  • PTAB · Dec 10, 2024 · IPR2024-00915 · APJ Hyun J Jung · IPR · Institution

    The Board instituted IPR on claims 1–6 and 21–24 for all asserted grounds, finding a reasonable likelihood that claim 1 is unpatentable over Mathiassen and Ryan.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314, an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the Petition and for the reasons explained below, we determine that Petitioner has shown a reasonable likelihood of prevailing with respect to at least one of the challenged claims. Thus, we institute an inter partes review of claims 1–6 and 21–24 of the ’637 patent on all presented challenges. 37 C.F.R. § 42.108(a) (“When instituting . . . review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person of ordinary skill in the art “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related subject, and one to two years of work experience in electronic device design, secure electronic communications, or a related field” and that “[l]ess experience may be necessary with additional education, and likewise, less education may be necessary with additional work experience.” Pet. 6 (citing Ex. 1003 ¶¶ 40–41). Based on the preliminary record, we adopt Petitioner’s asserted level of ordinary skill to determine whether there is a reasonable likelihood that Petitioner would prevail with respect to at least one of the claims challenged in the Petition.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionOther

      “Petitioner proposes interpreting “resident within” recited by claims 1 and 21 to mean “temporary storage of the software while the software is being executed” with citations to the Specification, declaration, and other prior art. Pet. 8–11. Petitioner also proposes that other terms should be given their plain and ordinary meaning. Id. at 8 (citing Ex. 1003 ¶¶ 42–44). At this stage, the language of the claims and the cited portions of the Specification and declaration support Petitioner’s proposed interpretation of “resident within.” Pet. 8–9; Ex. 1001, 5:12–20, 7:63–65, 8:57–58; Ex. 1003 ¶¶ 45–54. We, therefore, adopt Petitioner’s proposed interpretation of “resident within” to mean “temporary storage of the software while the software is being executed.” Pet. 8. We also determine that express claim interpretation of other terms is not necessary to determine whether Petitioner shows a reasonable likelihood of prevailing. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms that . . . are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted

      “Petitioner argues that Mathiassen and Ryan are analogous art because they are in the same field of endeavor and reasonably pertinent to a problem of the ’637 patent. Pet. 18–19 (citing Ex. 1003 ¶¶ 72–74). According to Petitioner, one of ordinary skill in the art “would have been motivated to modify Mathiassen’s portable device to conduct and authenticate transactions, as taught by Ryan.” Pet. 18 (citing Ex. 1003 ¶ 72); see also id. at 19–21 (citing Ex. 1003 ¶¶ 74–77; Ex. 1005, code (57), ¶¶ 50, 65–98; Ex. 1006 ¶¶ 105, 223–225, 232, 235, 238, 249, 368). Petitioner also argues that one of ordinary skill in the art “would have been motivated to modify Mathiassen’s portable device to conduct transactions using a wireless interface, as taught by Ryan, to enable Mathiassen’s portable device to communicate wirelessly with external devices.” Id. at 18; see also id. at 21–22 (citing Ex. 1003 ¶¶ 78; Ex. 1005, code (57); Ex. 1006 ¶¶ 151, 223– 225, 235, 248). Petitioner further argues that the proposed combination would have merely been prior art elements combined according to known methods to yield a predictable result. Pet. 22–23 (citing Ex. 1003 ¶ 79). Petitioner additionally argues that the proposed combination would have been modifying a similar device in a same way. Id. at 24 (citing Ex. 1003 ¶ 81; Ex. 1005 ¶ 50, Fig. 2b; Ex. 1006 ¶ 175). In Petitioner’s view, the proposed combination also represents a mere substitution of one known element in the field for another known element. Id. at 24–25 (citing Ex. 1001, 6:50–54; Ex. 1003 ¶ 81; Ex. 1006 ¶¶ 223, 235). Petitioner contends that one of ordinary skill in the art would have had a reasonable expectation of success in making the proposed combination.” slip op. at 13

