  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jun 25, 2025 · IPR2024-01280 · APJ Jo-Anne M Kokoski · IPR · Remand

    On remand, the Board denied institution under § 314(a), finding the Fintiv factors favored denial despite declining to deny under § 325(d).

    RulingsRemand decision
    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDecided for petitioner

      “Other than initials on a lengthy IDS, nothing in the record indicates that the Examiner substantively considered Takeuchi, Kim, Pienemann, or among over 1,000 other references listed on the IDS, which, as noted in the Director Review Decision, “is over 40 times the size of a typical IDS.” Pet. Remand Br. 5–6; DR Dec. 7 n.3 (citing Setting and Adjusting Patent Fees During Fiscal Year 2025, 89 FR 91898 at 91924 (Nov. 20, 2024)); Ex. 1002, 228–284. Petitioner also shows that the applicant did not respond to the Examiner’s request that the applicant specifically point out “any particular reference or portion of a reference in the [IDS] which the examiner should take [sic] pay particular attention to.” Ex. 1002, 174, 295– 302.” slip op. at 13

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “Patent Owner is likely correct that the ITC would not have been inclined to grant a stay if one had been requested at the time the Institution Decision issued. Moreover, the ITC conducted a full evidentiary hearing a month after the Institution Decision issued, and the target date for the ITC’s final determination is several months before the projected statutory deadline for the Board’s final written decision. PO Remand Br. 7. Accordingly, we determine that Fintiv factor 1 weighs in favor of discretionary denial. See also Klein Tools, Inc. v. Milwaukee Electric Tool Corp., IPR2024-01400, Paper 22 at 2 (PTAB June 9, 2025) (Acting Director Stewart determining that Fintiv factor 1 weighs in favor of discretionary denial when the ITC investigation is unlikely to be stayed, the ITC already conducted a full evidentiary hearing, and the ITC final determination is expected to issue six months before the statutory deadline for the Board’s final written decision).” slip op. at 19

    Discretionary denialcites Phillips
    Patents in suitUS 11,925,202
  • PTAB · Jun 25, 2025 · IPR2024-01406 · APJ Jo-Anne M Kokoski · IPR · Remand

    On remand, the Board denied institution of review of claims 1, 3, 4, 8–13, and 15 under § 314(a), finding the Fintiv factors favored discretionary denial.

    RulingsRemand decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “stay or evidence exists that one may be granted if a proceeding is instituted.” Fintiv, Paper 11 at 6. A stay of litigation pending resolution of an inter partes review allays concerns about inefficiency and duplication of efforts, and strongly weighs against exercising our authority to deny institution. Fintiv, Paper 11 at 6. The Guidance Memo states that “the Board will apply the Fintiv factors when there is a parallel proceedings at the International Trade Commission.” Guidance Memo 2. Patent Owner asserts that a stay of the ITC Investigation had not been requested at the time of the Institution Decision,7 and argues that “the ITC does not stay investigations pending IPR.” PO Supp. Br. 4. Patent Owner also notes that the Institution Decision issued “just days before the ITC evidentiary hearing.” Id. Accordingly, Patent Owner argues that this factor favors denial. Id. Patent Owner is likely correct that the ITC would not have been inclined to grant a stay if one had been requested at the time the Institution Decision issued. Moreover, the ITC conducted a full evidentiary hearing less than three weeks after the Institution Decision issued, and the target date for the ITC’s final determination is four months before the statutory deadline for the Board’s final written decision. PO Supp. Br. 5. Accordingly, we” slip op. at 9

    Discretionary denial
    Patents in suitUS 11,925,202
  • PTAB · Jun 6, 2025 · IPR2025-00065 · APJ Brian D Range · IPR · Institution

    The Board denied institution of IPR challenging claims 1–44 under § 314(a), finding the Fintiv factors favoring denial outweighed the Petition’s strong merits.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “stipulation would only eliminate the District Court’s consideration of Haddad204. Despite the stipulation, the District Court would still have to consider invalidity of every claim the Petition addresses and would still have to consider the Alie, Baggenstoss, and Park references. Cf. Stellar at 4 (“Petitioner’s invalidity arguments in the district court are more expansive and include combinations of the prior art asserted in these proceedings with unpublished system prior art, which Petitioner’s stipulation is not likely to moot.”). In other words, “Petitioner’s stipulation does not ensure that [this proceeding] would be a ‘true alternative’ to the district court proceeding.” Id. at 3–4. Because of the remaining overlap between the Petition and the District Court proceeding, Fintiv factor four weighs strongly in favor of discretionary denial.” slip op. at 15

