PTAB
Advanced fields
60 decisions · 476msnewest first
  • PTAB · May 21, 2025 · IPR2025-00193 · APJ Sheridan K Snedden · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, or 30 were unpatentable on any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the evidence and arguments presented in the Petition, we determine that Petitioner has not demonstrated a reasonable likelihood of success in proving that at least 1 claim of the ’030 patent is unpatentable.” slip op. at 2

    • BurdenNot shown unpatentable

      “What is missing from Petitioner’s stated motivation for modifying the array of Cantor is a reason why a POSA would seek to correlate the identification sequence with a location on the array at all. Prelim. Resp. 72. Indeed, the location of a bead on the substrate is not pertinent to the analysis disclosed in Cantor. Ex. 2002 ¶ 172; see also id. at ¶ 31 (Cantor “does not relate to the [spatial] analysis of tissue samples . . . .”). “[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, and 30 would have been obvious over Cantor.” slip op. at 20

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner does not argue that any claim term requires construction. Pet. 22–23. Likewise, Patent Owner takes the position that “no claim terms 2 Person of ordinary skill in the art. require explicit construction” for purposes of determining whether to institute inter partes review. Prelim. Resp. 19. Having considered the parties’ positions and evidence of record, we determine that no express construction of any claim term is necessary to determine whether to institute inter partes review. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable

      “What is missing from Petitioner’s stated motivation for modifying the array of Cantor is a reason why a POSA would seek to correlate the identification sequence with a location on the array at all. Prelim. Resp. 72. Indeed, the location of a bead on the substrate is not pertinent to the analysis disclosed in Cantor. Ex. 2002 ¶ 172; see also id. at ¶ 31 (Cantor “does not relate to the [spatial] analysis of tissue samples . . . .”). “[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 3, 6, 10, 11, 16, 18, 21, 24–26, and 30 would have been obvious over Cantor.” slip op. at 20

    Claim construction§ 102 anticipation§ 103 obviousness
    Patents in suitUS 11,761,030
  • PTAB · May 21, 2025 · IPR2025-00192 · APJ Sheridan K Snedden · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1, 5, 17, 20, 23, 28, or 29 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the evidence and arguments presented in the Petition, we determine that Petitioner has not demonstrated a reasonable likelihood of success in proving that at least 1 claim of the ’138 patent is unpatentable.” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentableNot shown unpatentable

      “[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Here, Cantor fails to teach or suggest capture probes distributed randomly on a substrate comprising a nucleic acid sequence that identifies a unique location on the substrate as required by the challenged claims, and Petitioner fails to adequately articulate why a person of ordinary skill in the art would have modified Cantor to make the recited capture probes. In view of the above, we find that, on this record, Petitioner has failed to establish that Cantor teaches or suggests each element of the challenged claims. Accordingly, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge that any of claims 1, 5, 17, 20, 23, 28, and 29 would have been obvious over Cantor. slip op. at 21

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedDecided for patent owner

      “3. Discussion Petitioner challenges whether certain elements of independent claims 1 and 17 are supported by the ’124 provisional and/or whether the ’138 patent’s priority chain is intact. Pet. 52–60. Having considered the parties’ positions and evidence of record, however, we agree with Patent Owner’s written description analysis, summarized above, and find (1) that the ’124 Provisional provides adequate written description support for each of the challenged claim elements; (2) that the ’138 patent’s priority chain is intact; and (3) that the ’138 patent is therefore entitled to the priority date of April 5, 2010. Consequently, Frisen is not prior art to the challenged claims.” slip op. at 28

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference not prior artDecided for patent owner

      “3. Discussion Petitioner challenges whether certain elements of independent claims 1 and 17 are supported by the ’124 provisional and/or whether the ’138 patent’s priority chain is intact. Pet. 52–60. Having considered the parties’ positions and evidence of record, however, we agree with Patent Owner’s written description analysis, summarized above, and find (1) that the ’124 Provisional provides adequate written description support for each of the challenged claim elements; (2) that the ’138 patent’s priority chain is intact; and (3) that the ’138 patent is therefore entitled to the priority date of April 5, 2010. Consequently, Frisen is not prior art to the challenged claims.” slip op. at 28

