- Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Apr 28, 2025 · IPR2024-01500 · APJ Neil T Powell · IPR · Institution
Institution of IPR challenging claims 1–5 was denied because Petitioner did not show a reasonable likelihood of prevailing on any asserted obviousness ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons that follow, we do not institute inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s degree in electrical engineering, computer engineering, computer science, physics, or an equivalent field, and two years of experience with cellular telecommunications, radio-access network architectures and protocols, and signal propagation in wireless networks.” Pet. 7 (citing Ex. 1003 ¶ 54). Petitioner further proposes that “[m]ore education can supplement practical experience and vice versa.” Id. (citing Ex. 1003 ¶ 54). 6 Elgamal, U.S. Patent No. 6,898,248 B1, issued May 24, 2005 (Ex. 1008, “Elgamal”). 7 Frank et al., U.S. Patent Application Publication No. 2003/0035469 A1, published Feb. 20, 2003 (Ex. 1006, “Frank”). 8 Zha et al., “Soft-Decision Successive Interference Cancellation CDMA Receiver with Amplitude Averaging and Robust to Timing Errors,” Proc. IEEE Global Telecommunications Conference, 2001 (GLOBECOM ’01), vol. 2, 2001, pp. 743–747 (Ex. 1010, “Zha”). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’703 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 7
- Expert testimonyPetitioner expert discountedDecided for patent owner
“provide sufficiently persuasive evidence in support of its position that claim 1’s “decoders” has a meaning broad enough to correspond to Zha’s decision rule. Petitioner disputes Patent Owner’s understanding of claim 1’s “decoders” by arguing that “[Patent Owner] does not argue that the specification disclaims decoders that do not perform error correction, or otherwise expressly limits the claimed bank of decoders to error correction.” Prelim. Reply 6. In support of its position, Petitioner cites Dr. Min’s testimony that “[i]n my opinion, a [person of ordinary skill in the art] would have understood that the ‘decision rule’ would be implemented using a decoder, as decoders typically make bit decisions.” Ex. 1003 ¶ 178; Pet. 59. Dr. Min does not cite any objective evidence in support of this view. Ex. 1003 ¶ 178. In response, Patent Owner marshals intrinsic evidence, along with Dr. Caire’s testimony based on objective supporting evidence. Prelim. Resp. 47–48; Prelim. Sur-Reply 5–6. For example, arguing that all embodiments disclosed in the ’703 patent use error-correcting coding, Patent Owner emphasizes the ’703 patent’s statement that “the [’703 patent’s] specification states that ‘[t]he invention is based on an iterative decoding solution that exploits error correction codes.’” Prelim. Sur-Reply 6 (quoting Ex. 1001, 25:27–29 (emphasis added by Patent Owner)). Patent Owner also cites the Abstract of the ’703 patent, which states that “[t]he present invention provides Turbo-decoding for joint signal demodulation based on an iterative decoding solution that exploits error correction codes.” Ex. 1001, code (57); Prelim. Sur-Reply 6. Patent Owner also cites Dr. Caire’s testimony that “any reasonable understanding of a decoder is one that implements an error correction coding approach.” Ex. 2001 ¶ 98; Prelim. Resp. 47. Dr. Caire cite objective evidence that supports this view. Ex. 2001 ¶ 98 (citing Ex. 2003, 3; Ex. 2004, 11; Ex. 2005, 228). Weighing the parties’ arguments and evidence, we find Patent Owner’s more persuasive than Petitioner’s. Starting with the intrinsic evidence, Patent Owner’s citation of the ’703 patent’s repeated statements that the “invention . . . exploits error correction codes” is more persuasive than Petitioner’s argument that the ’703 patent does not disclaim other approaches. Prelim. Sur-Reply 6 (citing Ex. 1001, 25:27–29, code (57)); Prelim. Reply 6. Petitioner argues that certain background documents suggest decoders may have a broad meaning, but this attorney argument warrants less weight than Dr. Caire’s testimony. Prelim. Reply 7 (citing Ex. 2003, 18–20; Ex. 2004, 7, 9). Accordingly, in sum, Petitioner does not” slip op. at 16
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not reached
