  • PTAB · Dec 19, 2025 · IPR2025-00434 · APJ Mitchell G Weatherly · IPR · Rehearing

    The Board denied Petitioner’s rehearing request, leaving institution denied because Shen and Soldano did not establish a reasonable likelihood of anticipating claims 1–7.

    RulingsRehearing decision
    • RehearingRehearing, deniedDenied

      “When rehearing a decision on petition, the Board will review the decision for an abuse of discretion. See 37 C.F.R. § 42.71(c). An abuse of discretion may be determined if a decision is based on an erroneous interpretation of law, if a factual finding is not supported by substantial evidence, or if the decision represents an unreasonable judgment in weighing relevant factors. See Arnold P’ship v. Dudas, 362 F.3d 1338, 1340 (Fed. Cir. 2004). The party challenging the decision has the burden of showing the decision should be modified, and the request for rehearing “must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed” in its papers. 37 C.F.R. § 42.71(d).” slip op. at 2

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “II. ANALYSIS In our Decision, we concluded that Petitioner had failed to carry its burden of demonstrating a reasonable likelihood of prevailing that either Shen or Soldano anticipated claims 1–7. Dec. 18, 26. Petitioner argues that we should institute review for three reasons. First, Petitioner argues that we abused our discretion by (a) “refusing” to interpret the scope of the claimed” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Owner’s interpretation of “carrier” as meaning “one or more components for supporting ROSA components such as an AWG.” Dec. 9 (quoting Pet. 11). For our analysis of Petitioner’s challenges, we referred to this interpretation of “carrier” as Petitioner’s second alternative construction. Id. We also noted that Petitioner appeared to dispute Patent Owner’s interpretation when it argued that “carrier” should mean “a ceramic or silicon substrate.” Id. (quoting Pet. 10). We referred to this interpretation of “carrier” as the first alternative construction. Id. Rather than resolve this apparent dispute about the meaning of “carrier,” we found that both of Petitioner’s anticipation challenges failed under both interpretations of “carrier.” Id. at 10–26. Because we found that Petitioner had failed to carry its burden regardless of which interpretation of “carrier” applied, we found it unnecessary to resolve the dispute over that interpretation. Id. at 9–10. For the reasons expressed in Parts II.B–C below, we maintain our conclusion that Petitioner has failed to demonstrate a reasonable likelihood of proving that either Shen or Soldano anticipates any claim under either interpretation of “carrier.” Accordingly, Petitioner fails to demonstrate an abuse of discretion in our alleged “refusal” to interpret “carrier.”” slip op. at 3

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Reh’g Req. 14. We cannot weigh Petitioner’s arguments based on its assertions about “caselaw” because Petitioner cited no cases to support its arguments. See id. Nevertheless, we infer that Petitioner intends its statements of “caselaw” to refer to the requirements to make out a case for anticipation. If so, Petitioner demonstrably miscasts what appear to be the legal principles for proving anticipation. As stated in our Decision: “A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of California, 814 F.2d 628, 631 (Fed. Cir. 1987).” Dec. 7. Making a showing that a prior art reference anticipates a patent claim thus necessarily requires proof that a single reference “expressly or inherently” describes every element of that claim and with all elements being arranged in the reference as they are in the” slip op. at 7

    Claim construction§ 102 anticipation
    Patents in suitUS 10,379,301
  • PTAB · Dec 12, 2025 · IPR2025-01175 · APJ James A Tartal · IPR · Institution

