  • PTAB · May 16, 2025 · IPR2025-00010 · APJ Michelle N Wormmeester · IPR · Institution

    The Board denied institution of IPR challenging claims 1–14, exercising § 314(a) discretion under Fintiv because the balance of factors favored denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “2. Factor 2: ITC Final Determination Date Fintiv provides that an ITC trial date that is earlier than the Board’s projected statutory deadline for a final written decision may favor discretionary denial if the ITC is going to decide the same or substantially similar issues to those presented in the petition. Fintiv, Paper 11 at 8. The Guidance Memo further provides that “the Board is more likely to deny institution where the ITC’s projected final determination date is earlier than the Board’s deadline to issue a final written decision.” Guidance Memo 2. Here, the ITC has set the target date for its final determination to March 2, 2026. Ex. 2010, 3 (ITC Order Amending the Procedural Schedule). Our final written decision would be due almost three months later, in late May 2026, should we institute inter partes review.” slip op. at 8

    Discretionary denial
    Patents in suitUS 9,070,755
  • PTAB · Apr 23, 2025 · IPR2024-01465 · APJ Michelle N Wormmeester · IPR · Institution

    The Board denied institution of review of claims 1–19 under § 314(a), finding that the Fintiv factors overall favored discretionary denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “As noted above, the district court has set a trial date of October 6, 2025, which is almost seven months before the final written decision in this proceeding would be due in late April 2026. Although a number of cases may be scheduled for jury selection on the same day as the District Court Litigation, nothing in the record indicates a trial in the District Court Litigation would not take place months before our deadline to reach a final decision. Because the District Court Litigation will address the issues relating to the validity of the ’750 patent in a trial scheduled to occur several months before we would issue a final written decision, we weigh the second Fintiv factor as favoring discretionary denial.” slip op. at 9

    Discretionary denial
    Patents in suitUS 11,087,750
  • PTAB · Apr 23, 2025 · IPR2024-01464 · APJ Michelle N Wormmeester · IPR · Institution

    The Board denied institution of inter partes review of claims 1–18 under § 314(a), finding that the Fintiv factors overall favored discretionary denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. Fintiv, Paper 11 at 5–6. In considering these factors, we apply the guidance set forth in a Memorandum regarding “Guidance on USPTO’s recission of ‘Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation,’” issued by the Chief Administrative Patent Judge of the Patent Trial and Appeal Board on March 24, 2025 (hereinafter, “Guidance Memo”).7” slip op. at 5

    Discretionary denial
    Patents in suitUS 11,393,461
  • PTAB · Feb 11, 2025 · IPR2024-01232 · APJ Michelle N Wormmeester · IPR · Institution

    The Board denied institution on all challenged claims because Petitioner did not show a reasonable likelihood of prevailing on any obviousness ground; it also found the petition time-barred.

    RulingsInstitution decision
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied

      “later than one month after we initially instituted inter partes review in the Comcast IPR. See 37 C.F.R. § 42.122(b). As discussed above, however, inter partes review is no longer instituted in the Comcast IPR. Under these circumstances, we do not grant Petitioner’s Joinder Motion because there is no pending proceeding to join. See 35 U.S.C. § 315(c) (“If the Director institutes an inter partes review, the Director, in his or her discretion, may join as a party to that inter partes review any person who properly files a petition . . . that the Director . . . determines warrants the institution of an inter partes review.”). Petitioner’s Joinder Motion is denied.” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Prosecution history disclaimer / disavowalTerm construed board ownDecided for patent owner

      “least in part on a second message including at least one command in a second format.’” Pet. 4 (citing Ex. 1104, 168–173). The cited portion of the prosecution history shows that the applicant distinguished its claims from the prior art based on different first and second formats. The applicant argued in particular, Applicant submits that [the prior art] is completely silent with regard to “receiving, from the remote server device, a first message that includes at least one command in a first format, wherein the first message is received based at least in part on a second message including at least one command in a second format having been sent from the associated remote computing device.” In fact, [the prior art] never describes commands in different formats. . . . Ex. 1104, 170. Based on the applicant’s argument in this regard, we find that the prosecution history limits the scope of claim 1 to different first and second formats. In other words, the applicant’s argument during prosecution distinguishing its claims from the prior art based on different first and second formats overcomes the presumption based on claim differentiation that claim 1 encompasses first and second formats that are the same. See Fenner Invs., Ltd. v. Cellco P’Ship, 778 F.3d 1320, 1327 (Fed. Cir. 2015) (“Although claim differentiation is a useful analytic tool, it cannot . . . relieve any claim of limitations imposed by the prosecution history.”). Accordingly, claim 1 is limited to different first and second formats.” slip op. at 10

