  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Oct 8, 2025 · IPR2025-00701 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–14 were obvious over the asserted combinations.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’138 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 1–14 of the ’138 patent.” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states that “the claim terms should be given their plain and ordinary meaning and no claim construction is necessary to find the claims unpatentable.” Pet. 6. Patent Owner does not address claim construction. See generally Prelim. Resp. We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 8

    • Skill levelSkill level petitioner adoptedOther

      “a Ph.D. or master’s degree in electrical engineering, physics, materials science, or a related field, and at least one year or four years, respectively, of experience in the research, design, and/or development of magnetic/spintronic devices, or the equivalent. Pet. 8 (citing Ex. 1024 ¶¶ 25–29). Petitioner contends that less work experience can be compensated for by a higher level of experience and vice versa. Id. (citing Ex. 1024 ¶ 25). Petitioner also asserts that the proposed level of skill would be the same under any of the United States, Japanese, or PCT application dates. Id. at 8–9 (citing Ex. 1024 ¶¶ 24–25). Patent Owner does not challenge Petitioner’s proposed level of qualifications for one of ordinary skill in the art. Prelim. Resp. 20. At this stage of the proceeding, we adopt Petitioner’s assessment of the level of skill in the art, which is consistent with the ’138 patent and the asserted prior art of record.” slip op. at 7

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “As discussed above, Petitioner relies upon Parkin, and its layers 115 and 175, as the claimed first and second ferromagnetic material layers, respectively. See Pet. 10, 16. Petitioner admits that these layers are 8 In the Petition, Petitioner refers to the lower electrode “ferromagnetic layer 110’ as discussed in Claim 1[a]” in the discussion of limitation 1[d]. Pet. 18. Petitioner’s reference to “layer 110’” appears to be in error because the Petition’s discussion for limitation 1[a] refers to layer 115 of Parkin, as does Dr. Bokor’s testimony related to limitations 1[a] and 1[d]. Pet. 10; Ex. 1024 ¶¶ 109, 136. amorphous, but contends that, as Parkin discloses, these layers may be annealed. Id. at 17. Petitioner, however, refers to Parkin’s disclosure that only “a portion of the storage layer 175” is crystallized after annealing. Id. at 17–18 (citing Ex. 1062, 18:51–55) (emphasis added). Petitioner also relies upon Parkin’s “thin crystalline ferromagnetic layer” that is crystallized to teach limitation 1[d]. Id. at 18 (citing Ex. 1062, 18:55–59; Ex. 1024 ¶¶ 131–132) (emphasis added). Dr. Bokor additionally testifies that it is “Parkin’s ‘thin crystalline ferromagnetic layer’ of CoFeB” that meets the “entirely crystallized” requirement of limitation 1[d]. Ex. 1024 ¶ 132. Parkin, however, states that a thin crystalline ferromagnetic layer is formed, but “the bulk of storage layer 175 remains amorphous.” Ex. 1062, 18:55–60 (emphasis added). Petitioner fails to reconcile how its assertions that the first and second ferromagnetic layers, which are mapped to the totality of layers of 115 and 175, meet the limitation that the first and second ferromagnetic layers are each “entirely crystallized” when Petitioner relies only a thin layer, that is, a portion, of the 115 and 175 layers for the teaching that the respective layers are entirely crystallized. Put another way, Petitioner’s mapping is inconsistent: Petitioner relies upon the full depth of certain “layers” of Parkin for the teaching of the ferromagnetic layers, but then only relies upon thin portion of that depth for the assertion that the “layers” are entirely crystallized.” slip op. at 16

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,367,138
  • PTAB · May 28, 2025 · IPR2025-00194 · APJ Robert J Weinschenk · IPR · Institution

    The Board denied institution under § 314(a), finding no reasonable likelihood for the remaining claims except claim 13, whose potential success did not justify instituting trial.

