is not an opportunity for a petitioner to respond to an institution decision to make a better argument for any given matter than that which was initially presented in a petition. Notably, in now challenging the claim construction of the above-noted term, Petitioner does not cite or identify any portion of the Petition that was misapprehended or overlooked. Instead, Petitioner seeks to make a better case through citation to portions of the record that were not previously relied upon. For instance, Petition now points to content of the prosecution history (Ex. 1002) pertaining to claim amendments made during prosecution that Petitioner would have us infer as demonstrating that the applicant “knew” how to limit the claims to calculations “in the RDBMS” but chose not to. Req. Reh’g 2– 3. That was not an argument on which Petitioner previously relied, and thus was not an argument that we could have misapprehended or overlooked. Moreover, in now making the argument, Petitioner seemingly discounts the plain language of the claims in specifically reciting “using” the RDBMS “to independently calculate” marginal values of profit. Ex. 1001, 30:61–63. We have considered Petitioner’s arguments pertaining to claim construction, but are not persuaded that they demonstrate that we misapprehended or overlooked content of the Petition that warrants a change in the claim constructions that were identified in the Institution Decision.” slip op. at 4
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Petition, and which we found unpersuasive. As we explained in the Institution Decision, we were not satisfied that “bulk citations” to large portions of the record provided “meaningful explanation that the prior art shows an RDBMS, itself, that is performing the necessary profit calculations.” Inst. Dec. 13–14. We were not persuaded that Petitioner’s assessment of the prior art showed adequately that the “requirements of limitation 1[d] pertaining to independent profitability calculation by an RDBMS are non-novel or obvious.” Id. at 15. Although Petitioner may disagree with our determination in that respect, mere disagreement is not the proper basis for rehearing.” slip op. at 5
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“For purposes of deciding whether to institute trial, we adopted the Patent Owner’s construction of claim element 1[d(i)] (id. at 8), concluding that the construction was supported by “(1) the ’521 patent itself [see, e.g., id. at 15 (citing Ex. 1001, 10:42–47)]; (2) the testimony of Patent Owner’s declarant [see, e.g., id. at 14–16 (referencing Ex. 2001, ¶¶ 58–67, 75, 81– 85)]; and (3) the prosecution history of the ’521 patent [see, e.g., id. at 16” slip op. at 3
- BurdenDecided for patent owner
“Page 12 of the Petition, however, makes no connection between Blain’s teachings and the pertinent claim limitation 1[d]. There is no reasonable inference from the above-noted content of page 12 of the Petition that paragraph 85 of Dr. Weber’s testimony should be evaluated in the context of viewing an RDBMS as independently performing profitability calculations. We simply were not persuaded that the Petition and the applicable portions of Dr. Weber’s testimony cited therein, including paragraph 85, adequately addressed the features required by claims limitation 1[d].” slip op. at 7
Claim constructionPatents in suitUS 7,596,521 - Teradata Operations, Inc. v. Berkley*ieorRehearing deniedPTAB · Sep 27, 2019 · CBM2019-00016 · APJ Josiah C Cocks · CBM · Rehearing
The Board denied Teradata’s rehearing request and left in place denial of CBM review of claims 2, 6-9, and 27-32 because it had not shown the patent was not for a technological invention.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“(d) Rehearing. . . . The burden of showing a decision should be modified lies with the party challenging the decision. The request must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, or a reply.” slip op. at 2
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Petition, and which we found unpersuasive. As we explained in the Institution Decision, we were not satisfied that “bulk citations” to large portions of the record provided “meaningful explanation that the prior art shows an RDBMS, itself, that is performing the necessary profit calculations.” Inst. Dec. 14. We were not persuaded that Petitioner’s assessment of the prior art showed adequately that the “requirements of limitation 1[d] pertaining to independent profitability calculation by an RDBMS are non-novel or obvious.” Id. at 16. Although Petitioner may disagree with our determination in that respect, mere disagreement is not the proper basis for rehearing. We also concluded that record evidence conveyed that the claims solved a technical problem with a technical solution in providing “a distinctive software-based process that harnesses benefits to computer performance.” Id. at 17. In reaching that conclusion, we rejected Petitioner’s premise that the claims were simply directed to solving a business problem using a business solution. Petitioner does not address adequately the issue of improved computer performance, or identify any matter that we misapprehended or overlooked in determining that record evidence reasonably conveyed that such improved computer performance emerges from the method of claim 1.” slip op. at 5
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“For purposes of deciding whether to institute trial, we adopted the Patent Owner’s construction of claim element 1[d(i)] (id. at 9), concluding that the construction was supported by “(1) the ’521 patent itself [see, e.g., id. at 16–17 (citing Ex. 1001, 10:42–47)]; (2) the testimony of Patent Owner’s declarant [see, e.g., id. at 15–17 (referencing Ex. 2001, ¶¶ 58–67, 75, 81–85)]; and (3) the prosecution history of the ’521 patent [see, e.g., id.” slip op. at 3
- BurdenDecided for patent owner
“Page 13 of the Petition, however, makes no connection between Blain’s teachings and the pertinent claim limitation 1[d]. There is no reasonable inference from the above-noted content of page 13 of the Petition that paragraph 85 of Dr. Weber’s testimony should be evaluated in the context of viewing an RDBMS as independently performing profitability calculations. We simply were not persuaded that the Petition and the applicable portions of Dr. Weber’s testimony cited therein, including paragraph 85, adequately addressed the features required by claims limitation 1[d].” slip op. at 7