“In view of all the parties’ arguments and evidence, we do not find a reasonable likelihood of Petitioner prevailing on this issue. When questioning who exactly had rights to which specific inventions of Mr. McElwain’s, Petitioner glosses over the key, undisputed fact that Mr. McElwain assigned the invention of the ’703 patent to the exact same entity to which Brommer was assigned, specifically BAESI. Ex. 2012, 2; Ex. 2011, 2. Mr. McElwain did so shortly after BAE filed Mr. McElwain’s provisional application on April 14, 2003, which both parties treat as the ’703 patent’s date of invention. Ex. 2012, 2; Ex. 2013, 1; Prelim. Resp. 32; Prelim. Reply 1. This, in combination with Patent Owner’s evidence regarding Mr. McElwain’s EPIIA and BAE’s acquisition of Lockheed Martin’s Aerospace Electronics System Business, evinces that Mr. McElwain had an obligation on April 14, 2003, to assign the invention of the ’703 patent to BAESI. Exs. 2014–2016. As Patent Owner notes, Petitioner does not advance a reason that Mr. McElwain would not have been obligated on April 14, 2003, to assign the invention of the ’703 patent to BAESI, much less provide evidence that he was not so obligated. See generally Prelim. Reply; Prelim. Sur-Reply 2. In sum, weighing the parties’ arguments and evidence, we do not find that Petitioner has a reasonable likelihood of prevailing on its position that Brommer is prior art to the ’703 patent for purposes of obviousness. Accordingly, we do not find that Petitioner has demonstrated a reasonable likelihood of prevailing on any of its assertions that the claims of the ’703 patent would have been obvious over Brommer in combination with other references.” slip op. at 20
§ 103 obviousnesscites PhillipsPatents in suitUS 7,463,703 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached
“IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,089,946 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13
- BurdenNot shown unpatentable
“We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,814,071 - Cellco Partnership D/B/A Verizon Wireless / T-Mobile USA, Inc. et al. v. Aspen Networks, Inc.Institution deniedPTAB · Mar 17, 2025 · IPR2025-00008 · APJ Donald E Daybell · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–28 were unpatentable over Tagg or Kottilingal and Politis.
RulingsInstitution decision- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner
“There is, however, a consistent thread that flows through the relevant disclosures of the specification; namely, that the “state involving the SIP sequence” is maintained throughout a dialog. Ex. 1001, 5:1–38 (step 210); see also id. (step 160). Using the method of Figure 4, including steps 160 and 210 and maintaining the SIP signaling state, is how the ’554 Patent discloses that calls are not broken or dropped. See, e.g., id. at 7:10–25. Maintaining the “state” of the SIP signaling sequence includes (but is not limited to) the teachings that a “SIP signaling sequence number” is maintained, as well as the details of how that number is maintained, as set forth in the specification. We find that the state of the SIP signaling sequence as that term is used in the specification refers to the rules (or paradigm) used to identify a collection of SIP signals as a “SIP signaling sequence,” and in particular the rules used to identify the next SIP packet received as belonging to a sequence of packets previously received. One key to the disclosed invention discussed in the specification is the concept that the invention prevents a call 3:45–4:9. The specification contends that the invention accomplishes this goal by configuring the packets involved in a VoIP call such that the receiving device (e.g., a SIP server) is able to recognize those packets as belonging to the same call, even though the packets are received over different paths. Id. at 7:35–50; 7:60–8:3. The particular way that the receiving devices are able to recognize that the packets are part of the same call is, per the claims, because the SIP signaling sequence is maintained after a network switch. Id. at 8:27–29. Thus, where a sequence of SIP signals uses numbers such as cseq values, there is a rule for identifying what the next signal in the sequence is. Ex. 1001, 5:1–38. A receiving device that knows the rule can identify an incoming packet as the next packet in the same signaling sequence as previously received packets, by applying the rule. Id. at 7:35–50. The specification provides one example rule, that the next SIP signal bears a monotonically-increasing cseq number. Id. at 5:1–38. But there could be other such rules as well. For example, the value could be monotonically decreased, or the value could be determined using some other formula.8 The claims also do not require that the sequence of SIP signals use “numbers” as sequence identifiers.9 Other labeling paradigms could be possible as well, 8 Patent Owner’s litigation claim construction improperly imports implementation details from the preferred embodiment, such as “cseq numbers” and the limitations that these numbers “monotonically increase” for new transmissions, or be “preserved” for re-transmissions. While such embodiments would be one way of maintaining a SIP signaling sequence, the specification does not clearly limit the invention to only these embodiments. 9 Petitioner’s litigation claim construction improperly imports the limitation from the preferred embodiment that the SIP signaling sequence must be” slip op. at 14
