  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached

      “IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,089,946
  • PTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13

    • BurdenNot shown unpatentable

      “We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 9,814,071
  • PTAB · Mar 17, 2025 · IPR2025-00008 · APJ Donald E Daybell · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–28 were unpatentable over Tagg or Kottilingal and Politis.

    RulingsInstitution decision
    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner

      “There is, however, a consistent thread that flows through the relevant disclosures of the specification; namely, that the “state involving the SIP sequence” is maintained throughout a dialog. Ex. 1001, 5:1–38 (step 210); see also id. (step 160). Using the method of Figure 4, including steps 160 and 210 and maintaining the SIP signaling state, is how the ’554 Patent discloses that calls are not broken or dropped. See, e.g., id. at 7:10–25. Maintaining the “state” of the SIP signaling sequence includes (but is not limited to) the teachings that a “SIP signaling sequence number” is maintained, as well as the details of how that number is maintained, as set forth in the specification. We find that the state of the SIP signaling sequence as that term is used in the specification refers to the rules (or paradigm) used to identify a collection of SIP signals as a “SIP signaling sequence,” and in particular the rules used to identify the next SIP packet received as belonging to a sequence of packets previously received. One key to the disclosed invention discussed in the specification is the concept that the invention prevents a call 3:45–4:9. The specification contends that the invention accomplishes this goal by configuring the packets involved in a VoIP call such that the receiving device (e.g., a SIP server) is able to recognize those packets as belonging to the same call, even though the packets are received over different paths. Id. at 7:35–50; 7:60–8:3. The particular way that the receiving devices are able to recognize that the packets are part of the same call is, per the claims, because the SIP signaling sequence is maintained after a network switch. Id. at 8:27–29. Thus, where a sequence of SIP signals uses numbers such as cseq values, there is a rule for identifying what the next signal in the sequence is. Ex. 1001, 5:1–38. A receiving device that knows the rule can identify an incoming packet as the next packet in the same signaling sequence as previously received packets, by applying the rule. Id. at 7:35–50. The specification provides one example rule, that the next SIP signal bears a monotonically-increasing cseq number. Id. at 5:1–38. But there could be other such rules as well. For example, the value could be monotonically decreased, or the value could be determined using some other formula.8 The claims also do not require that the sequence of SIP signals use “numbers” as sequence identifiers.9 Other labeling paradigms could be possible as well, 8 Patent Owner’s litigation claim construction improperly imports implementation details from the preferred embodiment, such as “cseq numbers” and the limitations that these numbers “monotonically increase” for new transmissions, or be “preserved” for re-transmissions. While such embodiments would be one way of maintaining a SIP signaling sequence, the specification does not clearly limit the invention to only these embodiments. 9 Petitioner’s litigation claim construction improperly imports the limitation from the preferred embodiment that the SIP signaling sequence must be” slip op. at 14

    • Skill levelSkill level board ownDecided for patent owner

      “as of the time of the invention of the ’554 Patent “would have been familiar with designing rules for implementing policies for service plans for use of an access network and provisioning those rules to network elements for policy enforcement” and would have gained this knowledge through a mixture of training and work experience, such as by having a Bachelor’s degree in electrical engineering or computer science and two years of experience; or by obtaining a Master’s degree in electrical engineering or computer science, but having only one year of experience; or by having no formal education but experience in network service plan provisioning systems of at least four years. Pet. 10. 4 The Leahy-Smith America Invents Act (“AIA”), Pub. L. No. 112–29, 125 Stat. 284, 287–88 (2011), amended 35 U.S.C. § 103. Because the ’554 Patent was filed before the effective date of the relevant amendment, the pre- AIA version of §103 applies. that a POSITA must specifically have “been familiar with designing rules for implementing policies for service plans for use of an access network and provisioning those rules to network elements for policy enforcement.” Prelim. Resp. 17–18. At this juncture, we adopt the agreed-upon portion of Petitioner’s definition, without the specific requirement relating to designing rules. This definition appears to be consistent with what is reflected by the content of the applied prior art references. Cf. Okajima v. Bourdeau, 261 F.3d 1350, 1354–55 (Fed. Cir. 2001) (recognizing that the applied prior art may reflect an appropriate level of skill). Our analysis would be the same under either definition.” slip op. at 8

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “determine whether to institute review. Upon consideration of the arguments and evidence before us, we conclude that Petitioner has not shown a reasonable likelihood of success in establishing that any claim of the ’554 Patent is unpatentable, and thus we decline to institute review. The Petition is denied, and inter partes review is not instituted.” slip op. at 2