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,480,637
  • PTAB · Nov 22, 2024 · IPR2024-00825 · APJ Andrew L Nalven · IPR · Institution

    The Board denied institution because the petition did not show a reasonable likelihood of proving any challenged claim unpatentable under the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Pursuant to 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons that follow, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing in demonstrating the unpatentability of at least one of the challenged claims. Accordingly, we decline to institute an inter partes review.” slip op. at 2

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner

      “Step 1 of Figure 7 begins by obtaining the geographic information of the area to search for possible remote targets. Id. at 8:57–59. In step 2, the next geographic region where a possible search for a PRU is estimated. Id. at 8:64–66. In step 3, a page is sent out to that geographic region for remote units in the region to reveal their location. Id. at 9:2–4. In steps 4 and 5, if remote units are identified in the paged area, that information is forwarded to the network and the process continues to step 7 where the process is aborted. Id. at 9:4–6. Step 6 is performed if no units are identified in the paged area. Id. at 9:6–9. There, a check is done to establish if there are any remaining cells or grids higher up in the chain to be searched, and if so, the process returns to step 2 to search additional geographic areas. Id. at 9:9–12. The iterative process described in Figure 7 is consistent with Patent Owner’s proposed construction requiring forwarding a notification to only one or more PRUs currently located in a specific geographic boundary. Ex. 2001 ¶ 55; see also Ex. 1001, 8:32–54 (describing a grid search technique that may be implemented by the process of Figure 7).” slip op. at 13

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “(“POSITA”) would have had “a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent.” Pet. 8 (citing Ex. 1002 ¶¶ 28–30). Patent Owner does not dispute Petitioner’s proffered definition as to the level of ordinary skill in the art. Prelim. Resp. 6. For purposes of this Decision, we adopt Petitioner’s assessment, which is consistent with the level of skill reflected in the Specification and asserted prior art.” slip op. at 16

    • Expert testimonyPatent owner expert creditedDecided for patent owner

      “We are further not persuaded by Petitioner’s argument that forwarding notifications to the PRUs only within a specified geographic region renders element 12[D]’s step of verifying whether the PRUs exists within said region unnecessary. Pet. 35 n.8. Rather, we credit Mr. McAlexander who testifies that forwarding notifications to individually pollable geographic boundaries “does not obviate the need for the PRU to identify that the notification has been received or verify its location within the individual geographic boundary before responding.” Ex. 2001 ¶ 155.” slip op. at 15

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,199,726
  • PTAB · Nov 22, 2024 · IPR2024-00827 · APJ Thomas L Giannetti · IPR · Institution

    Institution was denied because Petitioner did not show a reasonable likelihood of proving claims 1, 2, 15, or 22 unpatentable on any asserted obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 6 (citing Andrews Decl. ¶ 25). At this stage, Patent Owner does not dispute this contention. Prelim. Resp. 5. For the purpose of determining institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’918 patent specification and the asserted prior art.” slip op. at 20

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “means.” See Ex. 1001, 11:60–12:4, 12:6–8, 15:30–37. The use of the word “means” in a claim element creates a rebuttable presumption that 35 U.S.C. § 112 ¶ 63 applies. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). 3 Section 4(c) of the AIA re-designated 35 U.S.C. § 112, sixth paragraph, as 35 U.S.C. § 112(f). Because the ’918 patent has a filing date before the We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 1, 2, and 22. See Pet. 7–12; Prelim. Resp. 9–21. slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “Having reviewed Patent Owner’s position on claim limitation 1[C], we determine that we do not need to expressly construe this claim term to effective date of the relevant amendment, we refer to the pre-AIA version of § 112. Owner acknowledges that the asserted network “includes control units programmed to obtain the locations of the offender and victim devices,” and does not base its arguments on the construction of this limitation. Id. at 42.” slip op. at 11