- Skill levelSkill level board ownDecided for patent owner
“as of the time of the invention of the ’554 Patent “would have been familiar with designing rules for implementing policies for service plans for use of an access network and provisioning those rules to network elements for policy enforcement” and would have gained this knowledge through a mixture of training and work experience, such as by having a Bachelor’s degree in electrical engineering or computer science and two years of experience; or by obtaining a Master’s degree in electrical engineering or computer science, but having only one year of experience; or by having no formal education but experience in network service plan provisioning systems of at least four years. Pet. 10. 4 The Leahy-Smith America Invents Act (“AIA”), Pub. L. No. 112–29, 125 Stat. 284, 287–88 (2011), amended 35 U.S.C. § 103. Because the ’554 Patent was filed before the effective date of the relevant amendment, the pre- AIA version of §103 applies. that a POSITA must specifically have “been familiar with designing rules for implementing policies for service plans for use of an access network and provisioning those rules to network elements for policy enforcement.” Prelim. Resp. 17–18. At this juncture, we adopt the agreed-upon portion of Petitioner’s definition, without the specific requirement relating to designing rules. This definition appears to be consistent with what is reflected by the content of the applied prior art references. Cf. Okajima v. Bourdeau, 261 F.3d 1350, 1354–55 (Fed. Cir. 2001) (recognizing that the applied prior art may reflect an appropriate level of skill). Our analysis would be the same under either definition.” slip op. at 8
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“determine whether to institute review. Upon consideration of the arguments and evidence before us, we conclude that Petitioner has not shown a reasonable likelihood of success in establishing that any claim of the ’554 Patent is unpatentable, and thus we decline to institute review. The Petition is denied, and inter partes review is not instituted.” slip op. at 2
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable
“We disagree with Petitioner’s view of Tagg. At best, the cited portions of Tagg disclose that SIP is used by endpoint 1512 to communicate with SIP server 1500, and by the SIP server to communicate with SIP proxy 1504. Figure 15 discloses that SIP is used for both of the paths from endpoint 1520 to SIP server 1500, via the WWAN or the WLAN. Figure 15 further discloses that SIP is used for the path from SIP server 1500 to SIP proxy 1504. But Figure 15 and the accompanying text are silent about any “sequences” of SIP signals at all, much less whether any such “sequences” are maintained, as required by the language of limitation 1.6. Ex. 1005 ¶¶ 324–346, Fig. 15. Instead, Tagg’s specification simply discloses that SIP is used to perform call management functions. Id. ¶¶ 245–247. Tagg’s cases 1 and 6, relied on by Petitioner, teach that Tagg’s server can ensure that the end user appears to the rest of the world (i.e. the devices upstream of the SIP server) as if no network change is being made. Ex. 1005 ¶ 320. Tagg further teaches that either “make before break” or “make and break” schemes may be used. Id. But these cases do not explain how any SIP signaling sequences are used, much less how or even that any SIP signaling sequence is maintained when a network switches. At most, Tagg teaches that each path will have an IP (Internet Protocol) address, which may be the same or different for each path. Id. ¶ 288. But IP addresses are part of the IP disclosing or suggesting that IP addressing schemes are maintained or otherwise accounted for in a network switch, that would not be sufficient to disclose or suggest that SIP signal sequences are maintained. Furthermore, under our construction of limitation 1.6, it must be shown that the same rules or paradigm used to identify that an incoming SIP packet is the next SIP packet in a sequence, regardless of whether that packet is transmitted on the first network path or the one of a plurality of alternative network paths. The Petition is silent on this point. The closest Petitioner comes is the assertion that Figure 15 depicts preservation of “the same SIP signaling sequence,” with the Petitioner’s explanation being that Tagg allows simultaneous connections across a WWAN and a WLAN, and that “POSITAs would have understood that Tagg’s SIP protocol uniformity in directionality teaches that a ‘SIP signaling sequence . . . is maintained.’” Pet. 39–40.” slip op. at 22
