  • PTAB · May 13, 2026 · IPR2025-00029 · APJ Zhenyu Yang · IPR · Final written decision

    Claims 1–12 and 14–19 are unpatentable as obvious over the listed combinations; Petitioner’s motion to strike is denied.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “for purposes of this Decision, we find a POSA would have had a Ph.D. in molecular biology, molecular genetics, bioinformatics, biochemistry, or a related field. Alternatively, a POSA would have had a B.S. or M.S. degree with three to five years of experience working in any of those fields. Additionally, the POSA would have had experience with NGS sequencing methods and a working knowledge of how those methods functioned.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. [§] 282(b).” 37 C.F.R. § 42.100(b) (2020). Under that standard, the words of a claim “are generally given their ordinary and customary meaning,” which is “the meaning that the term would have to a person of ordinary skill in the art in question at the time of the invention, i.e., as of the effective filing date of the patent application.” Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). Claim terms need only be construed to the extent necessary to resolve the controversy. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011). On this record and for purposes of this Decision, we see no need to construe any claim term expressly.” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner
    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › Teaching awayTeaching away not foundDecided for petitioner
    Patent outcomesUS 10,876,108 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,876,108
  • PTAB · Feb 10, 2026 · IPR2025-00687 · APJ Kristina M Kalan · IPR · Remand

    On remand, the Board instituted IPR on claims 1–8 and 10–18 over all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsRemand decision
    • RemandInstituted

      “Paper 34, 1 (requesting “Director Review of the Director’s August 22, 2025 Decision Referring the Petition to the Board (‘Referral Decision’)”). Patent Owner argued that institution of IPR2025-00687 and IPR2025-00688 “should be discretionarily denied.” Id. at 5. Petitioner opposed. Paper 37. The Director granted review and found that “granting institution of two petitions that each challenge the same claims of the ’370 patent and ’218 patent 2” was an “abuse[] of discretion.” Paper 40, 1. The Director remanded the cases “to the Board panel to determine which of the two petitions challenging each of the ’370 and ’218 patents to institute.” Id. at 3. Pursuant to the Director’s instruction that we choose only one of the two petitions challenging the ’370 patent to institute, and for the reasons set forth below, we choose to institute review of the ’370 patent in this Petition, and not in IPR2025-00688.” slip op. at 3

    • PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner

      “the proceeding is filed more than 1 year after the date on which the petitioner, real party in interest, or privy of the petitioner is served with a complaint alleging infringement of the patent.” 35 U.S.C. § 315(b). Petitioner bears the burden of demonstrating compliance with 35 U.S.C. § 312(a)(2) and § 315(b). See, e.g., Ventex Co., Ltd. v. Columbia Sportswear N. Am., Inc., IPR2017-00651, Paper 152 (PTAB Jan. 24, 2019)” slip op. at 9

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “may be considered, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC, Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995). Furthermore, the prior art itself can reflect the appropriate level of ordinary skill in the art. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner “[does] not, at this time, contend that any term requires construction,” and instead, states that “[a]ll terms have been accorded their plain and ordinary meaning.” Pet. 11 (citing Ex. 1002 ¶¶ 212–215). Patent Owner asserts that it “does not presently propose any constructions,” but discusses the Board’s claim construction in IPR2020- 00834, Paper 18, 7–8. Prelim. Resp. 7. Claim terms need only be construed to the extent necessary to resolve the controversy. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011). On this record and for purposes of this Decision, we see no need to construe any claim term expressly.” slip op. at 14

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 10,933,370
  • PTAB · Feb 10, 2026 · IPR2025-00717 · APJ Zhenyu Yang · IPR · Remand

    On remand, the Board instituted IPR of claims 1–4 and 6–26 on all six asserted obviousness grounds, finding a reasonable likelihood of prevailing.