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,756,918
  • PTAB · Nov 22, 2024 · IPR2024-00826 · APJ Thomas L Giannetti · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving any challenged claim unpatentable on the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 8 (citing Andrews Decl. ¶¶ 25–26). Patent Owner does not dispute this contention or offer an alternative formulation. See Prelim. Resp. 6. For the purpose of institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’752 patent specification and the asserted prior art.” slip op. at 19

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “1. Means-Plus-Function Terms Challenged claims 14 and 15 recite elements using the word “means.” See Ex. 1001, 13:6–18, 13:20–22. The use of the word “means” in a claim ’752 patent has a filing date prior to the effective date of the applicable AIA amendment, we refer to the pre-AIA version of §103. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). Construing a means-plus-function claim term is a two-step process. We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 14 and 15. See Pet. 8–12; Prelim. Resp. 11–19.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner

      “geographic region.” The ’752 patent describes polling specific sub-regions of the network for a PRU. Ex. 1001, 2:12–15, 7:22–34. As Mr. McAlexander testifies, “[a] PRU may choose to instruct the network to relay certain information to mobile units in a specific geographic region. That information would then be appended to the geographic boundary information and beamed in the specified geographic region.” McAlexander Decl. ¶ 49 (quoting Ex. 1001, 10:19–23) (alteration in original). For example, a nearby boundary can be polled for the locations of nearby wireless customers within proximity of a distressed wireless customer. As described in the ’752 patent, a distressed mobile user M1 may need to find where another party might exist in that geographic region. The user could initiate a page from their PRU for the closest available PRUs that could be found in that geographic jurisdiction. Looking at FIG. 3, mobile user M1 will provide its location, latitude and longitude (x0,y0) to the closest available ground station serving area C1 or grid G1. As stated earlier, appropriate terrestrial technology will be scattered in that region to serve the PRUs in that area as shown in FIG. 1. Once a ground station picks up this signal, it sends a page for all location reporting devices in the specified boundary surrounding mobile unit M1, FIG. 3 to disclose their location. Ex. 1001, 7:22–34 (emphasis added). slip op. at 18

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,441,752
  • PTAB · Oct 9, 2024 · IPR2024-00324 · APJ Michelle N Wormmeester · IPR · Rehearing

    Patent Owner’s rehearing request was granted; the Petition was denied and no trial instituted because the challenges did not meet the compelling-merits standard under Fintiv.

    RulingsRehearing decision
    • RehearingRehearing, grantedGranted

      “abuse of discretion. See 37 C.F.R. § 42.71(c). An abuse of discretion occurs when a “decision [i]s based on an erroneous conclusion of law or clearly erroneous factual findings, or . . . a clear error of judgment.” PPG Indus., Inc. v. Celanese Polymer Specialties Co., 840 F.2d 1565, 1567 (Fed. Cir. 1988). “The burden of showing that a decision should be modified lies with the party challenging the decision.” Office Patent Trial Practice Guide, 77 Fed. Reg. 48,756, 48,768 (Aug. 14, 2012). In its request for rehearing, the dissatisfied party must (1) “specifically identify all matters the party believes the Board misapprehended or overlooked” and (2) identify the place “where each matter was previously addressed.” 37 C.F.R. § 42.71(d); Office Patent Trial Practice Guide, 77 Fed. Reg. at 48,768.” slip op. at 3

    • Claim Construction › Intrinsic evidence (Phillips canons) › Prosecution history disclaimer / disavowalTerm construed board ownDecided for patent owner

      “Our reviewing court has explained that “[t]he prosecution history modifies the scope of a claim term if ‘the patentee distinguished that term from prior art on the basis of a particular embodiment, expressly disclaimed subject matter, or described a particular embodiment as important to the invention.’” Sentry Protection Prods., Inc. v. Eagle Mfg. Co., 400 F.3d 910, 915 (Fed. Cir. 2005) (quoting CCS Fitness, Inc. v. Brunswick Corp., 228 F.3d 1359, 1366–67 (Fed. Cir. 2002)).” slip op. at 8