Claim constructionPatents in suitUS 7,596,521 - Aquestive Therapeutics, Inc. v. Neurelis, Inc.Rehearing deniedPTAB · Sep 27, 2019 · IPR2019-00451 · APJ Jamie T Wisz · IPR · Rehearing
The Board denied Patent Owner’s rehearing request, finding no abuse of discretion in instituting review of claims 1–36 because Patent Owner did not show entitlement to the provisional priority date.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“II. ANALYSIS Pursuant to 37 C.F.R. § 42.71(d): A party dissatisfied with a decision may file a single request for rehearing without prior authorization from the Board. The burden of showing a decision should be modified lies with the party challenging the decision. The request must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, or a reply. When reconsidering a decision on institution, we review the decision for an abuse of discretion. 37 C.F.R. § 42.71(c). An abuse of discretion exists where a “decision [i]s based on an erroneous conclusion of law or clearly erroneous factual findings, or . . . a clear error of judgment.” PPG Indus. Inc. v. Celanese Polymer Specialties Co., 840 F.2d 1565, 1567 (Fed. Cir. 1988).” slip op. at 2
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date, deniedDecided for petitioner
“burden of going forward to show that there is invalidating prior art. Dynamic Drinkware, 800 F.3d at 1379. As discussed in our Decision, Petitioner satisfied its initial burden of production on the issue of whether Gwozdz is prior art by establishing that Gwozdz is entitled to the effective filing date of the Gwozdz provisional. Decision 7. Therefore, Gwozdz is prior art to the ’876 patent under 35 U.S.C. § 102(e)(1) unless Patent Owner can show that the ’876 patent is entitled to the effective filing date of its provisional application (“the ’558 provisional”). Id. Thus, the burden of production shifts to Patent Owner, who must show not only the existence of earlier applications, but also how the written description in the earlier applications supports the challenged claims. Dynamic Drinkware, 800 F.3d at 1379–80. “[T]o gain the benefit of the filing date of an earlier application 4 under 35 U.S.C. § 120, each application in the chain leading back to the earlier application must comply with the written description requirement of 35 U.S.C. § 112.” Zenon Envtl., Inc. v. U.S. Filter Corp., 506 F.3d 1370, 1378 (Fed. Cir. 2007) (quoting Lockwood v. Am. Airlines, Inc., 107 F.3d 1565, 1571 (Fed. Cir. 1997)); see also In re Hogan, 559 F.2d 595, 609 (CCPA 1977) (“[T]here has to be a continuous chain of copending applications each of which satisfies the requirements of § 112 with respect to the subject matter presently claimed.” (alteration in original) (quoting In re Schneider, 481 F.2d 1350, 1356 (CCPA 1973))). Thus, as discussed in our Decision, Patent Owner must show that each application in the priority chain1 makes the requisite disclosure of subject matter; otherwise, the ’876 patent is not entitled to the benefit of the filing date of the ’558 provisional. Decision 7 n.6. On this record, Patent Owner fails to satisfy its burden of production to show entitlement to an earlier filing date. All of Patent Owner’s arguments are focused on the alleged deficiencies with Petitioner’s contentions regarding the disclosure of alkyl glycosides in the ’558 provisional. Prelim. Resp. 24–27. Patent Owner offers no analysis demonstrating that every patent application along the priority chain conveys with reasonable clarity to those skilled in the art that the inventors were in possession of each limitation of each of the challenged claims, as well as the 1 In this case, the priority chain for the ’876 patent includes a provisional application and a continuation-in-part application. Decision 6. 5 claimed invention as a whole. See Lockwood, 107 F.3d at 1572. Therefore, on this record, Patent Owner has not demonstrated that the claims of the ’876 patent are entitled to the priority date of the ’558 provisional.” slip op. at 4
§ 102 anticipationPatents in suitUS 9,763,876 - Magellan Midstream Partners L.P. / Powder Springs Logistics, LLC v. Sunoco Partners Marketing & Terminals L.P.Rehearing deniedPTAB · May 14, 2019 · IPR2019-00025 · APJ Jon B Tornquist · IPR · Rehearing
The Board denied Patent Owner’s rehearing requests, leaving institution in place and reiterating that “gasoline” preliminarily includes refinery streams or stocks.
RulingsRehearing decision- RehearingRehearing, deniedDenied
“decision should be modified, and the request for rehearing must specifically identify all matters the party believes the Board misapprehended or overlooked. 37 C.F.R. § 42.71(d).” slip op. at 2
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“Patent Owner’s argument that “gasoline” is limited to “finished gasoline that may be used as fuel,” and determined that the term is broad enough to encompass the component gasoline streams of Bajek and the gasoline stocks of Hass. Dec. on Inst. 10–14, 22, 26 (“In particular, on this record, we determine that the term ‘gasoline’ is broad enough to encompass the gasoline stocks of Hass . . . .”). As this conclusion was sufficient to determine whether Petitioner demonstrated a reasonable likelihood of prevailing with respect to at least one claim of the ’948 and ’548 patents, we declined to determine exactly what other types of petroleum products would be considered “gasoline” in the art. Id. at 15.” slip op. at 3
- Prior constructionPrior construction not adoptedDecided for petitioner
“[v]arious types of refined petroleum that are used as fuel.” Ex. 2004, 35. In the Institution Decision, we determined that this construction was “of limited assistance” in this proceeding because (1) the ’948 and ’548 patents were not at issue in the case when the district court rendered its claim construction, and (2) the construction was adopted at the request of the parties, and was not based on a detailed analysis of the intrinsic record. Dec. on Inst. 14. slip op. at 5
Claim constructioncites PhillipsPatents in suitUS 9,606,548
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.