    RulingsRemand decision
    • Director reviewDirector review, grantedOther

      “The Director granted Director Review, finding that the panel “abused its discretion in granting institution of two petitions that each challenge the same claims” of the ’218 patent. Paper 39, 2. The Director vacated the DI and remanded the case “to the Board panel to determine which of the two petitions” to institute. Id. at 4.” slip op. at 4

    • Parallel petitionsDecided for petitioner

      “On November 4, 2025, we instituted inter partes review of all challenged claims based on all the grounds raised in the Petition. Paper 35 (“DI”). In the DI, we noted that “Petitioner filed an explanation regarding the necessity of multiple petitions,” and “Patent Owner d[id] not challenge that multiple petitions are necessary” in the Preliminary Response. Paper 23, 3 n.3.” slip op. at 3

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons provided below, we determine Petitioner has satisfied the threshold requirement set forth in 35 U.S.C. § 314(a). Therefore, we institute inter partes review of all challenged claims based on all the grounds raised in this Petition.3” slip op. at 4

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner asserts that “[a] person of ordinary skill in the art [“POSITA”] would have at least a bachelor’s degree in chemical engineering, mechanical engineering, or a related field of study with at least two years of experience implementing pollution control in power generation plants for natural gas, coal, and/or industrial waste incineration.” Pet. 11 (citing Ex. 1002 ¶¶ 48–51). Patent Owner does not dispute the level of ordinary skill in the art. See generally Prelim Resp. For purposes of this Decision, we adopt Petitioner’s proposed definition of a POSITA because it is consistent with the skill level reflected in the disclosures of the ’218 patent and prior art. See Okajima, 261 F.3d at 1355 (the prior art may reflect an appropriate level of skill in the art).” slip op. at 10

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR
    Patents in suitUS 10,926,218
  • PTAB · Oct 14, 2025 · IPR2025-00688 · APJ Avelyn M Ross · IPR · Institution

    The Board instituted IPR on claims 1–18 on all asserted grounds, finding a reasonable likelihood that Petitioner would prevail on at least one challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner

      “The mere existence of some relationship between a petitioner and another entity, however, is not sufficient to place that petitioner in privity with that entity. Google LLC v. DDC Technology, LLC, IPR2023-00707, Paper 27 at 37 (PTAB Oct. 25, 2023). Instead, that relationship must be related to an earlier lawsuit and be “sufficiently close that it can be fairly said that the petitioner had a full and fair opportunity to litigate the validity of the patent in that lawsuit” or the evidence must show “the petitioner is simply serving as a proxy to allow another party to litigate the patent validity question that the other party raised in an earlier-filed litigation.” WesternGeco, 889 F.3d at 1319.” slip op. at 10

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner asserts that “[a] person of ordinary skill in the art [“POSITA”] would have at least a bachelor’s degree in chemical engineering, mechanical engineering, or a related field of study with at least two years of experience implementing pollution control in power generation plants for natural gas, coal, and/or industrial waste incineration.” Pet. 11 (citing Ex. 1002 ¶¶ 48–51). Patent Owner does not dispute the level of ordinary skill in the art. See generally Prelim Resp. For purposes of this Decision, we adopt Petitioner’s proposed definition of a person of ordinary skill in the art because it is consistent with the skill level reflected in the disclosures of the ’370 patent and prior art. See Okajima, 261 F.3d at 1355 (the prior art may reflect an appropriate level of skill in the art).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner “do[es] not, at this time, contend that any term requires construction,” and instead, states that “[a]ll terms have been accorded their plain and ordinary meaning.” Pet. 10 (citing Ex. 1002 ¶¶ 212–215). Patent Owner does not propose any constructions at this time. See generally Prelim. Resp. Claim terms need only be construed to the extent necessary to resolve the controversy. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011). On this record and for purposes of this Decision, we see no need to construe any claim term expressly.” slip op. at 13

    • Disclosure Requirements (§112) › Written description (Ariad)Written description inadequateDecided for petitioner