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “discretion to deny institution due to the advanced state of parallel litigation, taking into consideration the six factors identified in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 (PTAB Mar. 20, 2020) (precedential), as well as applying guidance set forth in a Memorandum regarding the “Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation” issued by the Director of the U.S. Patent and Trademark Office (hereinafter, “Guidance Memo”).5 Inst. Dec. 6–43. We determined that the first five Fintiv factors favor discretionary denial,6 and that the Petition presents compelling evidence of unpatentability as to independent claims 1, 12, and 17 under the sixth Fintiv factor. Id. at 15–16, 23–43. Because “the PTAB will not deny institution based on Fintiv if there is compelling evidence of unpatentability,” we declined to exercise our discretion to deny. Guidance Memo 5; Inst. Dec. 15–16.” slip op. at 4

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableMotivation not foundNot shown unpatentable

      “those arguments. See Inst. Dec. 45–47. As to Petitioner’s arguments on the claimed first and second formats of limitation 1D in particular, we found the record provided “some support” for Petitioner’s position that “it would have been obvious to a [person of ordinary skill in the art] that one or more RTS Media Abstraction Modules could operate at a server, such as in [Aldrey’s] Service Provider Network 103,” even though Petitioner asserted that Mahajan teaches command conversion at the client. Id. at 45–46 (citing Pet. 66–67). Yet assuming Mahajan’s RTS Media Abstraction Module could have operated at a server, as Petitioner argued, it is not readily apparent why an ordinarily skilled artisan would have considered locating the RTS Media Abstraction Module at a server based on Mahajan’s disclosure of command conversion at a client. See also Pet. 66 (“[I]t would have been obvious to a [person of ordinary skill in the art] that the RTS Media Abstraction Module could be located on the client or server.” (emphasis added)). Nor did Petitioner adequately explain why an ordinarily skilled artisan would have considered locating Mahajan’s RTS Media Abstraction Module at a server. We note Petitioner further argued that combining Mahajan and Aldrey would have provided a system where “Aldrey’s end terminal would translate commands associated with a first type of media playing application to a command associated with a second type of media playing application on a STB.” Pet. 68; see also id. at 67 (“Mahajan’s server-command teachings could be implemented on Aldrey’s end terminal remote control.”). Arguing that Aldrey’s end terminal would translate commands seems inconsistent with Petitioner’s earlier argument for locating command conversion at Aldrey’s network service provider. See id. at 66–68. Moreover, it is not readily apparent how command translation by Aldrey’s end terminal––rather than Aldrey’s network service provider––teaches or suggests the format of a command sent from the end terminal to the network service provider is different from the format of a command sent from the network service provider to the STB. Petitioner did not close these logical gaps, leaving its case short of compelling.” slip op. at 18

    Claim construction§ 103 obviousnessDiscretionary denial
    Patents in suitUS 11,048,751
  • PTAB · Oct 8, 2024 · IPR2024-00432 · APJ Frederick C Laney · IPR · Institution

    The Board instituted review of claims 1–20 on all petitioned grounds, finding a reasonable likelihood that Comcast would show at least one claim unpatentable over Zhang.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in inter partes review). slip op. at 12

    • Parallel petitionsDenied

      “petitions, Petitioner filed a Petition Ranking and Explanation of Material Differences Between Petitions, ranking its three petitions directed to the ’362 patent in accordance with the guidance with respect to parallel petitions in the Board’s November 2019 Consolidated Trial Practice Guide. Paper 3; see Patent Trial and Appeal Board Consolidated Trial Practice Guide (Nov. 2019, “CTPG”), at 59–60 (available at Available at https://www.uspto.gov/ TrialPracticeGuideConsolidated). In that Paper, Petitioner ranked the instant Petition first. Paper 3, 1.” slip op. at 10