    Claim construction§ 102 anticipation§ 103 obviousness
    Patents in suitUS 11,549,138
  • PTAB · May 20, 2025 · IPR2025-00125 · APJ Devon Zastrow Newman · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that any challenged claim was unpatentable under the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2019). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that Petitioner has not established a reasonable likelihood of prevailing on its assertion that at least one challenged claim is unpatentable based on the grounds advanced here. Accordingly, we deny institution of inter partes review of claims 1–20 of the ’967 patent.” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “VSI Int’l Inc., 174 F.3d 1308, 1324 (Fed. Cir. 1999) (citing Graham v. John Deere Co., 383 U.S. 1, 17–18 (1966); Ryko Mfg. Co. v. Nu-Star, Inc., 950 F.2d 714, 718 (Fed. Cir. 1991)). Petitioner adopts the following definition of a person of ordinarily skill in the art (hereafter, sometimes “POSITA”) of the ’967 patent proposed by Patent Owner in the Avery Dennison litigation: [A]t least a bachelor’s degree in electrical engineering, computer science, or computer engineering, or a related discipline, and at least five years of experience which would consist of, A, designing, developing, evaluating and/or using RFID or other AIDC [automatic identification and data capture] technologies in inventory management, unique object identification, and/or security; or B, studying and conducting research related to RFID technologies and using RFID and other AIDC technologies in inventory management, unique object identification, and/or security. Pet. 6 (citing Ex. 1030, 707:3–13). Patent Owner does not offer a definition of an ordinarily skilled artisan of the ’967 patent at this time. See generally Prelim. Resp. Based on the information presented, we find that the asserted prior art itself is sufficient to demonstrate the level of skill in the art at the time of the invention. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself can reflect the appropriate level of ordinary skill in the art). To the extent a more precise definition is required, we apply Petitioner’s unopposed proposed definition for purposes of determining whether to institute review because it is consistent with the disclosures of the asserted prior art references and the problems addressed in the ’967 patent.” slip op. at 17

    • Prior constructionPrior construction adoptedDecided for patent owner

      “Petitioner proposes the following claim constructions: “an allocated block of serial numbers” as “a pre-authorized range of binary serial numbers” and “uniquely corresponding” as the “term’s plain and ordinary meaning, consistent with the articulation of the plain and ordinary meaning” in the Avery Dennison litigation. Pet. 8–12. As to the remaining claim terms, Petitioner applies the district court’s constructions in the Avery Dennison litigation. Id. at 12 (citing Ex. 1028). Patent Owner applies the following constructions that were entered during in the Avery Dennison litigation: “object class information space” as “data field within the memory of the RFID integrated circuit chip for information identifying the class of an object, such as a company prefix, item reference code, partition value, and/or filter value,” “unique serial number space” as “data field within the memory of the RFID integrated circuit for information identifying a unique serial number,” “being assigned a limited number of most significant bits” as “includes a limited, predefined sequence at the leading end,” “remaining bits of lesser significance” as “the remaining lower order bits at the trailing end,” “is encoded with one serial number instance” as “has stored within it one serial number instance,” “an allocated block of serial numbers” as “a pre-authorized range of serial numbers,” and “uniquely corresponding” as its plain and ordinary meaning. Prelim. Resp. 32. For purposes of resolving whether to institute trial, we adopt and apply the interpretations stated in the district court’s claim construction order and applied by the Federal Circuit on appeal, Ex. 1028.11 See 55 F.4th 900, 908–909, 912–913 (Fed. Cir. 2022) (citing the district court’s claim construction order).” slip op. at 18

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “IBM200 and Kuhno would have made it obvious for a POSITA to commission RFID tags with unique serial numbers partitioned into MSBs and bits of lesser significance. See Pet. 34–39; Ex. 1005 ¶¶ 167–176. However, on this record, Petitioner has not sufficiently shown that the POSITA, having read IBM200 and Kuhno, would have been led to create a serial number space in which the limited number of “most significant bits” uniquely corresponds to those bits assigned to an allocated block of serial numbers, as recited in limitation [f].” slip op. at 25

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 9,798,967
  • PTAB · May 1, 2025 · IPR2025-00136 · APJ Jeffrey N Fredman · IPR · Institution