      “We are not persuaded by this argument. The Federal Circuit has instructed that [e]ntitlement to a filing date does not extend to subject matter which is not disclosed, but would be obvious over what is expressly disclosed. It extends only to that which is disclosed. While the meaning of terms, phrases, or diagrams in a disclosure is to be explained or interpreted from the vantage point of one skilled in the art, all the limitations must appear in the specification. The question is not whether a claimed invention is an obvious variant of that which is disclosed in the specification. Rather, a prior application itself must describe an invention, and do so in sufficient detail that one skilled in the art can clearly conclude that the inventor invented the claimed invention as of the filing date sought. Lockwood, 107 F.3d at 1571–72. Here, what “a POSITA would understand,” without disclosure in the specification, is insufficient to show written-description support. Prelim. Resp. 24. Thus, on this record, and for purposes of institution, Patent Owner has not shown that the Provisional Application provides sufficient support for adding the claimed genus to the coal. 3. Summary In sum, on this record, Patent Owner has not shown that either the Provisional Application or the Pre-2018 Applications provide sufficient written-description support for the challenged claims. As a result, we determine that the ’370 patent cannot claim priority to the Provisional Application. Thus, all asserted prior art qualifies as prior art.” slip op. at 25

    Claim construction§ 102 anticipation§ 112 disclosurecites Phillips
    Patents in suitUS 10,933,370
  • PTAB · Oct 14, 2025 · IPR2025-00687 · APJ Avelyn M Ross · IPR · Institution

    The Board instituted inter partes review of claims 1–8 and 10–18 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner

      “Based on the current record, we determine that the Petition is not time-barred. The ’370 patent was not part of the 2019 Delaware lawsuit that forms the basis of Patent Owner’s time-bar allegations. And, as Petitioner explains, when the ’370 patent was asserted in July 2024, Petitioner filed this request for inter partes review about seven months later, i.e., within the one-year period. Furthermore, Patent Owner does not allege which unnamed entity is in privity with Petitioner or provide any details of the relationship that establishes privity. Nor does Patent Owner direct our attention to record evidence that would support its allegations. Therefore, without more, we determine that the Petition is not time-barred.” slip op. at 11

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “may be considered, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC, Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995). Furthermore, the prior art itself can reflect the appropriate level of ordinary skill in the art. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Claim terms need only be construed to the extent necessary to resolve the controversy. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011). On this record and for purposes of this Decision, we see no need to construe any claim term expressly.” slip op. at 13

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “The current record supports that Petitioner’s combination of Vosteen589 with Starns and with Mass-EPA would have been “the mere application of a known technique to a piece of prior art ready for the improvement.” KSR, 550 U.S. at 401. Indeed, “if a technique has been used to improve one device, and a person of ordinary skill in the art would recognize that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond that person’s skill.” Id. Patent Owner does not allege that the combination was beyond the skill level of a person of ordinary skill in the art at the time of the alleged invention. See generally Prelim. Resp. Thus, Petitioner has provided sufficient reasoning with rational underpinnings to explain why a skilled artisan would have modified the teachings of the applied references. See KSR, 550 U.S. at 418.” slip op. at 21

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 10,933,370
  • PTAB · Oct 9, 2025 · IPR2025-00425 · APJ Kristina M Kalan · IPR · Institution

    The Board instituted IPR on all challenged claims and all asserted grounds, finding a reasonable likelihood that Petitioner would prevail on at least one claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner

      “After reviewing the evidence of record, we are persuaded the instant Petition is not time-barred as to the Chem-Mod Purchasers. Generic indemnity agreements are insufficient, without more, to establish privity. 9 Petitioner asserts that the supply agreements between the Chem-Mod Purchasers and Chem-Mod expired in 2021. For the reasons discussed herein, we determine that the language of these agreements does not establish privity. In the event Patent Owner maintains its argument that the Chem-Mod Purchasers are in privity with Chem-Mod, the parties should address the legal impact, if any, of the expiration of these agreements on Patent Owner’s arguments. WesternGeco LLC, 889 F.3d at 1321 (a “contractual and fairly standard customer-manufacturer relationship regarding the accused product” does not suggest, “without more, that the parties were litigating . . . [an] IPR[] as proxies for the other.”). The only relationship alleged to exist between Chem-Mod, its affiliates, and the Chem-Mod Purchasers is that of a supplier-customer relationship. As part of that relationship, the parties entered into supply agreements that included an indemnification provision for the purchased products. Exs. 2037–2042 (discussed at Sur-reply 7–8). We acknowledge, but disagree with, Patent Owner’s argument that the terms of the indemnity “specifically targeted” the activities at the “heart of the alleged infringement.” Sur-reply 7–8. Rather, the indemnification language in these agreements appears to be standard and typical of supply agreements. See Ex. 2037, 26;10 Ex. 2038, 10–12; Ex, 2039, 10–12; Ex. 2040, 10–12; Ex. 2041, 10–12; Ex. 2042, 24–27. Such language, without more, “does not amount to a sufficiently-close relationship to warrant finding . . . privity.” WesternGeco LLC, 889 F.3d at 1321–22.” slip op. at 11