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,009,554 - Ens Labs Ltd. v. Unstoppable Domains Inc.Institution deniedPTAB · Nov 22, 2024 · IPR2024-00872 · APJ Michael J Strauss · IPR · Institution
The Board denied institution for claims 1–20 because Petitioner did not show a reasonable likelihood of prevailing on any ground, relying on Johnson’s unproven status as a printed publication.
RulingsInstitution decision- Skill levelSkill level board ownDecided for patent owner
“Patent Owner does not contest Petitioner’s description with regard to the level of skill at this stage of the proceedings. Prelim. Resp. 12. As Petitioner’s unchallenged description of the level of ordinary skill appears appropriate to the subject matter of the ’344 patent and the cited prior art, we apply it for purposes of this Decision, albeit without the two instances of the phrase “at least,” which introduce ambiguity. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (acknowledging that the prior art may reflect an appropriate level of skill in the art).” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Neither party proposes express construction of any claim terms for our consideration. See Pet. 14 (“Petitioner submits that all claim terms in the ’344 Patent may be interpreted according to their plain and ordinary meaning.”); Prelim. Resp. 12 (“For purposes of this Preliminary Response only, Patent Owner agrees that claim construction is unnecessary.”). whether to institute inter partes review. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). At this stage, we do not see the need to construe any claim terms to resolve the issues in dispute.” slip op. at 8
- Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication not establishedNot shown unpatentable
“of a document on a website archived by the Internet Archive. See Ex. 1018. That a person might have been able to download Johnson through public means is not evidence that Johnson was “made available to the extent that persons interested and ordinarily skilled in the subject matter or art exercising reasonable diligence, can locate it.” Bruckelmyer, 445 F.3d at 1378. The Frank-White Affidavit’s evidence of public accessibility amounts to little more than Johnson was available on the Internet by December 13, 2019. Pet. 15; Ex. 1018 ¶¶ 1–5, 7, Ex. B. However, because the Wayback Machine is only searchable by URL, as attested to in the Frank-White Affidavit, this does not suffice to support that one of ordinary skill in the art would have sought out the Read the Docs website and, once there, located Johnson without prior knowledge of Johnson and the URL at which Johnson was available. Accordingly, the Frank-White Affidavit alone is insufficient to prove public accessibility of Johnson.” slip op. at 20
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“that Johnson qualifies as a prior art printed publication. All asserted grounds for unpatentability rely, at least in part, on the disclosure of Johnson. Accordingly, because the record does not persuasively support Johnson as a publicly accessible printed publication, we find that Petitioner has not established a reasonable likelihood of prevailing on any of its grounds of unpatentability. III. CONCLUSION After considering the evidence and arguments presented in the Petition and the Preliminary Response, we determine that Petitioner does not demonstrate a reasonable likelihood of prevailing with respect to any of the challenged claims, and thus, we do not institute an inter partes review. ORDER In consideration of the foregoing, it is hereby ORDERED that the Petition is denied as to all challenged claims, and no trial is instituted.” slip op. at 25
Claim construction§ 102 anticipationcites PhillipsPatents in suitUS 11,558,344 - Inari Agriculture, Inc. v. Pioneer Hi-Bred International, Inc.Institution deniedPTAB · Nov 1, 2024 · PGR2024-00025 · APJ Jeffrey W Abraham · PGR · Institution