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “argument and evidence. As discussed above in the claim construction section, the recited first and second formats are limited to different formats. See supra Part IV.A. To satisfy this aspect of limitation 1D under its theory, Petitioner needs to show that in Danciu the format of the control information sent from the remote control to the server is different from the format of the control information sent from the server to the controlled device. The cited disclosures in Danciu, however, do not teach or suggest that these formats are different. Nor does Petitioner explain adequately how Danciu’s disclosures teach or suggest the two formats are different. We recognize that the control information in Danciu may be “processed” or “repackaged,” as Petitioner asserts, but it is not clear that the control information is processed or repackaged such that the format of the control information sent from the remote control to the server and the format of the control information sent from the server to the controlled device are different. Petitioner does not rely on Mahajan to teach or suggest the recited first and second formats but relies on Mahajan instead as providing “implementation details for transmission of commands for controlling a client.” Pet. 27. Petitioner contends that its proposed combination of Danciu and Mahajan would have provided a system where “Danciu’s remote control would translate commands associated with a first type of media playing application to a generic format, transmit them to the controlled device, which would translate them to a command associated with a second type of media playing application for execution.” Id. at 31. In other words, the controlled device would receive the generic commands sent from the remote control and then translate the generic commands. It is not clear how the proposed combination in this way teaches or suggests the format of a command sent from the remote control to a server is different from the format of a command sent from the server to the controlled device.” slip op. at 17

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentableNot shown unpatentable

      “Aldrey and Mahajan meets limitation 1D under Petitioner’s second theory. Petitioner only alleges that it would have been obvious to an ordinarily skilled artisan that Mahajan’s RTS Media Abstraction Module could operate at a server like Aldrey’s service provider network 103. Pet. 65. The Federal Circuit has explained that “obviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of prior art to arrive at the claimed invention.” Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015). Petitioner does not adequately explain why an ordinarily skilled artisan would have considered locating Mahajan’s abstraction module at a server, even if the abstraction module could operate at the server. See In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006) (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”). We note Petitioner further argues that combining Mahajan and Aldrey would have provided a system where “Aldrey’s end terminal would translate commands associated with a first type of media playing application to a command associated with a second type of media playing application on a STB.” Pet. 66–67; see also id. at 66 (“Mahajan’s server-command teachings could be implemented on Aldrey’s end terminal remote control.”). Arguing that Aldrey’s end terminal would translate commands seems inconsistent with Petitioner’s earlier argument for locating Mahajan’s abstraction module (which translates commands) at Aldrey’s network service provider. See id. at 65–67. Moreover, it is not readily apparent how command translation by Aldrey’s end terminal––rather than Aldrey’s network service provider–– teaches or suggests the format of a command sent from the end terminal to the network service provider is different from the format of a command sent from the network service provider to the STB. Petitioner does not close these logical gaps.” slip op. at 23

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips
    Patents in suitUS 11,048,751
  • PTAB · Feb 6, 2025 · IPR2024-00324 · APJ Michelle N Wormmeester · IPR · Rehearing

    The Board denied Comcast’s rehearing request and left in place denial of institution after finding no abuse of discretion in its construction and compelling-merits analysis.

    RulingsRehearing decision
    • RehearingRehearing, deniedDenied

      “abuse of discretion. See 37 C.F.R. § 42.71(c). An abuse of discretion occurs when a “decision [i]s based on an erroneous conclusion of law or clearly erroneous factual findings, or . . . a clear error of judgment.” PPG Indus., Inc. v. Celanese Polymer Specialties Co., 840 F.2d 1565, 1567 (Fed. Cir. 1988). “The burden of showing that a decision should be modified lies with the party challenging the decision.” Patent Trial and Appeal Board Consolidated Trial Practice Guide 90 (Nov. 2019) (hereinafter, “CTPG”).5 In its request for rehearing, the dissatisfied party must (1) “specifically identify all matters the party believes the Board misapprehended or overlooked” and (2) identify the place “where each matter was previously addressed.” 37 C.F.R. § 42.71(d); CTPG 90.” slip op. at 3