    Institution of inter partes review was denied for claims 1–10 because Petitioner did not establish a reasonable likelihood of prevailing on any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Accordingly, we find that on the current record Petitioner has not shown that it has a reasonable likelihood that it would prevail on these obviousness grounds. XII. DISCRETIONARY DENIAL – 35 U.S.C. § 325(d) In view of our determination that the Petitioner does not meet the threshold for instituting review on the merits, we need not address the parties’ dispute about whether the Board should exercise its discretion to deny institution under 35 U.S.C. § 325(d). Pet. 74–75; Prelim. Resp. 38–54; Pet. Reply 1–5; PO Sur-Reply 1–5. XIII. CONCLUSION After reviewing the information presented in the Petition and the Preliminary Response, we determine that, based on the evidence of record, Petitioner has not established a reasonable likelihood that claims 1–10 of the ’841 patent are unpatentable. XIV. ORDER Accordingly, it is ORDERED that, pursuant to 35 U.S.C. § 314(a), institution of an inter partes review of all challenged claims on all grounds presented in the Petition is denied.” slip op. at 35

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element) › Inherent disclosureNot shown unpatentableInherency not foundNot shown unpatentable

      “However, neither Petitioner nor Dr. Jansky provide specific data on the record before us showing the actual measured homozygosity of either of the inbred lines, US-W 5309 and US-W 5315. And Phumichai experimentally demonstrates that Dr. Jansky’s assumption that theoretical heterozygosity reduction of 50% per generation is not necessarily accurate, stating the “observed average percentage of reduction of heterozygosity per generation (38.4% or 38.5%) was lower than the theoretically expected value of 50%.” Ex. 1005, 982. Indeed, Phumichai disclosed that the “SOPH [Section-based observed percentage of heterozygosity] decreased steadily from the original 100% in 99H2–1 (S0) to the family means of 62.4% in 3H2 (S1), 37.9% in 3H3 (S2).” Id. at 981. That is, Phumichai experimentally shows that in an S2 generation of a potato line, the heterozygosity was 37.9%, resulting in homozygosity of about 62.1%, below the 75% theoretically expected and the 75% required by claim 1 of the ’841 patent. Therefore, the evidence of record does not show that the S2 generation of potato lines in Jong necessarily satisfies the homozygosity recitation in claim 1 of the ’841 patent, and so cannot establish on the record before us that Jong inherently teaches this limitation.” slip op. at 15

    • Obviousness (§103) › Objective indicia / secondary considerationsObjective indicia outweighedNot shown unpatentableNot shown unpatentable

      “Owner is telling. Petitioner does not refute Patent Owner’s evidence of objective indicia. On the current record, the objective indicia evidence is compelling. As to long felt need, Patent Owner cited evidence on record before the Examiner that showed a persistent need recognized by ordinarily skilled artisans. In re Gershon, 372 F.2d 535, 538 (CCPA 1967). For example, Dr. Huang states “This research is the breakthrough we have been waiting for since nearly a century . . . This is crucial for the potato breeding worldwide.” Ex. 2009, 687. There is no evidence that this long-felt need was satisfied by another before Appellant’s invention. See Newell Companies, Inc. v. Kenney Mfg. Co., 864 F.2d 757, 768 (Fed. Cir. 1988) (“[O]nce another supplied the key element, there was no long-felt need or, indeed, a problem to be solved . . . .”). Lastly, Dr. Lindhout explains that this invention satisfies the long-felt need, stating “I have discovered, and disclosed in the present application for patent, how a fertile homozygote in” slip op. at 33

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached

      “XII. DISCRETIONARY DENIAL – 35 U.S.C. § 325(d) In view of our determination that the Petitioner does not meet the threshold for instituting review on the merits, we need not address the parties’ dispute about whether the Board should exercise its discretion to deny institution under 35 U.S.C. § 325(d). Pet. 74–75; Prelim. Resp. 38–54; Pet. Reply 1–5; PO Sur-Reply 1–5.” slip op. at 35

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 11,140,841
  • PTAB · Dec 4, 2023 · IPR2023-00838 · APJ Patrick M Boucher · IPR · Institution

    The Board denied institution because Petitioner did not show that Vrazel’s encoder or encoder and pre-distorter provided the claimed m-ary modulator for claims 1–3, 5, 6, 8, 10–17, 22, and 23.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We accordingly determine that Petitioner does not sufficiently show that Vrazel meets the requirements of the recited “m-ary modulator” in any of the challenged independent claims. We therefore conclude that Petitioner does not demonstrate a reasonable likelihood of prevailing on its challenge of independent claims 1, 22, or 23 as unpatentable under 35 U.S.C. § 103(a) over Pang and Vrazel.” slip op. at 20