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundOther

      “for back side illumination (BSI), which appears to teach or suggest a textured region with surface features “located on the light incident side of the semiconductor layer and configured to interact with incident [EMR].” Pet. 22–27 (citing Ex. 1006, Fig. 5, ¶¶ 53, 68, 96; Ex. 1004 ¶¶ 39–40, 88–95, 101–107). As Petitioner and its expert explain, a person of ordinary skill in the art would have been motivated to modify Figure 5 of Alie into a BSI device because BSI devices allow more incident light to reach the semiconductor layer, resulting in more light being absorbed, an increase in the quantum efficiency, and an improvement in the signal to noise ratio. Pet. 25–26 (citing Ex. 1006 ¶¶ 68, 70; Ex. 1004 ¶¶ 39–40, 92, 95). Patent Owner argues that Alie does teach, suggest, or disclose “a textured region comprising a plurality of shallow trench isolation features.” Prelim. Resp. 9–11. But it appears Petitioner has at least shown Alie teaches or suggests this element. See discussion supra. Patent Owner further argues that Petitioner fails to present any proof that a person of ordinary skill in the art would have been motivated to modify Figure 5 of Alie into a BSI device. Id. at 11–15. But, in our view, Petitioner has provided an adequate motivation to modify Alie—so that more light will be absorbed, yielding an increase in the quantum efficiency and an improvement in the signal to noise” slip op. at 18

    • Parallel petitionsNot reached

      “17 Petitioner filed petitions for IPR2025-00064 and IPR2025-00065 at the same time. Both petitions address the ’682 patent but apply different art. Patent Owner also argues the second petition (IPR2025-00065) should be denied because one petition is sufficient. Patent Owner’s Response to Petitioner’s Notice Ranking Parallel Petitions, Paper 11. Because we deny institution based on Fintiv discretion, it is not necessary to reach Patent Owner’s multiple petition argument.” slip op. at 20

    § 103 obviousnessDiscretionary denialcites KSR
    Patents in suitUS 10,347,682
  • PTAB · Jun 6, 2025 · IPR2025-00064 · APJ Brian D Range · IPR · Institution

    The Board denied institution of IPR challenging claims 1–44 under § 314(a), finding the Fintiv factors favoring denial outweighed the petition’s strong merits.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “arguments, and evidence presented in the parallel proceeding.” Fintiv at 12 (emphasis added). “[A] timely-filed Sotera stipulation . . . from a petitioner”—“that, if an IPR . . . is instituted, the petitioner will not pursue in district court . . . any ground raised or that could have been reasonably raised in the IPR”—“is highly relevant, but will not be dispositive by itself. Instead, the Board will consider such a stipulation as part of its holistic analysis under Fintiv.” March 2025 Fintiv Guidance 2–3. Here, Petitioner’s invalidity contentions in the district court case cover” slip op. at 14

    • Parallel petitionsNot reached

      “18 Petitioner filed petitions for IPR2025-00064 and IPR2025-00065 at the same time. Both petitions address the ’682 patent but apply different art. Patent Owner also argues the second petition (IPR2025-00065) should be denied because one petition is sufficient. Patent Owner’s Response to Petitioner’s Notice Ranking Parallel Petitions, Paper 11. Because we deny institution based on Fintiv discretion, it is not necessary to reach Patent Owner’s multiple petition argument.” slip op. at 22

    Discretionary denialcites KSR
    Patents in suitUS 10,347,682
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · May 21, 2025 · IPR2025-00161 · APJ Monica S Ullagaddi · IPR · Institution

    The Board denied institution of IPR challenging claims 1–18 under § 314(a), concluding that the Fintiv factors, viewed holistically, favored discretionary denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied fintivInstitution denied

      “The standard for institution is set forth in 35 U.S.C. § 314, which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows that “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314 (2019); see also 37 C.F.R § 42.4(a) (2019) (“The Board institutes the trial on behalf of the Director.”). Upon consideration of the parties’ contentions and the evidence of record, we exercise our discretion to deny institution.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “view of a parallel proceeding, we consider the following factors: 1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 7 Japanese Unexamined Patent Application Publication No. 2009–188316 A, published Aug. 20, 2009 (Ex. 1011). A certified translation, to which we cite, is provided (Ex. 1012, “Yamada”). 8 E. Fred Schubert, LIGHT-EMITTING DIODES, 2nd ed., 163–190, 2006 (Ex. 1013, “Schubert”). discretion, including the merits. Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 5–6 (PTAB Mar. 20, 2020) (precedential) (“Fintiv”). “These factors relate to whether efficiency, fairness, and the merits support the exercise of authority to deny institution in view of an earlier trial date in the parallel proceeding.” Id. In evaluating these factors, we “take[] a holistic view of whether efficiency and integrity of the system are best served by denying or instituting review.” Id. at 6. We consider each of these factors below.” slip op. at 4

    Discretionary denial
    Patents in suitUS 11,721,714
Page 1 of 14
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.