  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Oct 3, 2025 · PGR2025-00032 · APJ Susan L C Mitchell · PGR · Institution

    The Board denied institution because Patent Owner disclaimed all challenged claims.

    RulingsInstitution decision
    • Adverse judgmentAdverse judgmentDenied

      “Section 42.207(e) states that “[n]o post-grant review will be instituted based on disclaimed claims.” 37 C.F.R. § 42.207(e). Because the Patent Owner has disclaimed all claims challenged by the grounds in this Petition, we determine that no trial will be instituted.” slip op. at 2

    None
    Patents in suitUS 12,115,166
  • PTAB · Jun 2, 2025 · IPR2025-00233 · APJ Michael A Valek · IPR · Institution

    The Board denied institution under § 314(a) based on the Fintiv factors and denied joinder; it did not reach the merits of the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “B. The Fintiv Factors and Related Guidance The Board’s precedential decision in Fintiv outlines factors that balance considerations of system efficiency, fairness, and patent quality when a patent owner raises an argument for discretionary denial due to the advanced state of a parallel proceeding, such as the MDL proceeding here. Fintiv 5–6. These factors are: 1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. Id. “[I]n evaluating the factors, the Board takes a holistic view of whether efficiency and integrity of the system are best served by denying or instituting review.” Id. at 6.” slip op. at 10

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “III. DISCRETION UNDER 35 U.S.C. § 314(A) We begin by addressing Patent Owner’s arguments for discretionary denial. As explained below, we find those arguments persuasive. Thus, we exercise discretion to deny institution of the Petition under 35 U.S.C. § 314(a) without reaching the merits of Petitioner’s asserted grounds of unpatentability.” slip op. at 8

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied

      “35 U.S.C. § 314(a) to deny institution of the Petition and deny the Joinder Motion.” slip op. at 2

    Discretionary denial
    Patents in suitUS 11,084,865
  • PTAB · Jun 2, 2025 · IPR2025-00176 · APJ Michael A Valek · IPR · Institution

    The Board denied institution of IPR on all challenged claims under § 314(a), finding the Fintiv factors—particularly investment, overlap, and merits—weighed against review.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “raised by this overlap, but given the circumstances, it does not effectively mitigate them. First, the disputed issues for Petitioner’s ODP defense are the same or substantially similar to those for the obviousness grounds in the Petition, but the Sotera stipulation does not prevent Petitioner from litigating those issues before both the district court (as part of its ODP defense) and here in the event an IPR is instituted.19 Second, the MDL proceeding 19 ODP or nonstatutory double patenting is, as the name implies, not premised on any statute. See, e.g., Ostuka Pharm. Co., Ltd. v. Sandoz, Inc., 678 F.3d 1280, 1297 (Fed. Cir. 2012) (“Nonstatutory double patenting is a judicially created doctrine grounded in public policy.”). Accordingly, it is not a ground Petitioner reasonably could have raised in this IPR. See 35 U.S.C. § 311(b) (inter partes review may be requested “only on a ground that could be raised under section 102 or 103”). includes other biosimilar applicant defendants who are similarly motivated to try to invalidate the ’865 patent claims, but who are not subject to any Sotera stipulation. Even if we institute review on Petitioner’s grounds here, those other defendants remain free to litigate the same grounds in the consolidated MDL proceeding. For these reasons and given the particular circumstances of this case, Petitioner’s Sotera stipulation does not sufficiently mitigate the risks of duplicated efforts or inconsistent decisions by making this IPR a “true alternative” to resolution of these issues by the district court. See Motorola Solutions, Inc. v. Stellar, LLC, IPR2024-01205, Paper 19, 3–4 (PTAB Mar. 28, 2005) (determining on Director Review that a Sotera stipulation did not ensure IPR would be a “true alternative” because Petitioner’s invalidity arguments “include combinations of the prior art asserted in these proceedings with unpublished system prior art, which Petitioner’s stipulation is not likely to moot” and thus the same or similar issues would remain in the parallel proceeding); SAP America, Inc. v. Cyandia, Inc., IPR2024-01496, Paper 13, 8–9 (PTAB Apr. 7, 2025) (similar).” slip op. at 19

    Discretionary denial
    Patents in suitUS 11,084,865
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · May 15, 2025 · IPR2025-00033 · APJ Susan L C Mitchell · IPR · Institution

    The Board denied institution of IPR on claims 1–13 under § 314(a), finding the Fintiv factors favored denial and the petition did not present compelling merits.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “We determine that this factor weighs heavily in favor of exercising discretion to deny the Petition. The trial date in the district court litigation is scheduled for October 6, 2025. See Prelim. Resp. 16 (citing Ex. 2010). This date is at least six months before our projected statutory deadline should we go forward in this case. Patent Owner points out that this trial date is nine months later than the median time to trial in the District of Delaware, and in Patent Owner’s view, the parties are on track to satisfy the current schedule. Id. at 16–17 (citing Ex. 2011).” slip op. at 9