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art (“POSITA” or “skilled artisan”) “would have had a degree in electrical engineering or a similar discipline, along with three-to-four years of experience with digital signal processing and RF tuning systems for satellite and/or cable communications,” and that “[a]dditional education may substitute for professional experience, and significant work experience may substitute for 8 Patent Owner does not present objective evidence of nonobviousness at this stage of the proceeding. See generally Prelim. Resp. formal education.” Pet. 20 (citing Ex. 1002 ¶¶ 30–32). Patent Owner does not address level of ordinary skill in the art. See generally Prelim. Resp. For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Claim Construction We apply the same claim construction standard used in district court actions under 35 U.S.C. § 282(b), namely that articulated in Phillips v. AWH Corp., 415 F.3d 1303 (Fed. Cir. 2005) (en banc). See 37 C.F.R. § 42.100(b) (2021). In applying that standard, claim terms generally are given their ordinary and customary meaning as would have been understood by a person of ordinary skill in the art at the time of the invention and in the context of the entire patent disclosure. Phillips, 415 F.3d at 1312–13. “In determining the meaning of the disputed claim limitation, we look principally to the intrinsic evidence of record, examining the claim language itself, the written description, and the prosecution history, if in evidence.” DePuy Spine, Inc. v. Medtronic Sofamor Danek, Inc., 469 F.3d 1005, 1014 (Fed. Cir. 2006) (citing Phillips, 415 F.3d at 1312–17). Petitioner states that “[a]ll claim terms herein should be given their” slip op. at 13

    Claim construction§ 102 anticipationDiscretionary denialcites Phillips
    Patents in suitUS 9,210,362
  • PTAB · Oct 4, 2024 · IPR2024-00438 · APJ Michelle N Wormmeester · IPR · Institution

    Instituted IPR on claims 1–76 and all asserted challenges because the Petition showed a reasonable likelihood of prevailing on at least one challenged claim.

    RulingsInstitution decision
    • Parallel petitionsDenied

      “We do not agree with Patent Owner that Petitioner’s filing of three parallel petitions is grounds to deny all three petitions on that basis alone. See Prelim. Resp. 4–30. As discussed above, Petitioner has complied with our guidance. See CTPG 59–60. For reasons given in our concurrent decisions denying institution in IPR2024-00439 and IPR2024-00440, however, we agree with Patent Owner that plural petitions are not warranted and we deny institution in the concurrently filed decisions for these petitions. Given our decisions to deny institution in IPR2024-00439 and IPR2024-00440, Patent Owner’s arguments on the need for more than one petition are unavailing with regard to the instant Petition. In view of the foregoing, we decline to exercise our discretion to deny institution under 35 U.S.C. § 314(a) in this proceeding.” slip op. at 8

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Pursuant to 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons that follow, we institute an inter partes review as to all the challenged claims of the ’206 patent based on all the challenges raised in the Petition.” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner asserts that “[a]ll claim terms herein should be given their ordinary and customary meaning to a POSITA, as they would be given in a civil action under 35 U.S.C. § 282(b),” where POSITA stands for “person of ordinary skill in the art.” Pet. 18. Petitioner further notes that “the ’206 patent defines ‘wideband’ as a band that carries multiple channels.” Id. at 18–19 (citing Ex. 1001, 1:36–39). Patent Owner does not respond. At this stage, on the record before us, we determine that no claim term requires express interpretation to resolve any controversy in this proceeding. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999).” slip op. at 9

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “Based on Petitioner’s arguments and evidence, we are persuaded that Petitioner has shown sufficiently for purposes of this Decision that Zhang teaches the recited “digitizing” step of element 1C. For example, Zhang teaches that its ADC 220 “converts the down-converted multi-channel analog RF signal to a multi-channel digital RF signal.” Ex. 1013 ¶ 27 (cited by Pet. 22). Zhang explains that “many modifications, variations, alternatives, and equivalents . . . are intended to be within the scope of [its] invention,” and gives the example that “the RF channels need not be contiguous.” Id. ¶ 48 (cited by Pet. 22). We agree with Petitioner that Zhang’s example teaches or suggests that the RF channels may be contiguous. Zhang further describes “demultiplex[ing] the multi-channel digital RF signal into separate digital RF channels C1 to Cn,” which “contain content channels that are selected or used by a subscriber.” Id. ¶ 28 (cited by Pet. 22). Zhang describes filtering the RF channels so that “only the target RF channel passes.” Id. ¶ 32 (cited by Pet. 23). In addition, Zhang describes “select[ing] one or more of the RF channels D1 to Dm from one or more of the digital RF channels C1 to Cn,” where “only the selected channels are later demodulated unlike the systems using RF tuners which demodulate all of the RF channels.” Id. ¶ 28.” slip op. at 15