The Board denied institution because Petitioner did not show that claims 1–20 were more likely than not unpatentable over either obviousness ground, for lack of utility, or as indefinite.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“Institution of a post-grant review is authorized by statute when “the information presented in the petition filed under [35 U.S.C. §] 321 . . . demonstrates that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). For the reasons set forth below, we determine that Petitioner has failed to demonstrate that it is more likely than not that at least one of claims 1–20 of the ’033 patent is unpatentable. Accordingly, we deny institution of a postgrant review of claims 1–20 based on the grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“level of skill, with a doctoral degree in plant breeding or a related field, at least five years of experience with corn breeding, and additional experience interfacing with laboratory-side personnel (including a computational biologist along with genetics specialists) and field-side personnel.” Pet. 15 (citing Ex. 1003 ¶¶ 19–22, 44–45). Petitioner also states that, “[a]lternatively, additional experience could take the place of an advanced degree.” Pet. 15. Patent Owner states that it “does not dispute Petitioner’s definition of the qualifications of person of skill in the art” and “reserves its right to challenge Petitioner’s definition and to provide its own definition, should trial be instituted.” Prelim. Resp. 25. Petitioner’s unopposed proposed definition is consistent with the cited prior art and the disclosure of the ’033 patent, and we adopt it for purposes of this Decision. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that the prior art itself may “reflect[] an appropriate level”” slip op. at 6
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner does not offer a specific construction for any claim terms. Pet. 19–20. Rather, Petitioner contends that “the outer boundary of the Challenged Claims lacks reasonable certainty,” and, therefore, “the Challenged Claims are unpatentable as indefinite under §112(b).” Pet. 20. Petitioner further contends that the challenged claims are unpatentable as obvious “regardless of the outer boundary of the claims.” Pet. 21. Patent Owner disagrees with Petitioner’s arguments regarding indefiniteness, and does not construe any claim terms. See generally Prelim. Resp. As explained in detail below, based on the record before us, we are not persuaded by Petitioner’s indefiniteness arguments, and determine that none of the claim terms require an explicit construction to determine whether to institute post-grant review. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary” slip op. at 7
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableReasonable expectation not foundNot shown unpatentable
“Patent Owner is correct that Petitioner focuses its obviousness challenge on 1PNZQ23’s phenotype, and does not address its genotype. Prelim. Resp. 41–42; see Pet. 26–32 (comparing 1PNZQ23’s phenotype with the phenotypes of the asserted prior art). Petitioner does not direct us to, nor do we discern, any information in the Petition or Reply regarding 1PNZQ23’s genotype that supports Petitioner’s arguments regarding obviousness. Furthermore, Patent Owner offers information suggesting that “the breeding of 1PNZQ23 was unpredictable even with both parents being known in the art.” Prelim. Resp. 47. Dr. Schnable addresses unpredictability in the breeding process, stating: distinct even when the F1 plant itself results from a cross of two inbreds. A [person of ordinary skill in the art] would not expect that a cross of the same parents will produce F2 or D1 progeny identical to 1PNZQ23. . . . [T]he genome of a progeny plant is the result of genetic segregation and recombination in the F1 plant of the two parental genomes and the chance of the exact same child resulting from that initial biparental cross is infinitesimally small. Ex. 2004 ¶ 123. This information undermines Petitioner’s arguments regarding an expectation of success in achieving the claimed invention.” slip op. at 13
Claim construction§ 101 eligibility§ 103 obviousness§ 112 disclosureDiscretionary denialcites PhillipsPatents in suitUS 11,707,033 - Inari Agriculture, Inc. v. Pioneer Hi-Bred International, Inc.Institution deniedPTAB · Oct 15, 2024 · PGR2024-00023 · APJ Jeffrey W Abraham · PGR · Institution