    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “Patent Owner does not point to any record evidence that suggests the parties to the Delaware Action adequately represented the Chem-Mod Purchasers’ interests or that the Chem-Mod Purchasers controlled, directed, or funded the Delaware Action. See generally Prelim. Resp.; Sur-reply. Nor does Patent Owner suggest that the indemnified Petitioners are acting as a proxy for Chem-Mod and its affiliates in this case. Thus, the relationship with Chem-Mod, its affiliates, and the indemnified Petitioners was not “sufficiently close that it can be fairly said petitioner had a full and fair opportunity to litigate the validity of the patent in that lawsuit.” Google, IPR2023-00707, Paper 27 at 37. In sum, Petitioner bears the burden of demonstrating compliance with 35 U.S.C. § 312(a)(2) and § 315(b), but the current record does not provide sufficient reason to doubt Petitioner’s assertion that Chem-Mod was not “funding this petition, advising on strategy for this petition, or exercising any control over Petitioner’s decision to file the petition (or the arguments included therein).” Pet. 2; see also Reply 1–2. Indeed, the current record supports that the relationship between Chem-Mod and the Chem-Mod Purchasers was a standard supplier/customer relationship. Exs. 2037–2042. The evidence does not support that Chem- Mod negotiated a license on behalf of the Chem-Mod Purchasers or that the Chem-Mod Purchasers owned power plants that were at issue in the Delaware Litigation. Ex. 2009, 91; Ex. 2010, 107. Therefore, on this record, we determine that the relationship between Chem-Mod and the Chem-Mod Purchasers does not support that the Petition is time-barred.” slip op. at 15

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “may be considered, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995). Furthermore, the prior art itself can reflect the appropriate level of ordinary skill in the art. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). Petitioner asserts that a person of ordinary skill in the art (“POSITA”) “would have at least a bachelor’s degree in chemical engineering, mechanical engineering, or a related field of study with at least two years of experience implementing pollution control in power generation plants for natural gas, coal, and/or industrial waste incineration.” Pet. 12 (citing Ex. 1002 ¶¶ 48–51). Patent Owner does not dispute the level of ordinary skill in the art. See generally Prelim Resp. For purposes of this Decision, we adopt Petitioner’s proposed definition of a POSITA because it is consistent with the skill level reflected in the disclosures of the ’225 patent and prior art. See Okajima, 261 F.3d at 1355 (the prior art may reflect an appropriate level of skill in the art).” slip op. at 19

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner discusses the term “pyrolysis char” and states that, for the purposes of the Petition, it adopts and applies the Delaware court’s construction that “allow[s] for the pyrolysis char to be created within the combustor, so long as it is then present (and combusted) with the coal and the bromine compound.” Pet. 11–12 (citing Ex. 1071). Patent Owner does not appear to propose any express claim constructions. See generally Prelim. Resp. 7. Claim terms need only be construed to the extent necessary to resolve the controversy. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011). On this record and for purposes of this Decision, we see no need to construe any claim term expressly.” slip op. at 20

    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips
    Patents in suitUS 10,589,225
  • PTAB · Oct 6, 2025 · IPR2025-00423 · APJ Zhenyu Yang · IPR · Institution

    The Board instituted IPR on claims 1–4 and 6–29 on all asserted grounds, finding a reasonable likelihood of unpatentability based on the asserted obviousness and anticipation challenges.