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “discretion to deny institution due to the advanced state of parallel litigation, taking into consideration the six factors identified in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 (PTAB Mar. 20, 2020) (precedential), as well as applying guidance set forth in a Memorandum regarding the “Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation” issued by the Director of the U.S. Patent and Trademark Office (hereinafter, “Guidance Memo”).6 Inst. Dec. 6–43. We determined that the first five Fintiv factors favor discretionary denial,7 and that the Petition presents compelling evidence of unpatentability as to independent claims 1, 12, and 17 under the sixth Fintiv factor. Id. at 15–16, 23–43. Because “the PTAB will not deny institution based on Fintiv if there is compelling evidence of unpatentability,” we declined to exercise our discretion to deny and instituted trial. Guidance Memo 5; Inst. Dec. 15–16. In our Rehearing Decision, however, we agreed with Patent Owner that we erred in determining the claim terms “first format” and “second format” are not limited to different formats, and determined that the proper construction of these claim terms indeed requires the two formats to be different formats. Reh’g Dec. 5–9, 19. Applying the proper construction, we further determined that none of Petitioner’s asserted challenges presents compelling merits of unpatentability as to any claim of the ’751 patent, 6 Available at https://www.uspto.gov/sites/default/files/documents/interim_ proc_discretionary_denials_aia_parallel_district_court_litigation_memo_20 220621_.pdf. 7 Our analysis of the first five Fintiv factors in our First Institution Decision remains undisturbed on rehearing. contrary to our initial determination in the Institution Decision. Id. at 19–20. Having determined that the first five Fintiv factors favor discretionary denial, and that the Petition does not meet the compelling merits standard of the Guidance Memo under the sixth Fintiv factor, we modified our decision and denied institution on rehearing. Id. at 20.” slip op. at 4

    • Claim Construction › Intrinsic evidence (Phillips canons) › Prosecution history disclaimer / disavowalDisclaimer foundDecided for patent owner

      “Contrary to Petitioner’s position, Patent Owner met its burden of showing that our Institution Decision should be modified. In our Institution Decision, we relied on claim differentiation when we determined that claim 1 is not limited to different first and second formats. Inst. Dec. 31. We did not consider the prosecution history, which was part of the record. See Phillips v. AWH Corp., 415 F.3d 1303, 1317 (Fed. Cir. 2005) (“[W]e have held that a court ‘should also consider the patent’s prosecution history, if it is in evidence.’”). As we noted in our Rehearing Decision, however, the Federal Circuit has explained that “[t]he prosecution history modifies the scope of a claim term if ‘the patentee distinguished that term from prior art on the basis of a particular embodiment, expressly disclaimed subject matter, or described a particular embodiment as important to the invention.” Reh’g Dec. 8 (quoting Sentry Protection Prods., Inc. v. Eagle Mfg. Co., 400 F.3d 910, 915 (Fed. Cir. 2005)). The Federal Circuit also has explained that “[a]lthough claim differentiation is a useful analytic tool, it cannot . . . relieve any claim of limitations imposed by the prosecution history.” Id. at 13 (quoting Fenner Invs., Ltd. v. Cellco P’Ship, 778 F.3d 1320, 1327 (Fed. Cir. 2015)). In other words, we erred in not considering the prosecution history, which led to our erroneous conclusion that claim 1 is not limited to different first and second formats. See Ex. 1104, 170 (prosecution history). Our Institution Decision was based on this erroneous conclusion of law, as Patent Owner argued, and we modified it accordingly.” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable

      “claim 1. As discussed above with respect to limitation 1D, Petitioner asserted that its proposed combination of Danciu and Mahajan would have provided a system where “Danciu’s remote control would translate commands associated with a first type of media playing application to a generic format, transmit them to the controlled device, which would translate them to a command associated with a second type of media playing application for execution.” Reh’g Dec. 12–13 (quoting Pet. 31). In other words, both Danciu’s remote control and controlled device translate commands. With respect to claim 5, Petitioner asserted that Mahajan’s abstraction module could operate at Danciu’s server. Pet. 43. Even if Mahajan’s abstraction module (which translates commands) could operate at Danciu’s server, Petitioner does not adequately explain why an ordinarily skilled artisan would have had reason to modify Danciu’s system to locate Mahajan’s abstraction module at the server, especially where both Danciu’s remote control and controlled device already translate commands. See In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006) (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”). Petitioner does not point to anything in its analysis of claim 5 that demonstrates we misapprehended or overlooked a matter.” slip op. at 15