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “We disagree with Petitioner’s view of Tagg. At best, the cited portions of Tagg disclose that SIP is used by endpoint 1512 to communicate with SIP server 1500, and by the SIP server to communicate with SIP proxy 1504. Figure 15 discloses that SIP is used for both of the paths from endpoint 1520 to SIP server 1500, via the WWAN or the WLAN. Figure 15 further discloses that SIP is used for the path from SIP server 1500 to SIP proxy 1504. But Figure 15 and the accompanying text are silent about any “sequences” of SIP signals at all, much less whether any such “sequences” are maintained, as required by the language of limitation 1.6. Ex. 1005 ¶¶ 324–346, Fig. 15. Instead, Tagg’s specification simply discloses that SIP is used to perform call management functions. Id. ¶¶ 245–247. Tagg’s cases 1 and 6, relied on by Petitioner, teach that Tagg’s server can ensure that the end user appears to the rest of the world (i.e. the devices upstream of the SIP server) as if no network change is being made. Ex. 1005 ¶ 320. Tagg further teaches that either “make before break” or “make and break” schemes may be used. Id. But these cases do not explain how any SIP signaling sequences are used, much less how or even that any SIP signaling sequence is maintained when a network switches. At most, Tagg teaches that each path will have an IP (Internet Protocol) address, which may be the same or different for each path. Id. ¶ 288. But IP addresses are part of the IP disclosing or suggesting that IP addressing schemes are maintained or otherwise accounted for in a network switch, that would not be sufficient to disclose or suggest that SIP signal sequences are maintained. Furthermore, under our construction of limitation 1.6, it must be shown that the same rules or paradigm used to identify that an incoming SIP packet is the next SIP packet in a sequence, regardless of whether that packet is transmitted on the first network path or the one of a plurality of alternative network paths. The Petition is silent on this point. The closest Petitioner comes is the assertion that Figure 15 depicts preservation of “the same SIP signaling sequence,” with the Petitioner’s explanation being that Tagg allows simultaneous connections across a WWAN and a WLAN, and that “POSITAs would have understood that Tagg’s SIP protocol uniformity in directionality teaches that a ‘SIP signaling sequence . . . is maintained.’” Pet. 39–40.” slip op. at 22

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,009,554
  • PTAB · Feb 11, 2025 · IPR2024-01249 · APJ Charles J Boudreau · IPR · Institution

    The Board denied institution because neither the Hottinen–Lilleberg nor Zimmerman–Lilleberg combination showed the claimed parameter tracking unit or an equivalent for claims 1, 3–5, and 7–9.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2024). We may not institute an inter partes review “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon consideration of the arguments and evidence presented, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to either ground asserted in the Petition. We therefore deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art “at the time of the ’505 patent had at least a bachelor’s in EE/CE/CS, physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation,” where “[m]ore education can supplement practical experience and vice versa.” Pet. 6 (citing Ex. 1003 ¶¶ 51–55). Patent Owner does not comment on Petitioner’s formulation or offer any competing formulation in its Preliminary Response. See generally Prelim. Resp. We find Petitioner’s proposal to be consistent with the evidence of record, including the asserted prior art and the ’505 patent, and accordingly, we adopt Petitioner’s proposed definition of the level of ordinary skill in the art for purposes of this Decision.” slip op. at 16

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “for use in conjunction with a signal separation unit, in which each received signal has associated channel transfer functions.” Ex. 1001, 12:42–45. The preamble of independent claim 9 similarly recites “a parameter estimation unit for use in conjunction with a signal separation unit for estimating channel transfer function parameters from channel transfer functions.” Id. at 14:4–7. Petitioner, however, contends that “this claim term is not part of the preamble” and that “the preamble is [only] ‘In a multi-user detection system in which interfering signals are purposely allowed to exist.’” Pet. 14. Regardless, Petitioner further contends, to the extent there is any argument that that recitation is part of the preamble, “it is limiting at least because it provides antecedent basis to the ‘parameter estimation unit’ and ‘associated channel transfer functions’ terms that are used in the remainder of the body of the claims and is ‘essential to understanding the structural limitations’ of the parameter estimation unit.” Id. Apart from arguing that the recited “parameter estimation unit” is limiting, Petitioner does not propose any id. Patent Owner does not respond to Petitioner’s contentions and also does not argue that any construction is necessary for the parameter estimation unit. See generally Prelim. Resp. As reproduced in Section II.D. above, the preamble of claim 1, in its entirety, recites, “In a multi-user detection system in which interfering signals are purposely allowed to exist, a parameter estimation unit for use in conjunction with a signal separation unit, in which each received signal has associated channel transfer functions.” Ex. 1001, 12:41–45. The preamble of claim 9 is similar. Id. at 14:3–7 (reciting “In a multi-user detection system in which interfering signals are purposely allowed to exist, a parameter estimation unit for use in conjunction with a signal separation unit for estimating channel transfer function parameters from channel transfer functions”). The body of each claim recites the elements of the recited “parameter estimation unit,” namely, “a signal processor for determining said channel transfer functions for each received signal” and “means . . . for providing uninterrupted estimates of the channel transfer function parameters on a real-time basis . . . .” The phrase “In a multi-user detection system in which interfering signals are purposely allowed to exist” provides additional context for the environment in which the parameter estimation unit is intended to operate. Whether the preamble is limiting is a question that we do not need to decide here, however. Only those claim terms that are in controversy need to be construed, and only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019). Because Patent Owner does not dispute Petitioner’s contentions with respect to the preamble recitations, and our decision herein need not reach a determination with regard to that question.” slip op. at 17