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “Because it is dispositive, we focus our analysis on each independent claim’s recitation of “an m-ary modulator for increasing the number of bits per symbol in the first electrical data signal to produce a first m-ary modulation signal.” Ex. 1001, 15:6–8 (claim 1), 17:13–15 (claim 22), 18:9– 11 (claim 23). In addressing this limitation, Petitioner relies solely on Vrazel, which Petitioner contends “discloses this limitation in at least two ways.” Pet. 28 (addressing claim 1), 64 (addressing claim 22 by referring to analysis for claim 1), 66 (addressing claim 23 by referring to analysis for claim 1).” slip op. at 16

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b) (2019); see Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). “Petitioner proposes that each claim term in the Challenged Claims be given its plain and ordinary meaning in this proceeding, and that no specific construction of any claim term is required.” Pet. 6. Patent Owner similarly does not propose any explicit construction of any claim term in its Preliminary Response. On the record before us, we do not find it necessary to construe any term for this Decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,771,181
  • PTAB · Dec 4, 2023 · IPR2023-00835 · APJ Patrick M Boucher · IPR · Institution

    The Board denied institution because the Petition did not show a reasonable likelihood that claims 1–3, 5–7, 9, and 11–20 were unpatentable over Pang and Vrazel.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We accordingly determine that Petitioner does not sufficiently show that the Vrazel meets the requirements of the recited “m-ary modulator.” We therefore conclude that Petitioner does not demonstrate a reasonable likelihood of prevailing on its challenge of independent claim 1 as unpatentable under 35 U.S.C. § 103(a) over Pang and Vrazel. F. Dependent Claims Each of claims 2, 3, 5–7, 9, and 11–20 depends directly or indirectly from independent claim 1, and Petitioner challenges those claims as unpatentable under 35 U.S.C. § 103(a) over Pang and Vrazel. Ex. 1001, 15:29–16:33; Pet. 53–67. The deficiency in Petitioner’s analysis of independent claim 1 also applies to each of the dependent claims. We accordingly conclude that Petitioner does not demonstrate a reasonable likelihood of prevailing on its challenge of dependent claims 2, 3, 5–7, 9, and 11–20.” slip op. at 19

    • Skill levelSkill level petitioner adoptedOther

      “Petitioner proposes that a person of ordinary skill in the art “would have had at least a Bachelor’s degree in Computer Science, Computer Engineering, Electrical Engineering or a similar degree and at least two years of professional experience with optical communications, networking, and signal processing.” Pet. 7. Petitioner adds that “[m]ore experience can supplement less education and vice versa,” and supports its proposal with testimony by Dr. Min. Id.; Ex. 1003 ¶ 41. Patent Owner does not specifically address the level of ordinary skill in its Preliminary Response. Because we find Petitioner’s proposal reasonable, consistent with the level of skill reflected by the prior art, and supported by Dr. Min’s testimony, we adopt it for purposes of this Decision. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b) (2019); see Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). “Petitioner proposes that each claim term in the Challenged Claims be given its plain and ordinary meaning in this proceeding, and that no specific construction of any claim term is required.” Pet. 6–7. Patent Owner similarly does not propose any explicit construction of any claim term in its Preliminary Response. On the record before us, we do not find it necessary to construe any term for this Decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “We accordingly determine that Petitioner does not sufficiently show that the Vrazel meets the requirements of the recited “m-ary modulator.” We therefore conclude that Petitioner does not demonstrate a reasonable likelihood of prevailing on its challenge of independent claim 1 as unpatentable under 35 U.S.C. § 103(a) over Pang and Vrazel. F. Dependent Claims Each of claims 2, 3, 5–7, 9, and 11–20 depends directly or indirectly from independent claim 1, and Petitioner challenges those claims as unpatentable under 35 U.S.C. § 103(a) over Pang and Vrazel. Ex. 1001, 15:29–16:33; Pet. 53–67. The deficiency in Petitioner’s analysis of independent claim 1 also applies to each of the dependent claims. We accordingly conclude that Petitioner does not demonstrate a reasonable likelihood of prevailing on its challenge of dependent claims 2, 3, 5–7, 9, and 11–20.” slip op. at 19