    RulingsInstitution decision
    • PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner

      “After reviewing the evidence of record, we are persuaded the instant Petition is not time-barred as to the Chem-Mod Purchasers. Generic indemnity agreements are insufficient, without more, to establish privity. WesternGeco LLC, 889 F.3d at 1321 (“a contractual and fairly standard customer-manufacturer relationship regarding the accused product” does not suggest, “without more, that the parties were litigating . . . [an] IPR[] as proxies for the other.”). The only relationship alleged to exist between Chem-Mod, its affiliates, and the Chem-Mod Purchasers is that of a supplier-customer relationship. As part of that relationship, the parties entered into supply agreements that included an indemnification provision for the purchased products. Exs. 2037–2042 (discussed at Sur-reply 7–8).” slip op. at 12

    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “In sum, Petitioners bear the burden of demonstrating compliance with 35 U.S.C. § 312(a)(2) and § 315(b), but the current record does not provide sufficient reason to doubt Petitioners’ assertion that Chem-Mod was not “funding this petition, advising on strategy for this petition, or exercising any control over Petitioners’ decision to file the petition (or the arguments included therein).” Pet. 2; see also Reply 2. Indeed, the current record supports that the relationship between Chem-Mod and the Chem-Mod Purchasers was a standard supplier/customer relationship. Exs. 2037–2042. The evidence does not support that Chem-Mod negotiated a license on behalf of the Chem-Mod Purchasers or that the Chem-Mod purchasers owned power plants that were at issue in the Delaware Litigation. Ex. 2009, 91; Ex. 2010, 107. Therefore, on this record, we determine that the relationship between Chem-Mod and the Chem-Mod Purchasers does not support that the Petition is time-barred.” slip op. at 16

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a).” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “engineering, mechanical engineering, or a related field of study with at least two years of experience implementing pollution control in power generation plants for natural gas, coal, and/or industrial waste incineration.” Pet. 11–12 (citing Ex. 1002 ¶¶ 48–51). Patent Owner does not dispute the level of ordinary skill in the art. See generally Prelim Resp. For purposes of this Decision, we adopt Petitioners’ proposed definition of a POSITA because it is consistent with the skill level reflected in the disclosures of the ’430 patent and prior art. See Okajima, 261 F.3d at 1355 (the prior art may reflect an appropriate level of skill in the art).” slip op. at 21

    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips
    Patents in suitUS 10,668,430
  • PTAB · Oct 6, 2025 · IPR2025-00422 · APJ Zhenyu Yang · IPR · Institution

    Instituted IPR on claims 1–4 and 6–29 on all asserted grounds, finding a reasonable likelihood of prevailing on the asserted anticipation and obviousness challenges.

    RulingsInstitution decision
    • PTAB / AIA Trials › Real party in interest / privityNot time barredDecided for petitioner

      “Petition is not time-barred as to the Chem-Mod Purchasers. Generic indemnity agreements are insufficient, without more, to establish privity. WesternGeco LLC, 889 F.3d at 1321 (“a contractual and fairly standard customer-manufacturer relationship regarding the accused product” does not suggest, “without more, that the parties were litigating . . . [an] IPR[] as proxies for the other.”). The only relationship alleged to exist between Chem-Mod, its affiliates, and the Chem-Mod Purchasers is that of a supplier-customer relationship. As part of that relationship, the parties entered into supply agreements that included an indemnification provision for the purchased products. Exs. 2037–2042 (discussed at Sur-reply 8–9).” slip op. at 12

    • PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner

      “are unpatentable, which includes the burden of establishing that any reference upon which it relies constitutes prior art under 35 U.S.C. § 102. See 35 U.S.C. § 316(e); Mahurkar v. C.R. Bard, Inc., 79 F.3d 1572, 1576 (Fed. Cir. 1996) (holding that a patent challenger “bore the burden of persuasion . . . on all issues relating to the status of [the asserted reference] as prior art”). Here, because Petitioners initially show Downs-Boiler qualifies as prior art on its face, Patent Owner bears the subsequent procedural burden to produce evidence antedating the reference. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378–80 (Fed. Cir. 2015); Magnum Oil, 829 F.3d at 1375. Although the burden of production can be a shifting burden, the burden of persuasion is on Petitioners to ultimately prove “unpatentability by a preponderance of the evidence,” and that this burden never shifts to Patent Owner. Dynamic Drinkware, 800 F.3d at 1378.” slip op. at 37