    The Board denied institution because Petitioner did not sufficiently show the patent was eligible for IPR when it filed the petition less than two months after issuance.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “We determine that Petitioner cannot credibly certify that the ’418 patent is available for inter partes review, based on a claim of priority on the face of the ’418 patent to the ’939 provisional application filed prior to the effective date of the AIA, where, as here, Petitioner contradictorily contends in the Petition that the ’939 provisional application “does not support all claim limitations” of the ’418 patent.4 Id. If Petitioner’s allegation that claims of the ’418 patent are not supported by the ’939 provisional application is correct, then the ’418 patent would be a post- AIA patent for which a petition may not be filed earlier than 9 months after the ’418 patent issued. See 35 U.S.C. § 311(c). Thus, based on the arguments and evidence presented by Petitioner, Petitioner fails to show that the ’418 patent is eligible for inter partes review when Petitioner filed the Petition less than two months after the ’418 patent issued. 35 U.S.C. § 311(c), 37 C.F.R. § 42.102(a)(1). We, therefore, deny the Petition. IV. CONCLUSION For the foregoing reasons, we find that Petitioner has not shown sufficiently that the Petition complies with 35 U.S.C. § 311(c) and, therefore, deny the Petition.” slip op. at 10

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportNot reached

      “review when the Petition was filed “because the ’418 Patent claims priority to December 7, 2012 and is therefore,” not a post-AIA patent. Pet. 17 (emphasis added). Contrary to Petitioner’s assertion, the ’418 patent is a post-AIA patent if any claim of the ’418 patent does not have priority to the ’939 provisional application, regardless of whether, on its face, the ’418 patent “claims priority” to an application filed prior to the effective date of the AIA. See In re NTP, Inc., 654 F.3d 1268, 1276–77 (Fed. Cir. 2011) (“[A] patent’s claims are not entitled to an earlier priority date merely because the patentee claims priority.”).” slip op. at 9

    § 102 anticipation
    Patents in suitUS 12,290,418
  • PTAB · Dec 3, 2025 · PGR2025-00056 · APJ Steven M Amundson · PGR · Institution

    Institution was denied because Petitioner did not show it was more likely than not that claims 1–20 were unpatentable under the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “to institute a post-grant review. We may not institute a post-grant review unless we determine that “the information presented in the petition filed under section 321, if such information is not rebutted, would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a) (2024). After considering the Petition, the Preliminary Response, the Preliminary Reply, the Preliminary Sur-reply, and the evidence of record, and for the reasons explained below, we determine that Petitioner has failed to demonstrate that it is “more likely than not” that at least one of the claims challenged in the Petition is unpatentable. Hence, we deny the Petition and do not institute a post-grant review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “effective filing date would have had “at least a bachelor’s degree in electrical engineering, computer science, or a similar degree and at least four years of experience in applied electromagnetics with an emphasis on antennas.” Pet. 10 (quoting Ex. 1018 ¶ 32). Petitioner also asserts that “[a]lternatively, the person of ordinary skill in the art would have a master’s degree in electrical engineering (or similar discipline) and at least two years of similar experience.” Id. (quoting Ex. 1018 ¶ 32). Dr. van der Weide’s testimony supports Petitioner’s assertions. See Ex. 1007 ¶ 39. For purposes of the Preliminary Response only, Patent Owner employs Petitioner’s description of an ordinarily skilled artisan. Prelim. Resp. 22. Based on the current record and for purposes of this decision, we accept Petitioner’s description of an ordinarily skilled artisan because it comports with the technology and claims of the ’149 patent as well as the asserted references. See, e.g., Ex. 1005, 1:35–6:56, 42:44–46:28, code (57); infra §§ III.E.1–III.E.2, III.G.1–III.G.2, III.H.1.” slip op. at 25

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “4. DISCUSSION “[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.” Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); see Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Based on the current record, we determine that no claim term requires an explicit construction to decide whether Petitioner satisfies the “more likely than not” standard for instituting a post-grant review. As Petitioner recognizes, the ’149 patent defines many of the claim terms Petitioner discusses in the “Claim Interpretation” section of the Petition. See Pet. 14–16. For instance, the patent defines “antenna rectangle” as “the orthogonal projection of the antenna box along the normal to the face with largest area of the antenna box.” Ex. 1005, 14:21–24. Further, the patent defines “complexity factor F21” and “complexity factor F32” consistent with the independent claims. See id. at 17:16–21, 17:49–61, 18:8–18, 19:12–25, 20:5–17, 42:62–43:25, 44:5–30, 45:8–46:3. E. Alleged Obviousness over Dou and Ciais-Multiband: Claims 7–9, 11–14, 16, 17, 19, and 20 Petitioner contends that claims 7–9, 11–14, 16, 17, 19, and 20 are” slip op. at 28