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips
    Patents in suitUS 11,399,206
  • PTAB · Oct 1, 2024 · IPR2024-00435 · APJ Lynne H Browne · IPR · Institution

    The Board instituted review of claims 1–82 on all grounds, finding a reasonable likelihood that Comcast would prevail on at least one claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “35 U.S.C. § 314 and 37 C.F.R. § 42.4(a). An inter partes review may not be instituted unless it is determined that “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons discussed below, we determine, based on the record before us, that there is a reasonable likelihood Petitioner would prevail in showing at least one of the challenged claims is unpatentable. Furthermore, we deny Patent Owner’s request for us to exercise our discretion to deny institution in this proceeding based on Petitioner’s filing of two additional parallel petitions challenging the same claims. We therefore institute inter partes review on all claims and all grounds. See SAS Inst. Inc. v. Iancu, 584 U.S. 357 (2018).” slip op. at 2

    • Parallel petitionsDenied

      “We do not agree with Patent Owner that Petitioner’s filing of three parallel petitions is grounds to deny all three petitions on that basis alone. See Prelim. Resp. 4–30. As discussed above, Petitioner has complied with our guidance. See CTPG, 59–60. For reasons discussed in our concurrent Decisions Denying Institution in IPR2024-00436 and IPR2024-00437, however, we agree with Patent Owner that plural petitions are not warranted and we deny institution in the concurrently filed Decisions for these petitions. Given our Decisions to Deny Institution in IPR2024-00436 and IPR2024-00437, Patent Owner’s arguments regarding the need for more than one petition are unavailing with regard to the instant Petition.” slip op. at 11

    • Skill levelSkill level petitioner adoptedOther

      “Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art (“POSITA”) “would have had a degree in electrical engineering, or a similar discipline, along with three-to-four years of experience with digital signal processing and RF tuning systems for satellite and/or cable communications,” and that 6 Patent Owner does not present objective evidence of nonobviousness at this stage of the proceeding. See generally Prelim. Resp. “[a]dditional education may substitute for professional experience, and significant work experience may substitute for formal education.” Pet. 15– 16 (citing Ex. 1002 ¶¶ 30–32). Patent Owner does not address level of ordinary skill in the art. See generally, Prelim. Resp. For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states that “[a]ll claim terms herein should be given their ordinary and customary meaning to a POSITA as they would be given in a civil action under 35 U.S.C. § 282(b).” Pet. 16. Yet, Petitioner proposes claim construction for “wideband” and “digital down converter” / “digital front end.” Id. at 16–19. Patent Owner does not address claim construction. See generally, Prelim. Resp. For purposes of this Decision, we determine that no aspects of the challenged claims require explicit construction. See, e.g., Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 14

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips
    Patents in suitUS 11,381,866
  • PTAB · Sep 13, 2024 · IPR2024-00619 · APJ Andrew L Nalven · IPR · Institution