    RulingsInstitution decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “had “a bachelor’s degree in electrical engineering, computer engineering, or equivalent and at least two years of experience working with radio communication systems and machine learning.” Pet. 3 (citing Ex. 1003 ¶¶ 33–34). Petitioner’s description of the level of ordinary skill in the art is supported by the testimony of Petitioner’s declarant, Dr. Zhi Ding. Ex. 1003 ¶¶ 33–34. Patent Owner does not dispute Petitioner’s description at this stage of the proceeding. We adopt Petitioner’s description for the purposes of this Decision.” slip op. at 4

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “the same standard used in a civil action under 35 U.S.C. § 282(b), including construing the claim in accordance with the ordinary and customary meaning of the claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Neither party proposes an express construction for any claim terms. Pet. 13; Prelim. Resp. 16. We determine that no claim terms require express construction for purposes of this Decision.” slip op. at 5

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “reasonable likelihood of prevailing in showing that claims 4–6, 12, 14, and 16–22 would have been obvious over Jüschke and Holt. Petitioner may satisfy its burden for claim 13, but, as discussed below, that would not impact our decision to exercise our discretion under § 314(a) to deny institution. See Section II.F.” slip op. at 16

    • Other 314aInstitution denied discretionary otherInstitution denied

      “inter partes review. SAS Inst. v. Iancu, 584 U.S. 357, 366 (2018). Specifically, “[i]f a panel determines that a petition meets the standards for institution in relation to fewer than all the challenges presented, . . . the panel will evaluate all the challenges and determine whether, in the interests of efficient administration of the Office and integrity of the patent system, the entire petition should be denied.” See Consolidated Trial Practice Guide, 64 (Nov. 2019), available at https://www.uspto.gov/sites/default/files/ documents/tpgnov.pdf. Here, thirteen challenged claims remain after Patent Owner’s statutory disclaimer. Petitioner at most demonstrates a reasonable likelihood of prevailing for one dependent claim, which has no claims depending therefrom. See Sections II.C–II.E. Thus, based on the particular facts of this case, we find that instituting trial would not be an efficient use of the Board’s time and resources, and we exercise our discretion to deny institution under § 314(a). See Deeper, UAB v. Vexilar, Inc., IPR2018- 01310, Paper 7 at 41–43 (PTAB Jan. 24, 2019) (informative); Chevron Oronite Co. LLC v. Infineum USA L.P., IPR2018-00923, Paper 9 at 10–11 (PTAB Nov. 7, 2018) (informative).” slip op. at 16

    Claim construction§ 103 obviousnessDiscretionary denial
    Patents in suitUS 11,777,540
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · Apr 22, 2025 · IPR2025-00123 · APJ Robert J Weinschenk · IPR · Institution

    The Board denied institution of inter partes review of claims 1–8 and 13–25 under § 314(a), finding the trial date and district court investment outweighed Petitioner’s stipulation.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “The District Court recently denied Petitioner’s motion to stay without prejudice. Ex. 2003, 3. The District Court stated that Petitioner’s motion “is premature” because the Board has not decided “whether or not to institute inter partes review.” Id. We decline to speculate based on the record in this case whether the District Court would grant a renewed motion to stay the District Court Litigation. See Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 15 at 12 (PTAB May 13, 2020) (informative) (“Fintiv II”). As a result, we determine that the first Fintiv factor is neutral.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “G. Summary On balance, we determine that Fintiv factors 1–6 favor discretionary denial of institution. Specifically, as discussed above, factors 2, 3, and 5 each weigh in favor of discretionary denial, factor 4 weighs strongly against discretionary denial, and factors 1 and 6 are neutral. We determine that the projected trial date (at least six months before the projected statutory deadline for a final written decision) and the parties’ significant investment in the District Court Litigation outweigh Petitioner’s stipulation. Thus, based on our holistic view of the Fintiv factors, we exercise our discretion under § 314(a) to deny the Petition. III. CONCLUSION For the reasons discussed above, we exercise our discretion under § 314(a) to deny the Petition. IV. ORDER It is hereby ORDERED that the Petition is denied, and no trial is instituted.” slip op. at 10

    Discretionary denial
    Patents in suitUS 8,745,749
  • PTAB · Apr 21, 2025 · IPR2024-01477 · APJ Bach V Hoang · IPR · Institution