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioners assert that “[a] person of ordinary skill in the art [“POSITA”] would have at least a bachelor’s degree in chemical engineering, mechanical engineering, or a related field of study with at least two years of experience implementing pollution control in power generation plants for natural gas, coal, and/or industrial waste incineration.” Pet. 12 (citing Ex. 1002 ¶¶ 48–51). Patent Owner does not dispute the level of ordinary skill in the art. See generally Prelim Resp. For purposes of this Decision, we adopt Petitioners’ proposed definition of a POSITA because it is consistent with the skill level reflected in the disclosures of the ’430 patent and prior art. See Okajima, 261 F.3d at 1355 (the prior art may reflect an appropriate level of skill in the art).” slip op. at 20

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. [§] 282(b).” 37 C.F.R. § 42.100(b). Under that standard, the words of a claim “are generally given their ordinary and customary meaning,” which is “the meaning that the term would have to a person of ordinary skill in the art in question at the time of the invention, i.e., as of the effective filing date of the patent application.” Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). Claim terms need only be construed to the extent necessary to resolve the controversy. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011). On this record and for purposes of this Decision, we see no need to construe any claim term expressly.” slip op. at 21

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 10,668,430
  • PTAB · Aug 14, 2025 · IPR2025-00505 · APJ Jeffrey N Fredman · IPR · Institution

    The Board instituted inter partes review of claims 1–15 on all grounds, finding a reasonable likelihood that the claims would have been shown obvious over the asserted prior art.

    RulingsInstitution decision
    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “However, Patent Owner has not shown that circumstances exist that would require dismissal of the proceeding as barred under § 315(b) if the unnamed party were added as a real party in interest. Patent Owner has also not alleged any discovery abuse at this time. We determine that we need not address whether Cipla is an unnamed RPI at this stage. The parties may further address this issue during the trial portion of the proceedings. As the Board explained in SharkNinja, it “better serves the interest of cost and efficiency” when the Board does not engage in the “extensive analysis” required to determine whether a party is an unnamed RPI if the result of that analysis has no material impact on the proceeding. SharkNinja v. iRobot Corp., IPR2020-00734, Paper 11 at 19–20 (PTAB Oct. 6, 2020) (precedential). Here, it is undisputed that Petitioner could have named Cipla as an RPI in its Petition without triggering a statutory bar or estoppel under 35 U.S.C. § 315.” slip op. at 5

    • Skill levelSkill level petitioner adoptedOther

      “Patent Owner states it disagrees with Petitioner’s “definition of a POSA but assumes their definition for purposes of the arguments presented herein.” Prelim. Resp. 6. At this stage in the proceeding, we find that Petitioner’s analysis reasonably establishes a level of ordinary skill in the art as it directly relates to those deciding treatments based on the prior art references. The level of ordinary skill in the art usually is evidenced by the prior art references themselves. See, e.g., Ex. 1003, 1817, author list. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995).” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownOther

      “Thus, the ’552 patent teaches that patients may or may not receive some therapeutic benefit from the treatment and also recognizes that any therapeutic benefit may result in prolonging life, but not necessarily result in complete remission of the pancreatic tumor. This understanding is consistent with Dr. Ratain’s testimony that “[t]reating a patient is always with the attempt or intent to cause a therapeutic improvement of the patient, which, in the case of metastatic pancreatic cancer, could be reduced tumor growth or increased overall survival in the patient.” Ex. 1002 ¶ 50. We are unpersuaded, however, by Dr. Ratain’s statement equating “treatment with a saline control” with the claimed “treating metastatic adenocarcinoma,” because the claim is addressing a disease condition whereas the example in Figure 6A is clearly providing a control, without any expectation of therapeutic benefit. See id. ¶ 55. We are not persuaded, on this record, that because Patent Owner did not include the phrase “therapeutically effective amount” in the claims, the claims solely relate to “administering” the antineoplastic therapies without any resulting therapeutic benefit. Rather, on this record, we agree with Patent Owner that the ordinary understanding of a claim reciting a “method of treating metastatic adenocarcinoma of the pancreas” that comprises “administering an antineoplastic therapy to the patient” in order “to treat the metastatic adenocarcinoma of the pancreas” is that the “treatment” would have more than a de minimis therapeutic benefit or efficacy for the patient being treated. To the extent that Patent Owner’s position would require some” slip op. at 13