The Board denied institution on claims 1–20 because the petition did not show they were unpatentable on any asserted obviousness, utility, written-description, or enablement ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Institution of a post-grant review is authorized by statute when “the information presented in the petition filed under [35 U.S.C. §] 321 . . . demonstrates that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). For the reasons set forth below, we determine that Petitioner has failed to demonstrate that it is more likely than not that at least one of claims 1–20 of the ’545 patent is unpatentable. Accordingly, we deny institution of a postgrant review of claims 1–20 based on the grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“level of skill, with a doctoral degree in plant breeding or a related field, at least five years of experience with corn breeding, and additional experience interfacing with laboratory-side personnel (including a computational biologist as along with genetics specialists) and field-side personnel.” Pet. 16 (citing Ex. 1003 ¶¶ 50–51). Petitioner also states that, “[a]lternatively, additional experience could take the place of an advanced degree.” Pet. 16. Patent Owner states that it “does not dispute Petitioner’s definition of the qualifications of person of skill in the art” and “reserves its right to challenge Petitioner’s definition and to provide its own definition, should trial be instituted.” Prelim. Resp. 24. Petitioner’s unopposed proposed definition is consistent with the cited prior art and the disclosure of the ’545 patent, and we adopt it for purposes” slip op. at 6
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. [§] 282(b).” 37 C.F.R. § 42.200(b) (2019). Under that standard, the words of a claim are generally given their “ordinary and customary meaning,” which is the meaning the term would have to a person of ordinary skill at the time of the invention, in the context of the entire patent including the specification. Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). Petitioner contends that “[b]ecause Petitioner’s grounds plainly render the claims unpatentable under any plausible construction, no outer boundary constructions are necessary.” Pet. 21. Patent Owner also does not construe any claim terms. See generally Prelim. Resp. For purposes of this Decision, and based on the record before us, we determine that none of the claim terms require an explicit construction to determine whether to institute post-grant review. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). slip op. at 7
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableReasonable expectation not foundNot shown unpatentable
“additional reasons. For example, we agree with Patent Owner that Petitioner fails to demonstrate sufficiently that a person of ordinary skill in the art would have had a reasonable expectation of success in arriving at PH4CYJ based on Smalley’s disclosure alone. Prelim. Resp. 51–52. According to the ’545 patent specification, the claimed PH4CYJ inbred maize variety is a cross between inbred line PH1VNA and inbred line PH1KTF. Ex. 1001, 37:62–64. In the simplest terms, PH1VNA and PH1KTF are the parents, and their cross ultimately resulted in the inbred variety PH4CYJ. The ’545 patent explains that after the initial crossing of the parental lines, the” slip op. at 14
Claim construction§ 101 eligibility§ 103 obviousness§ 112 disclosurecites PhillipsPatents in suitUS 11,696,545 - Inari Agriculture, Inc. v. Pioneer Hi-Bred International, Inc.Institution deniedPTAB · Sep 24, 2024 · PGR2024-00019 · APJ Ulrike W Jenks · PGR · Institution
The Board denied institution of PGR on claims 1–20 because the Petition did not show they were more likely than not unpatentable on any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Institution of a post-grant review is authorized by statute when “the information presented in the petition filed under [35 U.S.C. §] 321 . . . demonstrates that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). For the reasons set forth below, we determine that Petitioner failed to demonstrate that it is more likely than not that claims 1–20 of the ’803 patent are unpatentable. Accordingly, we deny institution of a post-grant review of claims 1–20 based on the grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedOther
“Patent Owner states that it “does not dispute Petitioner’s definition of the qualifications of person of skill in the art” and “reserves its right to challenge Petitioner’s definition and to provide its own definition, should trial be instituted.” Prelim. Resp. 24. Petitioner’s unopposed proposed definition is consistent with the cited prior art and the disclosure of the ’803 patent, and we adopt it for purposes of this Decision. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that the prior art itself may “reflect[] an appropriate level” of ordinary skill in the art) (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985)).” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner contends that “[b]ecause Petitioner’s grounds plainly render the claims unpatentable under any plausible construction, no outer boundary constructions are necessary.” Pet. 20. Patent Owner also does not construe and based on the record before us, we determine that none of the claim terms requires an explicit construction to determine whether to institute post-grant review. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundReasonable expectation not foundNot shown unpatentable