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips
    Patents in suitUS 11,048,751
  • PTAB · Nov 22, 2024 · IPR2024-00825 · APJ Andrew L Nalven · IPR · Institution

    The Board denied institution because the petition did not show a reasonable likelihood of proving any challenged claim unpatentable under the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Pursuant to 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons that follow, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing in demonstrating the unpatentability of at least one of the challenged claims. Accordingly, we decline to institute an inter partes review.” slip op. at 2

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner

      “Step 1 of Figure 7 begins by obtaining the geographic information of the area to search for possible remote targets. Id. at 8:57–59. In step 2, the next geographic region where a possible search for a PRU is estimated. Id. at 8:64–66. In step 3, a page is sent out to that geographic region for remote units in the region to reveal their location. Id. at 9:2–4. In steps 4 and 5, if remote units are identified in the paged area, that information is forwarded to the network and the process continues to step 7 where the process is aborted. Id. at 9:4–6. Step 6 is performed if no units are identified in the paged area. Id. at 9:6–9. There, a check is done to establish if there are any remaining cells or grids higher up in the chain to be searched, and if so, the process returns to step 2 to search additional geographic areas. Id. at 9:9–12. The iterative process described in Figure 7 is consistent with Patent Owner’s proposed construction requiring forwarding a notification to only one or more PRUs currently located in a specific geographic boundary. Ex. 2001 ¶ 55; see also Ex. 1001, 8:32–54 (describing a grid search technique that may be implemented by the process of Figure 7).” slip op. at 13

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “(“POSITA”) would have had “a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent.” Pet. 8 (citing Ex. 1002 ¶¶ 28–30). Patent Owner does not dispute Petitioner’s proffered definition as to the level of ordinary skill in the art. Prelim. Resp. 6. For purposes of this Decision, we adopt Petitioner’s assessment, which is consistent with the level of skill reflected in the Specification and asserted prior art.” slip op. at 16

    • Expert testimonyPatent owner expert creditedDecided for patent owner

      “We are further not persuaded by Petitioner’s argument that forwarding notifications to the PRUs only within a specified geographic region renders element 12[D]’s step of verifying whether the PRUs exists within said region unnecessary. Pet. 35 n.8. Rather, we credit Mr. McAlexander who testifies that forwarding notifications to individually pollable geographic boundaries “does not obviate the need for the PRU to identify that the notification has been received or verify its location within the individual geographic boundary before responding.” Ex. 2001 ¶ 155.” slip op. at 15

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,199,726
  • PTAB · Nov 22, 2024 · IPR2024-00827 · APJ Thomas L Giannetti · IPR · Institution

    Institution was denied because Petitioner did not show a reasonable likelihood of proving claims 1, 2, 15, or 22 unpatentable on any asserted obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 6 (citing Andrews Decl. ¶ 25). At this stage, Patent Owner does not dispute this contention. Prelim. Resp. 5. For the purpose of determining institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’918 patent specification and the asserted prior art.” slip op. at 20

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “means.” See Ex. 1001, 11:60–12:4, 12:6–8, 15:30–37. The use of the word “means” in a claim element creates a rebuttable presumption that 35 U.S.C. § 112 ¶ 63 applies. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). 3 Section 4(c) of the AIA re-designated 35 U.S.C. § 112, sixth paragraph, as 35 U.S.C. § 112(f). Because the ’918 patent has a filing date before the We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 1, 2, and 22. See Pet. 7–12; Prelim. Resp. 9–21. slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “Having reviewed Patent Owner’s position on claim limitation 1[C], we determine that we do not need to expressly construe this claim term to effective date of the relevant amendment, we refer to the pre-AIA version of § 112. Owner acknowledges that the asserted network “includes control units programmed to obtain the locations of the offender and victim devices,” and does not base its arguments on the construction of this limitation. Id. at 42.” slip op. at 11

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,756,918
  • PTAB · Nov 22, 2024 · IPR2024-00826 · APJ Thomas L Giannetti · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving any challenged claim unpatentable on the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 8 (citing Andrews Decl. ¶¶ 25–26). Patent Owner does not dispute this contention or offer an alternative formulation. See Prelim. Resp. 6. For the purpose of institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’752 patent specification and the asserted prior art.” slip op. at 19