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “While we are aware that hindsight bias may plague determinations of obviousness, Graham, 383 U.S. at 36, we are also mindful that the Supreme Court has clearly stated that the “combination of familiar elements according to known methods is likely to be obvious when it does no more than yield predictable results.” KSR, 550 U.S. at 416. The evidence of record shows the prior art provides specific reasons to replace irinotecan with liposomal irinotecan in the treatment of pancreatic cancer, including improved sustained release, local bioactivation, increased efficacy, and reduced side effects. Ex. 1006, 9; Ex. 1008, 921; Ex. 1002 ¶¶ 91, 238, 239. These specific reasons, as supported by Dr. Ratain, provide specific support for the obviousness of modifying the Conroy Protocol for patients with toxicity to substitute a 60 mg/m2 dose of liposomal irinotecan for irinotecan, particularly in patients with the particular UGT1A1 allele identified by Bayever. Ex. 1006, 3.” slip op. at 37

    Claim construction§ 103 obviousnesscites KSR
    Patents in suitUS 11,344,552
  • PTAB · Jun 23, 2025 · IPR2024-00313 · APJ Tawen Chang · IPR · Final written decision

    Claims 1–54 were not shown unpatentable because Petitioner failed to establish a reasonable expectation of success for the proposed combinations; objective indicia also supported non-obviousness.

    RulingsFinal written decision
    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “As to the first issue, we agree with Patent Owner that defining the level of skill in view of the solution described in the patent risks improper hindsight. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) 18 (“[T]he level of skill in the art is a . . . lens through which . . . the Board views the prior art and the claimed invention,” which “prevents . . . factfinders from using their own insight or . . . hindsight[] to gauge obviousness.”). We therefore do not include “practical knowledge about . . . the deuterium isotope effect, including the patents and publications discussed [in the Petition],” as part of our definition of a person of ordinary skill in the art.” slip op. at 18

    • Expert testimonyPetitioner expert creditedMixed

      “person of ordinary skill in the art would employ” in an obviousness analysis, we give some weight to Dr. Guengerich’s testimony. KSR, 550 U.S. at 418; Plantronics, Inc. v. Aliph, Inc., 724 F.3d 1343, 1354 (Fed. Cir. 2013) (explaining that “motivation to combine may be found. . . in . . . the background knowledge, creativity, and common sense of the person of ordinary skill”). Nevertheless, even if we were to agree that an ordinarily skilled artisan would have seen the 1,5-shift in NRPE in Mata’s A2E biosynthetic pathway as a particularly desirable location for intervention, we are not persuaded that such a person would have been motivated to substitute C20 deuterated vitamin A for the vitamin A in Ortho Pharma’s composition and method, because Petitioner has not shown, by a preponderance of evidence, that such an artisan would have reasonably expected the substitution to retard the accumulation of A2E or to treat macular degeneration.” slip op. at 42

    • Claim Construction › Intrinsic evidence (Phillips canons) › Preamble limiting or notPreamble limitingDecided for patent owner

      “In our Institution Decision, we preliminarily construed the preamble of claim 28 as limiting. Inst. Dec. 30–31. Petitioner did not take issue with our construction, or dispute Patent Owner’s construction of the preambles of claims 1 and 29 as also limiting. After consideration of the full trial record, we maintain our construction of the preamble of claim 28 as limiting for the reasons set forth in our Institution Decision. For similar reasons and the reasons set forth in Patent Owner’s Response, we further construe the preambles of claims 1 and 29 as limiting. See PO Resp. 12–14. We further determine that we do not need to construe any other claim term in order to resolve the controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 26

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc). Under this framework, claim terms are given their ordinary and customary meaning, as would be understood by a person of ordinary skill in the art, at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.” slip op. at 25

    Patent outcomesUS RE47,045 not shown unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
Page 1 of 11
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.