    Instituted IPR of claims 1–8 on all asserted grounds; the Board found compelling evidence that claims 1 and 6 would have been obvious over Yu and Acharya.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “and 5 weigh in favor of discretionary denial of institution, and factor 4 weighs slightly against discretionary denial. We, therefore, conclude that the evidence of record on factors 1–5, overall, favors exercising our discretion to deny institution of an inter partes review. The sixth Fintiv factor takes into account other circumstances that may bear on the decision to exercise discretion to deny, such as the merits of the patentability challenges. Fintiv, Paper 11 at 14–16. Under this factor, if we determine that the other Fintiv factors favor discretionary denial, as we do here, we must also consider whether the Petition presents compelling merits. CommScope, Paper 23 at 5. As discussed above, “[c]ompelling, meritorious challenges are those in which the evidence, if unrebutted in trial, would plainly lead to a conclusion that one or more claims are unpatentable by a preponderance of the evidence.” Guidance Memo at 4. Accordingly, we first discuss the merits of the Petition. We then discuss our conclusion that the merits are compelling.” slip op. at 13

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Pursuant to 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons that follow, we institute an inter partes review.” slip op. at 2

    • BurdenOther

      “we agree with Petitioner that the Petition sufficiently provides notice to Patent Owner of the basis of the challenge. As noted above, the Petition sets forth the evidence necessary to establish that Acharya is prior art under section 102(a)(2) by noting that Acharya’s application was filed before the earliest priority date of the ’383 patent. Pet. 5 (“[T]he earliest priority date of the ’383 patent is March 28, 2013 . . . Acharya . . . was filed on October 5, 2011 and published on April 11, 2013.”). This information is relevant only to an assertion of prior art under § 102(a)(2), not § 102(a)(1). The Petition further includes argument, with citations to the prior art and evidence, as to how the prior art renders each challenged claim unpatentable. Pet. 25–70. Patent Owner does not dispute that Acharya is prior art under 35 U.S.C. § 102(a)(2), nor does Patent Owner assert that the Petition failed to set forth with particularity how the challenged ground addresses each claim element. See generally Sur-Reply. Based on the evidence presented in the Petition (Pet. 5, 25–70), we determine that the Petition sufficiently articulates, with particularity, the evidence that supports the grounds for the challenge to each claim.” slip op. at 24

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “application on April 11, 2013. Ex. 1004, codes (22), (43). The ’383 patent issued on August 7, 2018, and the earliest claimed priority date for the ’383 patent is March 28, 2013. Ex. 1001, codes (45), (63), (30). Thus, Acharya qualifies as prior art under § 102(a)(2) because it was filed on October 5, 2011, and thus was “effectively filed before the effective filing date” of the ’383 patent. Despite the Petitioner’s citation to the wrong sub-part of section 102, we agree with Petitioner that the Petition sufficiently provides notice to Patent Owner of the basis of the challenge. As noted above, the Petition sets forth the evidence necessary to establish that Acharya is prior art under section 102(a)(2) by noting that Acharya’s application was filed before the earliest priority date of the ’383 patent. Pet. 5 (“[T]he earliest priority date of the ’383 patent is March 28, 2013 . . . Acharya . . . was filed on October 5, 2011 and published on April 11, 2013.”). This information is relevant only to an assertion of prior art under § 102(a)(2), not § 102(a)(1). The Petition further includes argument, with citations to the prior art and evidence, as to how the prior art renders each challenged claim unpatentable. Pet. 25–70. Patent Owner does not dispute that Acharya is prior art under 35 U.S.C. § 102(a)(2), nor does Patent Owner assert that the Petition failed to set forth with particularity how the challenged ground addresses each claim element. See generally Sur-Reply. Based on the evidence presented in the Petition (Pet. 5, 25–70), we determine that the Petition sufficiently articulates, with particularity, the evidence that supports the grounds for the challenge to each claim.” slip op. at 23

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,045,383
  • PTAB · Jul 24, 2024 · IPR2024-00324 · APJ Michelle N Wormmeester · IPR · Institution

    The Board instituted IPR of claims 1–20 on all three §103 challenges, finding compelling merits at least for claims 1, 12, and 17 and declining discretionary denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied

      “framework, determining, first, “whether the same or substantially the same art previously was presented to the Office or whether the same or substantially the same arguments previously were presented to the Office.” Advanced Bionics, LLC v. MED-EL Elektromedizinische Geräte GmbH, IPR2019-01469, Paper 6 at 8 (PTAB Feb. 13, 2020) (precedential). If either condition of the first part of the framework is satisfied, we then determine “whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of challenged claims.” Id.” slip op. at 7

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “may bear on the decision to exercise discretion to deny, such as the merits of the patentability challenges. Fintiv, Paper 11 at 14–16. Under this factor, “the PTAB will not deny institution based on Fintiv if there is compelling evidence of unpatentability.” Guidance Memo 5. Board precedent provides that we should only consider the compelling merits standard if the first five Fintiv factors favor discretionary denial. CommScope Techs. LLC v. Dali Wireless, Inc., IPR2022-01242, Paper 23 at 4–5 (PTAB February 27, 2023) (precedential). The second, third, and fifth Fintiv factors favor denial. The first factor is neutral, and only the fourth factor weighs against denial. Thus, we determine that the first five Fintiv factors favor discretionary denial, and we now assess compelling merits. CommScope, Paper 23 at 5 (“In circumstances where, however, the Board’s analysis of Fintiv factors 1–5 favors denial of institution, the Board shall then assess compelling merits.”). The compelling merits standard is met when “the evidence, if unrebutted in trial, would plainly lead to a conclusion that one or more claims are unpatentable by a preponderance of the evidence.” Guidance Memo 4. A challenge can only meet this standard “if it is highly likely that the petitioner would prevail with respect to at least one challenged claim.” OpenSky Indus., LLC v. VLSI Tech. LLC, IPR2021-01064, Paper 102 at 49 (PTAB Oct. 4, 2022) (precedential) (“OpenSky”). In this case, we determine, for the reasons explained below in our analysis of Petitioner’s unpatentability challenges, that the Petition presents a compelling challenge at least for independent claims 1, 12, and 17.” slip op. at 15

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “construction. In an inter partes review proceeding, we construe a claim of a patent “using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b).” See 37 C.F.R. § 42.100(b). That standard involves construing claims in accordance with the ordinary and customary meaning of such claims as would have been understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. See id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–14 (Fed. Cir. 2005) (en banc).” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundOther

      “Patent Owner responds that “Petitioner provides no justification for combining Danciu and Mahajan aside from a passing remark that both of them reference a mobile phone.” Prelim. Resp. 33–34. We disagree. Petitioner explains that it relies on Mahajan for “implementation details for transmission of commands for controlling a client.” Pet. 27. Petitioner further explains that an ordinarily skilled artisan would have considered applying Mahajan’s command conversion techniques in Danciu’s system because Danciu’s remote control and controlled device “would likely employ different applications.” Id. at 31. Petitioner’s proffered reasoning for combining Danciu and Mahajan is persuasive. See In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006) (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”); Ex. 1114 ¶¶ 22, 36 (Mahajan explaining that “includ[ing] a collaboration media abstraction layer . . . can facilitate media-related communications between the server . . . and client,” where “the client’s media platform . . . may not be the same as the server’s media platform, . . . and as such . . . may not understand the intercepted platform-specific media commands of the server”) (cited by Pet. 28). Moreover, that Danciu and Mahajan both describe “system[s] wherein a user can command media on a controlled device” and that applying Mahajan’s command conversion techniques was a known way to implement the transmission of such commands is sufficient reason for combining Danciu and Mahajan. See Pet. 27–30. Petitioner need only show that Mahajan’s command conversion techniques would have been a “suitable option” for implementation in Danciu’s system. See Intel Corp. v. PACT XPP Schweiz AG, 61 F.4th 1373, 1381 (Fed. Cir. 2023). Patent Owner does not dispute that an ordinarily skilled artisan would have recognized that using Mahajan’s command conversion techniques would have supported the transmission of commands in systems like Danciu’s system. See generally Prelim. Resp.” slip op. at 32

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips
    Patents in suitUS 11,048,751

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.