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,263,723
  • PTAB · Nov 14, 2023 · IPR2023-01030 · APJ Sheridan K Snedden · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–29 would have been obvious over the asserted combinations.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). The Supreme Court has held that a decision to institute under 35 U.S.C. § 314 may not institute on fewer than all claims challenged in the petition. SAS Inst., Inc. v. Iancu, 138 S. Ct. 1348, 1359–60 (2018). Upon consideration of the Petition and the Preliminary Response, and for the reasons explained below, we determine that the information presented does not show a reasonable likelihood that Petitioner would prevail with respect to any claim. See 35 U.S.C. § 314(a). Accordingly, we deny the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Pet. 15–16. Patent Owner does not dispute Petitioner’s proposal about the POSA’s qualifications. See generally, Prelim. Resp. For this Decision, we adopt and apply Petitioner’s proposal for the level of skill in the art, which does not appear to be inconsistent with the level of skill reflected in the asserted prior art.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “Petitioner proposes constructions of four limitations: “insertional enzyme complex,” “nucleic acid insert element,” “adapter sequence,” “barcode sequence,” and “tagged fragments.” Pet. 20–23. Patent Owner, for its part, states that “[n]o terms require construction for considering institution.” Prelim. Resp. 15. We determine that none of the four limitations identified by Petitioner requires an express construction for purposes of this Decision. It bears” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed board ownDecided for patent owner

      “express construction of the term “chromatin.” The ’207 patent itself provides a definition, stating: The term “chromatin,” as used herein, refers to a complex of molecules including proteins and polynucleotides (e.g. DNA, RNA), as found in a nucleus of a eukaryotic cell. Chromatin is composed in part of histone proteins that form nucleosomes, genomic DNA, and other DNA binding proteins (e.g., transcription factors) that are generally bound to the genomic DNA. Ex. 1001, 12:58–64. This is the meaning that we apply in this Decision.” slip op. at 8

    Claim construction§ 103 obviousnesscites Graham
    Patents in suitUS 10,619,207
  • PTAB · Oct 19, 2023 · IPR2023-00878 · APJ Michael J Fitzpatrick · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that Grunenwald anticipates claim 1 or that the asserted combinations cure its failure to disclose contacting chromatin.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Institution of an inter partes review requires that “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Determining whether to institute has been delegated to the Board. See 37 C.F.R. § 42.4(a) (“The Board institutes the trial on behalf of the Director.”). Upon consideration of the Petition and the Preliminary Response, and for the reasons explained below, we determine that the information presented does not show a reasonable likelihood that Petitioner would prevail with respect to any claim. See 35 U.S.C. § 314(a). Accordingly, we deny the Petition.” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “Petitioner proposes constructions of four limitations: “insertional enzyme complex,” “nucleic acid insert element,” “adapter sequence,” and “barcode sequence.” Pet. 21–25. Patent Owner, for its part, states that “[n]o terms require construction for considering institution.” Prelim. Resp. 16. We determine that none of the four limitations identified by Petitioner requires an express construction for purposes of this Decision. It bears mentioning, however, that the ’995 patent states that “[t]he insertional enzyme can be a transposase.” Ex. 1001, 3:41–42. There is no dispute that Grunenwald discloses the use of a transposase and, thus, an insertional enzyme complex. See Pet. 27 (citing Ex. 1003 ¶¶98, 161); Prelim. Resp. 34 (“Grunenwald defines ‘transposase’ to include any transposase, thus including those that comprise antibodies that are specific to a protein that is part of said chromatin.” (citing Ex. 1003 ¶93)).” slip op. at 6

    • Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed board ownDecided for patent owner

      “express construction of the term “chromatin.” The ’995 patent itself provides a definition, stating: The term “chromatin,” as used herein, refers to a complex of molecules including proteins and polynucleotides (e.g. DNA, RNA), as found in a nucleus of a eukaryotic cell. Chromatin is composed in part of histone proteins that form nucleosomes, genomic DNA, and other DNA binding proteins (e.g., transcription factors) that are generally bound to the genomic DNA. Ex. 1001, 12:54–60. This is the meaning that we apply in this Decision.” slip op. at 7

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “B. Ground 1 Petitioner asserts that Grunenwald anticipates independent claim 1, as well some of the dependent claims. Pet. 25. “Anticipation requires that all of the claim elements and their limitations are shown in a single prior art reference.” In re Skvorecz, 580 F.3d 1262, 1266 (Fed. Cir. 2009). Patent Owner argues that Grunenwald fails to anticipate claim 1, which failure undermines the entire Petition. Prelim. Resp. 16–17 (“Petitioner has failed to show that Grunenwald discloses each and every limitation as arranged in the claims, including, e.g., ‘contacting chromatin of a genome region,’ and thus cannot meet its burden as to any claim in Ground 1.” (quoting claim 1)), 38 (“Petitioner cannot meet its burden as to Grounds 2–8 for the same reasons Petitioner cannot meet its burden for Ground 1.”). Accordingly, we turn first to claim 1.” slip op. at 7