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “1. Means-Plus-Function Terms Challenged claims 14 and 15 recite elements using the word “means.” See Ex. 1001, 13:6–18, 13:20–22. The use of the word “means” in a claim ’752 patent has a filing date prior to the effective date of the applicable AIA amendment, we refer to the pre-AIA version of §103. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). Construing a means-plus-function claim term is a two-step process. We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 14 and 15. See Pet. 8–12; Prelim. Resp. 11–19.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner

      “geographic region.” The ’752 patent describes polling specific sub-regions of the network for a PRU. Ex. 1001, 2:12–15, 7:22–34. As Mr. McAlexander testifies, “[a] PRU may choose to instruct the network to relay certain information to mobile units in a specific geographic region. That information would then be appended to the geographic boundary information and beamed in the specified geographic region.” McAlexander Decl. ¶ 49 (quoting Ex. 1001, 10:19–23) (alteration in original). For example, a nearby boundary can be polled for the locations of nearby wireless customers within proximity of a distressed wireless customer. As described in the ’752 patent, a distressed mobile user M1 may need to find where another party might exist in that geographic region. The user could initiate a page from their PRU for the closest available PRUs that could be found in that geographic jurisdiction. Looking at FIG. 3, mobile user M1 will provide its location, latitude and longitude (x0,y0) to the closest available ground station serving area C1 or grid G1. As stated earlier, appropriate terrestrial technology will be scattered in that region to serve the PRUs in that area as shown in FIG. 1. Once a ground station picks up this signal, it sends a page for all location reporting devices in the specified boundary surrounding mobile unit M1, FIG. 3 to disclose their location. Ex. 1001, 7:22–34 (emphasis added). slip op. at 18

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,441,752
  • PTAB · Oct 9, 2024 · IPR2024-00324 · APJ Michelle N Wormmeester · IPR · Rehearing

    Patent Owner’s rehearing request was granted; the Petition was denied and no trial instituted because the challenges did not meet the compelling-merits standard under Fintiv.

    RulingsRehearing decision
    • RehearingRehearing, grantedGranted

      “abuse of discretion. See 37 C.F.R. § 42.71(c). An abuse of discretion occurs when a “decision [i]s based on an erroneous conclusion of law or clearly erroneous factual findings, or . . . a clear error of judgment.” PPG Indus., Inc. v. Celanese Polymer Specialties Co., 840 F.2d 1565, 1567 (Fed. Cir. 1988). “The burden of showing that a decision should be modified lies with the party challenging the decision.” Office Patent Trial Practice Guide, 77 Fed. Reg. 48,756, 48,768 (Aug. 14, 2012). In its request for rehearing, the dissatisfied party must (1) “specifically identify all matters the party believes the Board misapprehended or overlooked” and (2) identify the place “where each matter was previously addressed.” 37 C.F.R. § 42.71(d); Office Patent Trial Practice Guide, 77 Fed. Reg. at 48,768.” slip op. at 3

    • Claim Construction › Intrinsic evidence (Phillips canons) › Prosecution history disclaimer / disavowalTerm construed board ownDecided for patent owner

      “Our reviewing court has explained that “[t]he prosecution history modifies the scope of a claim term if ‘the patentee distinguished that term from prior art on the basis of a particular embodiment, expressly disclaimed subject matter, or described a particular embodiment as important to the invention.’” Sentry Protection Prods., Inc. v. Eagle Mfg. Co., 400 F.3d 910, 915 (Fed. Cir. 2005) (quoting CCS Fitness, Inc. v. Brunswick Corp., 228 F.3d 1359, 1366–67 (Fed. Cir. 2002)).” slip op. at 8

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “discretion to deny institution due to the advanced state of parallel litigation, taking into consideration the six factors identified in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 (PTAB Mar. 20, 2020) (precedential), as well as applying guidance set forth in a Memorandum regarding the “Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation” issued by the Director of the U.S. Patent and Trademark Office (hereinafter, “Guidance Memo”).5 Inst. Dec. 6–43. We determined that the first five Fintiv factors favor discretionary denial,6 and that the Petition presents compelling evidence of unpatentability as to independent claims 1, 12, and 17 under the sixth Fintiv factor. Id. at 15–16, 23–43. Because “the PTAB will not deny institution based on Fintiv if there is compelling evidence of unpatentability,” we declined to exercise our discretion to deny. Guidance Memo 5; Inst. Dec. 15–16.” slip op. at 4

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableMotivation not foundNot shown unpatentable