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentableNot shown unpatentable

      “Petitioner does not explain why an ordinarily skilled artisan who used Ciais-Quadband’s antenna for Dou’s two antennas 206 and 208 would have departed from the commonly accepted rule of thumb and Dou’s preference for at least a quarter-wavelength spacing between antennas at the lowest frequency to the extent needed to implement the proposed combination, i.e., with only about 55% of the preferred spacing between antennas. See Pet. 60–69; Ex. 1007 ¶¶ 172–187. Hence, based on the current record, Petitioner does not establish sufficiently for purposes of institution that an ordinarily skilled artisan would have been motivated to combine Ciais-Quadband’s teachings with Dou’s teachings in the way Petitioner proposes. Further, the addition of two Nakano InvFL antennas extending from the ground plane both above and below the PCB does not remedy the insufficient spacing between “the swapped-in Ciais-Quadband antennas.” Ex. 2010 ¶ 67.” slip op. at 69

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 12,095,149
  • PTAB · Nov 4, 2025 · IPR2025-00785 · APJ Stephen E Belisle · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–14 were unpatentable over either asserted § 103 combination.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “review. 35 U.S.C. § 314(b) (2024); 37 C.F.R. § 42.4(a) (2024). We may not institute an inter partes review “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). The “reasonable likelihood” standard is “a higher standard than mere notice pleading” but “lower than the ‘preponderance’ standard to prevail in a final written decision.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential). When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim. 37 C.F.R. § 42.108(a).” slip op. at 2

    • BurdenDenied

      “Petitioner’s single-reference allegations do not align with its two “combination” challenges identified above. As for its “combination” allegations, Petitioner does not identify, for example: (1) which limitations in claim 1 are missing in any of Chow, Reiffin, and Kurowski; (2) which aspects of any of these references requires modification to achieve the invention of claim 1; (3) which specific reference Petitioner posits to teach any such missing limitation in another reference or as the basis to modify a specific feature in a given reference; or (4) a rational reason as to why the skilled artisan would have combined particular teachings from one of Chow, Reiffin, and Kurowski with particular teachings of another such reference to achieve the invention of claim 1 as a whole.5 Instead, Petitioner improperly punts its burden to define its obviousness challenges to the Board (and Patent Owner). See, e.g., Pet. 38 (“To the extent the Board disagrees that [any particular] limitation is disclosed by the Chow/Reiffin combination 4 See, e.g., Pet. 16, 19 (“Thus, Chow and Reiffin both disclose or suggest claim [1b].” “Therefore, claim 1 was obvious over Chow and Reiffin separately and over their combination.”); see also id. at 12–19, 37–42. 5 Petitioner argues that the skilled artisan would have combined Reiffin with Chow for “increased computational power and the ability to solve larger problems.” Pet. 11. These generic “reasons” to combine the alleged teachings of Chow and Reiffin (and Kurowski) lack rational underpinning, particularly because Petitioner does not even identify which teachings of which references are being combined to achieve any particular limitation in claim 1. See Prelim. Resp. 40 (“[Petitioner’s] ‘spaghetti on the wall’ approach fails [to] explain how Petitioners’ purported motivation for combining Chow and Reiffin fits with each of the at least 64 different possibilities for combining Chow and Reiffin.”).” slip op. at 14