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “A claim limitation using the phrase “means for” creates a rebuttable presumption that the drafter intended to invoke 35 U.S.C. § 112 ¶ 6.6 See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015). Section 112 ¶ 6 provides that: An element in a claim for a combination may be expressed as a means . . . for performing a specified function without the recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof. When construing a means-plus-function limitation under § 112 ¶ 6, it is necessary first to identify the claimed function, and then to look to the specification to identify the corresponding structure for that function. In re Aoyama, 656 F.3d 1293, 1296–97 (Fed. Cir. 2011); Cardiac Pacemakers, Inc. v. St. Jude Med., Inc., 296 F.3d 1106, 1119 (Fed. Cir. 2002). Under that second step, “structure disclosed in the specification is corresponding 6 Section 4(c) of the Leahy-Smith America Invents Act (AIA) re-designated 35 U.S.C. § 112 ¶ 6, as 35 U.S.C. § 112(f). Because the ’676 patent has a filing date before September 16, 2012 (effective date of the statute), we refer to the pre-AIA version of 35 U.S.C. § 112. associates that structure to the function recited in the claim.” Med. Instrumentation & Diagnostics Corp. v. Elekta AB, 344 F.3d 1205, 1210 (Fed. Cir. 2003). Our Rules specifically require that the petition identify the corresponding structure in proposing a construction for a means-plus-function claim limitation. 37 C.F.R. § 42.104(b)(3). “This inquiry is undertaken from the perspective of a person of ordinary skill in the art.” Cardiac Pacemakers, 296 F.3d at 1113.” slip op. at 19

    Claim construction§ 103 obviousnesscites Phillips · Graham
    Patents in suitUS 6,947,505
  • PTAB · Feb 7, 2025 · IPR2024-01247 · APJ Donald E Daybell · IPR · Institution

    Institution was denied: claims 1–16 lacked a reasonable likelihood of success, and the Board declined to reach claims 17–18 because reviewing only two potentially viable claims would be inefficient.

    RulingsInstitution decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “as of the time of the invention of the ’492 Patent “had at least a bachelor’s in EE/CE/CS, physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks. More education can supplement practical experience and vice versa.” Pet. 5 (citation omitted). Patent Owner does not dispute Petitioner’s assertion. At this juncture, we adopt Petitioner’s definition. This definition appears to be consistent with what is reflected by the content of the applied prior art references. Cf. Okajima v. Bourdeau, 261 F.3d 1350, 1354–55 (Fed. Cir. 2001) (recognizing that the applied prior art may reflect an appropriate level of skill).” slip op. at 9

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for patent owner

      “In view of the parties’ agreement to adopt Patent Owner’s construction and the District Court’s persuasive analysis, we find that the “multi-user detector decision unit” terms in claims 1 and 10 are properly construed on the record before us to recite the functions “using decision criteria to determine a selected multi-user detector” for claim 1 and “select[ing] a multi-user detector based upon at least one threshold” for claim 10, both of which have the following corresponding structure: a MUD decision unit 220 (or, alternatively, decision logic unit 520) configured to perform one or more of the several decision algorithms (e.g., the BER/User, SINR/Symbol, Filtered SINR/Symbol, Detected Amount/Symbol, Correlation Matrix Ratio/User, Correlation Matrix Eigenvalues, Computational Complexity, Number of Bits, Number of Users, and other algorithms) disclosed at 8:12–18, 13:35–14:40, 15:3–21, 19:43– 48, 19:56–62, and 20:41–49 of the ’492 Patent.” slip op. at 12

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “a reasonable likelihood of success in establishing that Onggosanusi teaches or suggests these limitations. Petitioner does not rely on Egnor for these limitations. Therefore, Petitioner fails to show a reasonable likelihood of success in establishing that claims 1 and 10 would have been obvious over Onggosanusi and Egnor. Claims 2–9 and 11–16 depend from claims 1 and 10 respectively, and thus Petitioner likewise fails to show a reasonable likelihood of success that those dependent claims would have been obvious over Onggosanusi and Egnor. Therefore, we find that Petitioner fails to show a reasonable likelihood of success for Ground 1.” slip op. at 15

    • PTAB / AIA Trials › Discretionary denialInstitution denied discretionary otherInstitution denied