      “those arguments. See Inst. Dec. 45–47. As to Petitioner’s arguments on the claimed first and second formats of limitation 1D in particular, we found the record provided “some support” for Petitioner’s position that “it would have been obvious to a [person of ordinary skill in the art] that one or more RTS Media Abstraction Modules could operate at a server, such as in [Aldrey’s] Service Provider Network 103,” even though Petitioner asserted that Mahajan teaches command conversion at the client. Id. at 45–46 (citing Pet. 66–67). Yet assuming Mahajan’s RTS Media Abstraction Module could have operated at a server, as Petitioner argued, it is not readily apparent why an ordinarily skilled artisan would have considered locating the RTS Media Abstraction Module at a server based on Mahajan’s disclosure of command conversion at a client. See also Pet. 66 (“[I]t would have been obvious to a [person of ordinary skill in the art] that the RTS Media Abstraction Module could be located on the client or server.” (emphasis added)). Nor did Petitioner adequately explain why an ordinarily skilled artisan would have considered locating Mahajan’s RTS Media Abstraction Module at a server. We note Petitioner further argued that combining Mahajan and Aldrey would have provided a system where “Aldrey’s end terminal would translate commands associated with a first type of media playing application to a command associated with a second type of media playing application on a STB.” Pet. 68; see also id. at 67 (“Mahajan’s server-command teachings could be implemented on Aldrey’s end terminal remote control.”). Arguing that Aldrey’s end terminal would translate commands seems inconsistent with Petitioner’s earlier argument for locating command conversion at Aldrey’s network service provider. See id. at 66–68. Moreover, it is not readily apparent how command translation by Aldrey’s end terminal––rather than Aldrey’s network service provider––teaches or suggests the format of a command sent from the end terminal to the network service provider is different from the format of a command sent from the network service provider to the STB. Petitioner did not close these logical gaps, leaving its case short of compelling.” slip op. at 18

    Claim construction§ 103 obviousnessDiscretionary denial
    Patents in suitUS 11,048,751
  • PTAB · Sep 10, 2024 · IPR2024-00607 · APJ Michelle N Wormmeester · IPR · Institution

    The Board denied institution for claims 1–4 because the Fintiv factors favored discretionary denial and the petition did not present compelling evidence of unpatentability.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “As discussed above, Fintiv factors 2, 3, and 5 favor denial. Factor 1 is neutral, and only factor 4 weighs against denial. Thus, we determine that the first five Fintiv factors favor discretionary denial, and we now assess compelling merits. CommScope, Paper 23 at 5 (“In circumstances where, however, the Board’s analysis of Fintiv factors 1–5 favors denial of institution, the Board shall then assess compelling merits.”). According to the Guidance Memo, the compelling merits standard is met when “the evidence, if unrebutted in trial, would plainly lead to a conclusion that one or more claims are unpatentable by a preponderance of the evidence.” Guidance Memo, 4. A challenge can only meet this standard “if it is highly likely that the petitioner would prevail with respect to at least one challenged claim.” OpenSky Indus., LLC v. VLSI Tech. LLC, IPR2021- 01064, Paper 102 at 49 (PTAB Oct. 4, 2022) (precedential) (“OpenSky”). We note that the Guidance Memo does not change the statutory standard for institution under 35 U.S.C. § 314(a). Instead, a determination of compelling merits will outweigh the other Fintiv factors, and such challenges will be allowed to proceed even if a district court litigation is proceeding in parallel. Id.” slip op. at 16

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “For the reasons that follow, we exercise our discretion under 35 U.S.C. § 314(a) to deny institution of inter partes review.” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “c. Summary In view of the foregoing, we determine that Petitioner’s obviousness challenges based on Lee do not meet the compelling merits standard with respect to claim 1. Petitioner does not rely on Kim to teach the recited “predetermined time from the transmission of the deactivation message.” See Pet. 34–37, 48–55 (relying on Kim for limitation “stopping downlink (DL) transmission of the secondary carrier and initializing uplink (UL) and DL retransmission buffers after transmitting the deactivation message”). Claims 2–4 depend from claim 1. Petitioner’s contentions regarding these dependent claims rely on the same analysis for the limitation of claim 1 discussed above. See Pet. 55, 57, 60. Accordingly, we also determine that Petitioner’s obviousness challenges based on Lee do not meet the compelling merits standard with respect to claims 2–4.” slip op. at 30

    § 103 obviousnessDiscretionary denial
    Patents in suitUS 9,144,106
Page 1 of 9
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.