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “and quotes various passages in Chow. Pet. 13–14. For example, Petitioner identifies that, under “Description of the Related Art,” Chow states: “Typically, workload is apportioned by somehow logically dividing the data to be processed. For example, a block of data might be divided evenly into a number of parts equal to the number of available threads, so that each thread can independently process a separate portion of the data. This is called ‘static’ or ‘a priori’ partitioning.” Pet. 13 (citing Ex. 1003, 1:38–42; Ex. 1022 ¶ 144). Petitioner also identifies that Chow describes “aggregate tasks” divisible into “multiple sub-tasks,” and “multiple task execution units are independently operated on-demand to sequentially self-allocate and execute sub-tasks of the aggregate task.” Pet. 13–14 (citing Ex. 1003, 1:66–2:15). After presenting such quoted passages from Chow, Petitioner proffers the conclusion that Chow discloses the Partitioning Limitation, but does so without sufficiently explaining why such passages allegedly teach or suggest the features of the Partitioning Limitation not only within the context of claim 1 as a whole, but given that Chow itself disparages such “static” or “a priori” partitioning as posing “a significant problem” (Ex. 1003, 1:52–58). Patent Owner persuasively responds (and we agree for the same” slip op. at 19

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable

      “combination” challenges identified above. As for its “combination” allegations, Petitioner does not identify, for example: (1) which limitations in claim 1 are missing in any of Chow, Reiffin, and Kurowski; (2) which aspects of any of these references requires modification to achieve the invention of claim 1; (3) which specific reference Petitioner posits to teach any such missing limitation in another reference or as the basis to modify a specific feature in a given reference; or (4) a rational reason as to why the skilled artisan would have combined particular teachings from one of Chow, Reiffin, and Kurowski with particular teachings of another such reference to achieve the invention of claim 1 as a whole.5 Instead, Petitioner improperly punts its burden to define its obviousness challenges to the Board (and Patent Owner). See, e.g., Pet. 38 (“To the extent the Board disagrees that [any particular] limitation is disclosed by the Chow/Reiffin combination 4 See, e.g., Pet. 16, 19 (“Thus, Chow and Reiffin both disclose or suggest claim [1b].” “Therefore, claim 1 was obvious over Chow and Reiffin separately and over their combination.”); see also id. at 12–19, 37–42. 5 Petitioner argues that the skilled artisan would have combined Reiffin with Chow for “increased computational power and the ability to solve larger problems.” Pet. 11. These generic “reasons” to combine the alleged teachings of Chow and Reiffin (and Kurowski) lack rational underpinning, particularly because Petitioner does not even identify which teachings of which references are being combined to achieve any particular limitation in claim 1. See Prelim. Resp. 40 (“[Petitioner’s] ‘spaghetti on the wall’ approach fails [to] explain how Petitioners’ purported motivation for combining Chow and Reiffin fits with each of the at least 64 different possibilities for combining Chow and Reiffin.”). slip op. at 14

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,257,582
  • PTAB · Oct 23, 2025 · IPR2025-00815 · APJ Cynthia M Hardman · IPR · Institution

    The Board denied institution because ClearCorrect did not show a reasonable likelihood that claims 1–24 would have been obvious over Chishti-511, Chishti-876, Sachdeva, and Becker.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “3. Analysis In view of the arguments and cited evidence, we find on this record that Petitioner has not demonstrated a reasonable likelihood of showing that a person of ordinary skill in the art would have been motivated to combine Becker’s round-tripping with the teachings of the Chishti patents and Sachdeva.” slip op. at 20

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “At this stage, Patent Owner does not dispute Petitioner’s proposal or offer an alternative proposal. See generally Prelim. Resp. Because Petitioner’s proposed level of ordinary skill in the art appears to be consistent with the cited prior art and is undisputed on this record, we adopt it for purposes of this Decision. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (indicating that the prior art itself may reflect an appropriate skill level).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “Neither party indicates that any other claim term requires express construction. Only claim terms in controversy need be construed. Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”). For purposes of this Decision, we determine that no other claim term requires construction.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITA

      “Court for the Western District of Texas (see supra Section I.B), they jointly adopted the definition of “round-tripping” set forth in the ’879 patent Specification. Pet. 9; Prelim. Resp. 8; Ex. 1013, 8. The ’879 patent Specification defines “round-tripping” as moving a first tooth out of the path of a second tooth, and once the second tooth has moved sufficiently, moving the first tooth back to its previous position before proceeding to a desired final position of that first tooth. See Ex. 1001, 13:9–13. We adopt this agreed-upon construction for purposes of this Decision.” slip op. at 9