“their cross ultimately resulted in the inbred variety 1PFLQ21. The ’803 patent explains that after the initial crossing of the parental lines, the selection of the progeny was based on genetic analysis predicting disease, insect, and agronomic phenotypic performance. Id. 37:64–66. “Inbred 1PFLQ21 was developed by producing a doubled haploid from the F1 plants, selfing and using pedigree selection amongst the D1 lines, and selfing and bulking from the subsequent generations.” Id. 37:66–38:3. The ’803 patent specification, therefore, makes it clear that simply crossing both parental inbred maize lines is not reasonably expected to result in the claimed inbred maize variety; rather, it explains that more plant breeding work is required to arrive at the 1PFLQ21 inbred maize line than just having both parental inbred maize lines available.” slip op. at 15
Claim construction§ 101 eligibility§ 103 obviousnessDiscretionary denialcites PhillipsPatents in suitUS 11,659,803 - Inari Agriculture, Inc. v. Pioneer Hi-Bred International, Inc.Institution deniedPTAB · Sep 24, 2024 · PGR2024-00020 · APJ Jeffrey W Abraham · PGR · Institution
Denied institution of PGR on claims 1–20 because Petitioner did not show a reasonable likelihood equivalent under § 324 that any challenged claim was unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Institution of a post-grant review is authorized by statute when “the information presented in the petition filed under [35 U.S.C. §] 321 . . . demonstrates that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). For the reasons set forth below, we determine that Petitioner has failed to demonstrate that it is more likely than not that at least one of claims 1–20 of the ’020 patent is unpatentable. Accordingly, we deny institution of a postgrant review of claims 1–20 based on the grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedOther
“Petitioner asserts that a person of ordinary skill in the art “had a high level of skill, with a doctoral degree in plant breeding or a related field, at least five years of experience with corn breeding, and additional experience interfacing with laboratory-side personnel (including a computational biologist . . . along with genetics specialists) and field-side personnel.” Pet. 15 (citing Ex. 1003 ¶¶ 19–21). Petitioner also states that, “[a]lternatively, additional experience could take the place of an advanced degree.” Pet. 15. Patent Owner states that it “does not dispute Petitioner’s definition of the qualifications of person of skill in the art,” but “reserves its right to challenge Petitioner’s definition and to provide its own definition, should trial be instituted.” Prelim. Resp. 25. Petitioner’s unopposed proposed definition is consistent with the cited prior art and the disclosure of the ’020 patent, and we adopt it for purposes of this Decision. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that the prior art itself may “reflect[] an appropriate level” of ordinary skill in the art) (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985)).” slip op. at 6
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner contends that “[b]ecause Petitioner’s grounds plainly render the claims unpatentable under any plausible construction, no outer boundary constructions are necessary.” Pet. 22. Patent Owner also does not construe any claim terms. See generally Prelim. Resp. For purposes of this Decision, and based on the record before us, we determine that none of the claim terms require an explicit construction to determine whether to institute post-grant review. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable
“Based on these disclosures in Smalley, we agree with Petitioner that a person of ordinary skill in the art would have understood that the parental line PH1D84 could have been used as a starting point to arrive at other inbred lines. See Pet. 41. Petitioner, however, fails to demonstrate sufficiently how or why a person of ordinary skill in the art would have had a reasonable expectation of success in developing 1PFHC43 specifically, when its other parent was not known in the art at the relevant time. As Dr. Schnable explains, 1PFHC43’s genome is derived from its parents. Ex. 2004 ¶ 115. Petitioner does not address how a person of ordinary skill in the art would have been able to produce the claimed seed, including its unique genotype, without having access to PH1VNA or its genomic and phenotypic information.” slip op. at 15