    Claim construction§ 102 anticipation
    Patents in suitUS 10,150,995
  • PTAB · Oct 13, 2023 · IPR2023-00662 · APJ Aaron W Moore · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–20 were unpatentable over the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We may institute an inter partes review if “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons provided below, we determine that Petitioner has not demonstrated a reasonable likelihood that it will prevail in showing the unpatentability of at least one challenged claim. Accordingly, we do not institute inter partes review. B.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached

      “4 Petitioner also cites page 10 of Tahan, but we find no mention of either SVP or SVM there, and Petitioner does not explain where it might be disclosed. 5 Because we deny the Petition on the merits, we do not reach Patent Owner’s request that we exercise our discretion to deny the Petition based on the state of the related litigation. See Prelim. Resp. 3–18.” slip op. at 19

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Level of Ordinary Skill in the Art Petitioner contends that one of ordinary skill in the art at the time of the alleged invention “would have had a bachelor’s degree in computer science, or a related field, or an equivalent technical degree or equivalent work experience, and an additional one to two years of education or experience in the field of computer security topics such as malware/exploit detection and/or machine learning” and that “[m]ore education can supplement practical experience and vice versa” Pet. 9 (citing Ex. 1002 ¶ 94). Patent Owner “does not dispute Petitioner’s articulation of the level of ordinary skill.” Prelim. Resp. 29. 1 Gil Tahan, et al., Mal-ID: Automatic Malware Detection Using Common Segment Analysis and Meta-Features, Journal of Machine Learning Research 13, 949–979 (April 13, 2012) (Exhibit 1003). 2 Eitan Menahem, et al., Improving Malware Detection by Applying Multi- Inducer Ensemble, Computational Statistics & Data Analysis 53, 1483–1494 (2009) (Exhibit 1004). 3 U.S. Patent App. Pub. No. 2009/0254992 A1 (Exhibit 1005). For purposes of this decision, we adopt Petitioner’s proposal, which we find generally consistent with the disclosures of the ’844 patent. B.” slip op. at 11

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner asserts that “all claim terms should be given their plain and ordinary meanings.” Pet. 9. For its part, Patent Owner “agree[s] that no claim terms need be construed for this petition,” and that “all claim terms should carry their plain and ordinary meaning in light of the intrinsic record.” Prelim. Resp. 27. We find that no express claim construction is necessary to resolve the institution question. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (explaining that construction is needed only for terms that are in dispute, and only as necessary to resolve the controversy). C.” slip op. at 12

    Claim construction§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 10,599,844
  • PTAB · Sep 18, 2023 · IPR2023-00594 · APJ Patrick M Boucher · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable under the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We agree with Patent Owner that “[i]f anything, Petitioner’s cited passages appear to suggest to the contrary that these ostensible default duration parameters would instead be features of the application programs used for managing Shimizu’s alleged show structures.” Id. at 45–46; see also id. at 59 (“[T]he passages Petitioner relies on teach only that the ‘predetermined time’ would be associated with the application program used to display the nodes.”). Several considerations support this understanding of Shimizu, including both Shimizu’s disclosure and certain testimony of Petitioner’s expert, Mr. Schmandt. First, the passage that Petitioner cites from Shimizu’s Summary of the Invention refers to “an application program” that causes switching of nodes displayed “at predetermined intervals.” Ex. 1003, 5:11–14. The other passage that Petitioner cites similarly refers to “an application program” that may be displayed by reading node information within “a predetermined time.” Id. at 3:12–16. Although not cited by Petitioner, Shimizu also states: As described, the hypertext apparatus of the invention offers a user interface capable of putting into a desired order the links between the nodes to be managed and of manipulating the established link order. This makes it easy to create illustratively an application program allowing the display of node contents to be switched in a desired order and at predetermined intervals on the hypertext apparatus. Id. at 9:60–66. All of these passages are more consistent with Patent Owner’s position that the predetermined time or intervals are included in the application program rather than in the hypertext nodes. Petitioner does not provide persuasive argument or evidence to show that Shimizu should instead be read as describing hypertext nodes that include predetermined times or intervals. Second, we have also considered Mr. Schmandt’s testimony, and he provides no meaningful additional information to support reading Shimizu as Petitioner advocates. See Ex. 1002 ¶¶ 118, 120–127. In testimony not cited by Petitioner, Mr. Schmandt admits that “Shimizu does not appear to disclose further details about how duration information is specified or stored within its system, or whether such intervals between nodes can be changed.” Id. ¶ 119. This testimony undermines Petitioner’s position that Shimizu’s hypertext nodes include duration information. Mr. Schmandt elaborates in testimony that Petitioner cites, but does not explain: In a real-world implementation of the proposed combination, for example, the display time could have been specified within the node information structure 9 of Shimizu. I note that node information structure 9 in Shimizu also contains display procedure slot 62 (Fig. 6), which points to “a procedure program function used when the node in question is to be displayed on the screen.” (Shimizu, 6:52–55.) Shimizu thus contemplates that node information structure 9 may contain information about how the node will be displayed to the user, and as such, it would have been obvious that durational information could also have been included as part of node information structure 9. This durational amount could have been a default display time specified by the user, or a display time specific to the node in question, as explained above. * * * Shimizu itself clearly contemplates the ability to customize the display of nodes, and as explained above, node information structure 9 (Fig. 6) includes display procedure slot 62 which points to a program function or procedure used to display the node content, thus making clear that node information structure 9 can hold information about how the node will be displayed. Id. ¶¶ 123, 127. Mr. Schmandt’s testimony that Shimizu would need to be modified for its hypertext nodes to include duration information is strong evidence that Shimizu does not disclose hypertext nodes that include duration information. This testimony (from ¶ 123) also suggests that Shimizu’s predetermined intervals and times could be included in the procedure program function to which display procedure slot 62 points, rather than in the hypertext node, thereby providing additional evidence Shimizu’s predetermined intervals and times are included in structure other than hypertext nodes. See also Ex. 1003, 6:52–55.” slip op. at 27