    The Board denied institution of IPR on claims 1–14 under § 314(a), finding that the Fintiv factors favoring denial outweighed the stipulation against denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “Statutory Deadline We weigh this factor as favoring the exercise of discretionary denial. The parties agree that the projected statutory deadline for issuing our Final Written Decision (April 23, 2026) is a little more than six months after trial is currently scheduled in the District Court litigation (October 6, 2025). Supp. Br. 4; Prelim. Resp. 19–20. Because the currently scheduled District Court trial is set to begin six months before our deadline to reach a final decision, this factor favors discretionary denial in this case. See Fintiv, Paper 11 at 9. C. Factor 3 – Investment in the Parallel Proceeding We weigh this factor as favoring the exercise of discretionary denial. Showing substantial investment in the District Court litigation, document production is substantially complete and fact discovery will be completed within two weeks of this Decision on Institution. Ex. 2001, 4–5 (Second Amended Docket Control Order). Further, a hearing on claim construction and associated briefing is complete. Id. And, the deadline to serve Institution. Id. at 4. These actions show that there has been notable investment by the parties in the District Court litigation. Furthermore, we must consider this parallel work in relation to the October 6, 2025 District Court litigation trial date, which is six months before the projected statutory deadline of our Final Written Decision. See Fintiv, Paper 11 at 10. As work in the District Court litigation has moved beyond preliminary stages into more advanced stages, instituting at this time implicates at least some duplicative costs. See id. On the matter of petition timing, it is often reasonable for a petitioner to wait to file its petition until it learns which claims are being asserted against it in the parallel proceeding. Fintiv, Paper 11 at 11. Here, Petitioner filed its petition on September 27, 2024, which is four months after receiving Patent Owner’s May 29, 2024 disclosure of asserted claims and infringement contentions and nine months after it was served Patent Owner’s December 29, 2023 infringement complaint. Ex. 1017; Ex. 1018, 1. Further, Petitioner served its amended invalidity contentions in the District Court litigation on December 17, 2024, i.e., after it filed its Petition.5 We do not find the timing of the Petition in this case to outweigh the significant investment in the District Court litigation. Considering the substantial investment in the District Court litigation and the rapidly advancing District Court litigation trial date balanced against the timing of the Petition, we determine this factor weighs in favor of discretionary denial.” slip op. at 11

    Discretionary denial
    Patents in suitUS 8,898,803
  • PTAB · Mar 27, 2025 · IPR2025-00049 · APJ Robert J Weinschenk · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving any challenged claim obvious over the asserted combinations.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may not be instituted unless “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Here, Petitioner does not demonstrate a reasonable likelihood of prevailing in showing that at least one of the challenged claims is unpatentable. Thus, the Petition is denied, and no trial is instituted.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “had “a bachelor’s degree in electrical engineering, computer engineering, or an equivalent degree and at least two years of experience working with . . . radio communication systems and machine learning.” Pet. 3 (citing Ex. 1003 ¶¶ 33–34). Petitioner’s description of the level of ordinary skill in the art is supported by the testimony of Petitioner’s declarant, Dr. Zhi Ding. Ex. 1003 ¶¶ 33–34. Patent Owner does not dispute Petitioner’s description at this stage of the proceeding. We adopt Petitioner’s description for the purposes of this Decision.” slip op. at 4

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “B. Claim Construction In an inter partes review proceeding, a patent claim is construed using the same standard used in a civil action under 35 U.S.C. § 282(b), including construing the claim in accordance with the ordinary and customary meaning of the claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Neither party proposes an express construction for any claim terms. Pet. 13; Prelim. Resp. 9–10. We determine that no claim terms require express construction for purposes of this Decision.” slip op. at 5

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “On this record, we agree with Patent Owner. Claim 1 recites “generating a pre-distorted radio signal by processing the transmit radio signal using a nonlinear pre-distortion machine learning model.” Ex. 1001, 14:19–24. This portion of claim 1 requires processing a transmit signal using a machine learning model. Id. Claim 1 also recites “updating the model parameters based on a distance metric computed between the transmit radio signal and a received signal that is obtained from the one or more radio receivers.” Id. at 14:30–35. This portion of claim 1 requires updating model parameters based on a distance metric computed using a received signal obtained from a receiver. Id. Thus, together, these portions of claim 1 require updating parameters for a transmit model based on a distance metric computed using a signal obtained from a receiver.” slip op. at 7

    Claim construction§ 103 obviousness
    Patents in suitUS 10,581,469
Page 1 of 23
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.