Claim construction§ 101 eligibility§ 103 obviousnessDiscretionary denialcites PhillipsPatents in suitUS 11,666,020 - Panasonic Automotive Systems Co., Ltd. v. Unm Rainforest InnovationsInstitution deniedPTAB · Aug 5, 2024 · IPR2024-00364 · APJ Kristen L Droesch · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood of proving claim 8 or substitute claims 44–47, 49, and 50 unpatentable on any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“We have authority to determine whether to institute review under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a). An inter partes review may not be instituted unless it is determined that “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons provided below, after considering the Petition and the Preliminary Response, we determine, based on the record before us, there is not a reasonable likelihood Petitioner would prevail in showing at least one of the challenged claims is unpatentable.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“B. Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art “in the field of the ’096 patent would have had a Bachelor’s degree in electrical engineering, computer engineering, or a related field, and around two years of experience in the design or development of wireless communication systems, or the equivalent.” Pet. 16 (citing Ex. 1002 ¶ 57). In turn, Patent Owner submits a slightly different description: that a person of ordinary skill in the art “in the technical field of the ’096 patent would have had at least a master’s degree in computer engineering or electrical engineering, or equivalent work experience, along with at least 1 year of experience related specifically to wireless communications, including knowledge of MIMO [(Multiple-Input Multiple-Output)] and OFDM.” Prelim. Resp. 22 (citing Ex. 2001 ¶ 18). For the purpose of determining whether to institute trial, we adopt Patent Owner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’096 Patent Specification and the asserted prior art but our conclusions would be the same under Petitioner’s definition.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Of note, the numerous claim terms construed in the Apple Litigation and referenced by the parties include the terms “data” and “non-data.” See Pet. 8 (citing Ex. 1005); Prelim. Resp. 23 (citing Ex. 1005). Both parties agree that “data” and “non-data” are to be given their plain and ordinary meanings. See Pet. 8 (citing Ex. 1005); Prelim. Resp. 23 (citing Ex. 1005). As demonstrated in the analysis below, for the purpose of determining whether to institute review, we need not construe any claim terms and phrases to resolve the controversy before us. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentable
“We agree with Patent Owner that the Joint Proposal’s legacy signal field (L-SIG) does not disclose data as recited in limitation 8[a]. Both parties agree that the term “data” should be construed according to its plain and ordinary meaning. See Pet. 16–18; Prelim. Resp. 22–23. The ’096 Patent utilizes the term “data” in accordance with its plain and ordinary meaning. See Ex. 1001 generally. We find that the Joint Proposal likewise utilizes the term “data” in accordance with its plain and ordinary meaning, to describe data fields that include the PHY sub-layer Service Data Unit, and shown in each of the legacy PLCP packet format, Mixed Mode PLCP packet format, and Green Field PLCP packet format that include the PHY sub-layer Service Data Unit. See Ex. 1008, 11:11–13, Fig. 1. Indeed, in addressing limitation 8[b], Petitioner identifies the Joint Proposal’s data field in the Mixed Mode PLCP format as disclosing “data configured in a second format compatible with a second communication system,” as recited in limitation 8[b]. See Pet. 26–27. Petitioner, however, does not direct us to where the Joint Proposal discloses or describes the legacy signal field (L- SIG) as “data” according to its plain and ordinary meaning. See Pet. 25–26. Petitioner’s citations to the Joint Proposal fail to provide sufficient support for Petitioner’s position that L-SIG discloses “data” in accordance with its plain and ordinary meaning. See Ex. 1008, 11:4–6, 11:18–23. Petitioner further does not provide sufficient explanation why the Joint Proposal’s L- SIG otherwise constitutes “data,” according to the plain and ordinary meaning. See Pet. 25–26. The testimony of Dr. Hansen, cited by Petitioner to support its arguments, is no more illuminating. Compare Pet. 25–26, with Ex. 1002 ¶ 177.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 8,265,096
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.