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,524,879
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • PTAB · Oct 8, 2025 · IPR2025-00701 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–14 were obvious over the asserted combinations.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’138 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 1–14 of the ’138 patent.” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states that “the claim terms should be given their plain and ordinary meaning and no claim construction is necessary to find the claims unpatentable.” Pet. 6. Patent Owner does not address claim construction. See generally Prelim. Resp. We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 8

    • Skill levelSkill level petitioner adoptedOther

      “a Ph.D. or master’s degree in electrical engineering, physics, materials science, or a related field, and at least one year or four years, respectively, of experience in the research, design, and/or development of magnetic/spintronic devices, or the equivalent. Pet. 8 (citing Ex. 1024 ¶¶ 25–29). Petitioner contends that less work experience can be compensated for by a higher level of experience and vice versa. Id. (citing Ex. 1024 ¶ 25). Petitioner also asserts that the proposed level of skill would be the same under any of the United States, Japanese, or PCT application dates. Id. at 8–9 (citing Ex. 1024 ¶¶ 24–25). Patent Owner does not challenge Petitioner’s proposed level of qualifications for one of ordinary skill in the art. Prelim. Resp. 20. At this stage of the proceeding, we adopt Petitioner’s assessment of the level of skill in the art, which is consistent with the ’138 patent and the asserted prior art of record.” slip op. at 7

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “As discussed above, Petitioner relies upon Parkin, and its layers 115 and 175, as the claimed first and second ferromagnetic material layers, respectively. See Pet. 10, 16. Petitioner admits that these layers are 8 In the Petition, Petitioner refers to the lower electrode “ferromagnetic layer 110’ as discussed in Claim 1[a]” in the discussion of limitation 1[d]. Pet. 18. Petitioner’s reference to “layer 110’” appears to be in error because the Petition’s discussion for limitation 1[a] refers to layer 115 of Parkin, as does Dr. Bokor’s testimony related to limitations 1[a] and 1[d]. Pet. 10; Ex. 1024 ¶¶ 109, 136. amorphous, but contends that, as Parkin discloses, these layers may be annealed. Id. at 17. Petitioner, however, refers to Parkin’s disclosure that only “a portion of the storage layer 175” is crystallized after annealing. Id. at 17–18 (citing Ex. 1062, 18:51–55) (emphasis added). Petitioner also relies upon Parkin’s “thin crystalline ferromagnetic layer” that is crystallized to teach limitation 1[d]. Id. at 18 (citing Ex. 1062, 18:55–59; Ex. 1024 ¶¶ 131–132) (emphasis added). Dr. Bokor additionally testifies that it is “Parkin’s ‘thin crystalline ferromagnetic layer’ of CoFeB” that meets the “entirely crystallized” requirement of limitation 1[d]. Ex. 1024 ¶ 132. Parkin, however, states that a thin crystalline ferromagnetic layer is formed, but “the bulk of storage layer 175 remains amorphous.” Ex. 1062, 18:55–60 (emphasis added). Petitioner fails to reconcile how its assertions that the first and second ferromagnetic layers, which are mapped to the totality of layers of 115 and 175, meet the limitation that the first and second ferromagnetic layers are each “entirely crystallized” when Petitioner relies only a thin layer, that is, a portion, of the 115 and 175 layers for the teaching that the respective layers are entirely crystallized. Put another way, Petitioner’s mapping is inconsistent: Petitioner relies upon the full depth of certain “layers” of Parkin for the teaching of the ferromagnetic layers, but then only relies upon thin portion of that depth for the assertion that the “layers” are entirely crystallized.” slip op. at 16

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,367,138
  • PTAB · Aug 29, 2025 · IPR2025-00479 · APJ Justin T Arbes · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–20 were obvious over Erskine, Scherzer, or Scherzer and Gillett.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “III. CONCLUSION Based on the arguments and evidence presented by the parties, we conclude that Petitioner has not demonstrated a reasonable likelihood of prevailing with respect to at least one claim of the ’634 patent challenged in the Petition. Therefore, we do not institute an inter partes review. IV. ORDER In consideration of the foregoing, it is hereby: ORDERED that the Petition is denied and no inter partes review is instituted.” slip op. at 25