    • BurdenInstitution denied

      “We agree with Patent Owner that “[i]f anything, Petitioner’s cited passages appear to suggest to the contrary that these ostensible default duration parameters would instead be features of the application programs used for managing Shimizu’s alleged show structures.” Id. at 45–46; see also id. at 59 (“[T]he passages Petitioner relies on teach only that the ‘predetermined time’ would be associated with the application program used to display the nodes.”). Several considerations support this understanding of Shimizu, including both Shimizu’s disclosure and certain testimony of Petitioner’s expert, Mr. Schmandt. First, the passage that Petitioner cites from Shimizu’s Summary of the Invention refers to “an application program” that causes switching of nodes displayed “at predetermined intervals.” Ex. 1003, 5:11–14. The other passage that Petitioner cites similarly refers to “an application program” that may be displayed by reading node information within “a predetermined time.” Id. at 3:12–16. Although not cited by Petitioner, Shimizu also states: As described, the hypertext apparatus of the invention offers a user interface capable of putting into a desired order the links between the nodes to be managed and of manipulating the established link order. This makes it easy to create illustratively an application program allowing the display of node contents to be switched in a desired order and at predetermined intervals on the hypertext apparatus. Id. at 9:60–66. All of these passages are more consistent with Patent Owner’s position that the predetermined time or intervals are included in the application program rather than in the hypertext nodes. Petitioner does not provide persuasive argument or evidence to show that Shimizu should instead be read as describing hypertext nodes that include predetermined times or intervals. Second, we have also considered Mr. Schmandt’s testimony, and he provides no meaningful additional information to support reading Shimizu as Petitioner advocates. See Ex. 1002 ¶¶ 118, 120–127. In testimony not cited by Petitioner, Mr. Schmandt admits that “Shimizu does not appear to disclose further details about how duration information is specified or stored within its system, or whether such intervals between nodes can be changed.” Id. ¶ 119. This testimony undermines Petitioner’s position that Shimizu’s hypertext nodes include duration information. Mr. Schmandt elaborates in testimony that Petitioner cites, but does not explain: In a real-world implementation of the proposed combination, for example, the display time could have been specified within the node information structure 9 of Shimizu. I note that node information structure 9 in Shimizu also contains display procedure slot 62 (Fig. 6), which points to “a procedure program function used when the node in question is to be displayed on the screen.” (Shimizu, 6:52–55.) Shimizu thus contemplates that node information structure 9 may contain information about how the node will be displayed to the user, and as such, it would have been obvious that durational information could also have been included as part of node information structure 9. This durational amount could have been a default display time specified by the user, or a display time specific to the node in question, as explained above. * * * Shimizu itself clearly contemplates the ability to customize the display of nodes, and as explained above, node information structure 9 (Fig. 6) includes display procedure slot 62 which points to a program function or procedure used to display the node content, thus making clear that node information structure 9 can hold information about how the node will be displayed. Id. ¶¶ 123, 127. Mr. Schmandt’s testimony that Shimizu would need to be modified for its hypertext nodes to include duration information is strong evidence that Shimizu does not disclose hypertext nodes that include duration information. This testimony (from ¶ 123) also suggests that Shimizu’s predetermined intervals and times could be included in the procedure program function to which display procedure slot 62 points, rather than in the hypertext node, thereby providing additional evidence Shimizu’s predetermined intervals and times are included in structure other than hypertext nodes. See also Ex. 1003, 6:52–55.” slip op. at 27