      “Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). “Even when a petitioner demonstrates a reasonable likelihood of prevailing with respect to one or more claims, . . . institution of review remains discretionary.” Chevron Oronite Co. v. Infineum USA L.P., IPR2018-00923, Paper 9 at 10 (PTAB Nov. 7, 2018) (informative) (citing SAS Inst. v. Iancu, 138 S. Ct. 1348, 1356 (2018); Harmonic, 815 F.3d at 1367). Where a Petition presents a reasonable likelihood of success as to only a small number of the challenged claims, the Board has the discretion to decline to institute review, because instituting a full review on all challenged claims may be an inefficient use of the Board’s limited resources. See, e.g., Deeper, UAB v. Vexilar, Inc., IPR2018-01310, Paper 7 at 42–43 (PTAB Jan. 24, 2019) (informative) (denying institution where a petitioner demonstrated a reasonable likelihood of success on only two out of twenty- a petitioner demonstrated a reasonable likelihood of success on only two out of twenty claims). Of the eighteen challenged claims, we have found that Petitioner failed to establish a reasonable likelihood of success as to sixteen of those claims. This leaves a single independent claim (claim 17) and a single dependent claim (claim 18) remaining for consideration. Even were we to conclude that Petitioner had established a reasonable likelihood of success as to claims 17 and 18, this would leave at most two claims subject to a single ground upon which such a showing had been made, out of eighteen challenged claims. Based on the particular circumstances of this case, it would be inefficient for the Board to expend resources on a full review of all eighteen challenged claims, where Petitioner has failed to establish even a reasonable likelihood of success as to the vast majority of those claims. Accordingly, we need not, and do not, take any position as to Petitioner’s showing on Ground 2 but instead exercise our discretion to deny review.” slip op. at 21

    Claim constructionDiscretionary denialcites Phillips · Graham
    Patents in suitUS 7,593,492
  • PTAB · Nov 22, 2024 · IPR2024-00872 · APJ Michael J Strauss · IPR · Institution

    The Board denied institution for claims 1–20 because Petitioner did not show a reasonable likelihood of prevailing on any ground, relying on Johnson’s unproven status as a printed publication.

    RulingsInstitution decision
    • Skill levelSkill level board ownDecided for patent owner

      “Patent Owner does not contest Petitioner’s description with regard to the level of skill at this stage of the proceedings. Prelim. Resp. 12. As Petitioner’s unchallenged description of the level of ordinary skill appears appropriate to the subject matter of the ’344 patent and the cited prior art, we apply it for purposes of this Decision, albeit without the two instances of the phrase “at least,” which introduce ambiguity. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (acknowledging that the prior art may reflect an appropriate level of skill in the art).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Neither party proposes express construction of any claim terms for our consideration. See Pet. 14 (“Petitioner submits that all claim terms in the ’344 Patent may be interpreted according to their plain and ordinary meaning.”); Prelim. Resp. 12 (“For purposes of this Preliminary Response only, Patent Owner agrees that claim construction is unnecessary.”). whether to institute inter partes review. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). At this stage, we do not see the need to construe any claim terms to resolve the issues in dispute.” slip op. at 8

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication not establishedNot shown unpatentable

      “of a document on a website archived by the Internet Archive. See Ex. 1018. That a person might have been able to download Johnson through public means is not evidence that Johnson was “made available to the extent that persons interested and ordinarily skilled in the subject matter or art exercising reasonable diligence, can locate it.” Bruckelmyer, 445 F.3d at 1378. The Frank-White Affidavit’s evidence of public accessibility amounts to little more than Johnson was available on the Internet by December 13, 2019. Pet. 15; Ex. 1018 ¶¶ 1–5, 7, Ex. B. However, because the Wayback Machine is only searchable by URL, as attested to in the Frank-White Affidavit, this does not suffice to support that one of ordinary skill in the art would have sought out the Read the Docs website and, once there, located Johnson without prior knowledge of Johnson and the URL at which Johnson was available. Accordingly, the Frank-White Affidavit alone is insufficient to prove public accessibility of Johnson.” slip op. at 20

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “that Johnson qualifies as a prior art printed publication. All asserted grounds for unpatentability rely, at least in part, on the disclosure of Johnson. Accordingly, because the record does not persuasively support Johnson as a publicly accessible printed publication, we find that Petitioner has not established a reasonable likelihood of prevailing on any of its grounds of unpatentability. III. CONCLUSION After considering the evidence and arguments presented in the Petition and the Preliminary Response, we determine that Petitioner does not demonstrate a reasonable likelihood of prevailing with respect to any of the challenged claims, and thus, we do not institute an inter partes review. ORDER In consideration of the foregoing, it is hereby ORDERED that the Petition is denied as to all challenged claims, and no trial is instituted.” slip op. at 25

    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 11,558,344
Page 1 of 9
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.