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached

      “1 Patent Owner also asserts that the Petition should be denied under 35 U.S.C. § 325(d), but we need not reach this issue because we are exercising discretion under Section 314(a) to deny the Petition. See Prelim. Resp. 2–3.” slip op. at 2

    Discretionary denial
    Patents in suitUS 11,744,802
  • PTAB · May 1, 2025 · IPR2025-00136 · APJ Jeffrey N Fredman · IPR · Institution

    Institution of inter partes review was denied for claims 1–10 because Petitioner did not establish a reasonable likelihood of prevailing on any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Accordingly, we find that on the current record Petitioner has not shown that it has a reasonable likelihood that it would prevail on these obviousness grounds. XII. DISCRETIONARY DENIAL – 35 U.S.C. § 325(d) In view of our determination that the Petitioner does not meet the threshold for instituting review on the merits, we need not address the parties’ dispute about whether the Board should exercise its discretion to deny institution under 35 U.S.C. § 325(d). Pet. 74–75; Prelim. Resp. 38–54; Pet. Reply 1–5; PO Sur-Reply 1–5. XIII. CONCLUSION After reviewing the information presented in the Petition and the Preliminary Response, we determine that, based on the evidence of record, Petitioner has not established a reasonable likelihood that claims 1–10 of the ’841 patent are unpatentable. XIV. ORDER Accordingly, it is ORDERED that, pursuant to 35 U.S.C. § 314(a), institution of an inter partes review of all challenged claims on all grounds presented in the Petition is denied.” slip op. at 35

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element) › Inherent disclosureNot shown unpatentableInherency not foundNot shown unpatentable

      “However, neither Petitioner nor Dr. Jansky provide specific data on the record before us showing the actual measured homozygosity of either of the inbred lines, US-W 5309 and US-W 5315. And Phumichai experimentally demonstrates that Dr. Jansky’s assumption that theoretical heterozygosity reduction of 50% per generation is not necessarily accurate, stating the “observed average percentage of reduction of heterozygosity per generation (38.4% or 38.5%) was lower than the theoretically expected value of 50%.” Ex. 1005, 982. Indeed, Phumichai disclosed that the “SOPH [Section-based observed percentage of heterozygosity] decreased steadily from the original 100% in 99H2–1 (S0) to the family means of 62.4% in 3H2 (S1), 37.9% in 3H3 (S2).” Id. at 981. That is, Phumichai experimentally shows that in an S2 generation of a potato line, the heterozygosity was 37.9%, resulting in homozygosity of about 62.1%, below the 75% theoretically expected and the 75% required by claim 1 of the ’841 patent. Therefore, the evidence of record does not show that the S2 generation of potato lines in Jong necessarily satisfies the homozygosity recitation in claim 1 of the ’841 patent, and so cannot establish on the record before us that Jong inherently teaches this limitation.” slip op. at 15

    • Obviousness (§103) › Objective indicia / secondary considerationsObjective indicia outweighedNot shown unpatentableNot shown unpatentable

      “Owner is telling. Petitioner does not refute Patent Owner’s evidence of objective indicia. On the current record, the objective indicia evidence is compelling. As to long felt need, Patent Owner cited evidence on record before the Examiner that showed a persistent need recognized by ordinarily skilled artisans. In re Gershon, 372 F.2d 535, 538 (CCPA 1967). For example, Dr. Huang states “This research is the breakthrough we have been waiting for since nearly a century . . . This is crucial for the potato breeding worldwide.” Ex. 2009, 687. There is no evidence that this long-felt need was satisfied by another before Appellant’s invention. See Newell Companies, Inc. v. Kenney Mfg. Co., 864 F.2d 757, 768 (Fed. Cir. 1988) (“[O]nce another supplied the key element, there was no long-felt need or, indeed, a problem to be solved . . . .”). Lastly, Dr. Lindhout explains that this invention satisfies the long-felt need, stating “I have discovered, and disclosed in the present application for patent, how a fertile homozygote in” slip op. at 33

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached

      “XII. DISCRETIONARY DENIAL – 35 U.S.C. § 325(d) In view of our determination that the Petitioner does not meet the threshold for instituting review on the merits, we need not address the parties’ dispute about whether the Board should exercise its discretion to deny institution under 35 U.S.C. § 325(d). Pet. 74–75; Prelim. Resp. 38–54; Pet. Reply 1–5; PO Sur-Reply 1–5.” slip op. at 35

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 11,140,841
Page 1 of 23
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.