    • Prior constructionPrior construction adoptedDecided for patent owner

      “used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b) (2019); see Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). Certain terms recited in the challenged claims were construed during prior litigation of the ’451 patent, i.e., an ancestor of the challenged ’819 patent that Petitioner characterizes as “shar[ing] a near-verbatim written description with the ’819 patent”). Ex. 1023 (claim construction order in cases involving Microsoft and Apple); Ex. 2003, 5 (clarification of certain claim constructions on summary judgment); Pet. 8–9. Patent Owner advocates that we adopt such prior constructions in this proceeding. Prelim. Resp. 6. Although “Petitioner does not believe express claim construction is necessary at this time,” Petitioner takes the position that its asserted prior art “renders the challenged claims obvious under the district court’s constructions.” Pet. 10. And we agree with Patent Owner that the Petition “presents extensive arguments” that apply the district court’s constructions. See Prelim. Resp. 6 (citing Pet. 9–10, 12–20, 33). We have reviewed the court’s claim-construction order, and adopt its construction of the following terms for purposes of this Decision. First, we construe “node,” which is recited in multiple claims, as “an identifier of a resource that includes an address to the resource and the duration for which the resource’s content is to be presented by default.” See Ex. 1023, 16–17; Prelim. Resp. 8–10. Second, we construe “show structure of nodes,” which is recited in each of challenged independent claims 1, 16, 23, and 26, as well as in certain dependent claims, as “a structure that is arranged for the display of content by specifying one or more paths through a plurality of nodes. The show structure of nodes specifies the duration of any display,” but there is no durational requirement separate from the construction of “node.” See Ex. 1023, 2–13; Ex. 2003, 5; Prelim. Resp. 7–8. Third, we construe “interactively variable duration information,” which is recited in each of challenged independent claims 1, 23, and 26, as “a parameter specifying how long a content is to be displayed by default before a subsequent content is displayed, where the viewer of the content can change the parameter.” Ex. 1023, 22–23; Prelim. Resp. 10–12.” slip op. at 14

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner proposes that a person of ordinary skill in the art “would have possessed a bachelor’s in electrical engineering, computer science, or similar field, with at least two years of experience developing and implementing network-based computer systems, such as systems for storing and retrieving information over the Internet or communicating using the Web.” Pet. 7. Petitioner adds that “[s]uch a person could also have qualified with more formal education and less technical experience, or vice versa.” Id. (citing Ex. 1002 ¶¶ 13–18). Patent Owner proposes that a person of ordinary skill in the art “would have the equivalent of a four-year degree from an accredited institution (usually denoted as a B.S. degree) in computer science, computer engineering or the equivalent, and experience with, or exposure to, topics in computer networking, multimedia, and web systems. A person of ordinary skill in the art would also have approximately 3-5 years of professional experience with these topics.” Prelim. Resp. 5–6. In addition, Patent Owner say that “[a]dditional graduate education could substitute for professional experience, while significant experience in the field might substitute for formal education.” Id. Petitioner supports its proposal with testimony by Dr. Schmandt. See Ex. 1002 ¶ 16. Although the proposals differ in certain respects, they do not differ in ways that affect our decision to deny institution of the proceeding. See id. (Dr. Schmandt testifying that “Patent Owner’s proposed articulation is not meaningfully different” and that his “analysis, opinions and conclusions . . . would not change if Patent Owner’s articulation were applied”). Both proposals include baccalaureate degrees and experience in generally related fields, with both parties indicating that additional education or experience could compensate for some lack in the other. For purposes of this Decision, we adopt Petitioner’s proposal, which we find consistent with the level of skill reflected by the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 13

    Claim constructionDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,606,819
Page 1 of 6
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.