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner argues that at the time of the ’634 patent (July 2018), a person of ordinary skill in the art would have had “a bachelor’s degree in electrical engineering, computer science, computer engineering, or a similar major with at least two years of experience in the field; or a master’s degree with specialization in the field,” where “[a] person with less education but more relevant practical experience may also meet this standard.” Pet. 7 (citing Ex. 1003 ¶¶ 12–13). Petitioner further argues that a person of ordinary skill in the art would have had knowledge of “[d]esigning and using systems that include endpoint devices (e.g., client devices) and servers for establishing network connections and data transfer,” “[r]ecognizing and applying the client-server architecture,” and “[u]sing and applying concepts from known telecommunication and networking frameworks, protocols and standards, including TCP/IP, IEEE 802.11, VoIP, cellular systems and other known frameworks and standards.” Id. (citing Ex. 1003 ¶ 14). Patent Owner does not address the level of ordinary skill in the art in its Preliminary Response. Based on the record presented, including our review of the ’634 patent and the types of problems and solutions described in the ’634 patent and cited prior art, we agree with Petitioner’s definition and apply it for purposes of this Decision. See, e.g., Ex. 1001, col. 1, ll. 4–29 (describing in the “Background” section of the ’634 patent a “network connection between two endpoints” and known methods of reaching “full effective bandwidth capacity” in a network).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Interpretation We interpret each challenged claim using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Petitioner notes that it proposed a construction for the claim term “geographical area” in the district court case, but states that it “do[es] not believe proposing a construction for the term is necessary in this proceeding because the relied upon teachings of the prior art references are consistent with examples of ‘geographical area’ included in the ’634 patent [S]pecification.” Pet. 8. Patent Owner argues that “[t]he Board need not engage in express claim construction at this stage of the proceeding.” Prelim. Resp. 5. We conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)).” slip op. at 9

    • BurdenNot shown unpatentable

      “Petitioner has not shown sufficiently that Erskine teaches or suggests the second requirement of limitation [1c], i.e., “initiating the next network connection . . . with a transmission bandwidth based on the parameter values for the past network connection.” Petitioner’s theory is that (1) the QoS parameters in Erskine are for a “past” connection from one zone to another, (2) the sliding maximum interzone bandwidth is “based on” the QoS parameters, and (3) a new call only proceeds if the transmission bandwidth needed for the call added to the current bandwidth being used over the interzone link is less than the sliding maximum interzone bandwidth, so Erskine therefore teaches a call with a transmission bandwidth determined “based on” the sliding maximum interzone bandwidth (which in turn is determined “based on” the QoS parameters). See Pet. 27–28; Ex. 1003 ¶¶ 59–60 (similar testimony from Dr. Crovella). As Patent Owner points out, however, Erskine only makes “a binary, accept/reject decision as to whether to allow a new call to proceed based on a comparison between the bandwidth needed for the call and a predetermined ‘sliding maximum interzone bandwidth value.’” See Prelim. Resp. 6–7. Specifically, the additional bandwidth that would be needed for the call is added to the current bandwidth being used on the interzone link; if the sum of those values is less than the sliding maximum interzone bandwidth for the link, the call “proceeds”; otherwise, it is “blocked.” Ex. 1004, col. 4, ll. 36–40, col. 6, l. 55–col. 7, l. 10, col. 8, ll. 36–43, col. 9, ll. 9–26, col. 10, ll. 23–25 (the sum is compared to the sliding maximum interzone bandwidth “to determine whether enough bandwidth is available to proceed with the new call”), Fig. 3 (steps 308, 310, and 312). Erskine repeatedly refers to the bandwidth for the new call as the amount of bandwidth that is “necessary” or “required” to handle the call. See, e.g., id. at col. 1, ll. 43–57 (“an amount of bandwidth necessary to handle the new call”), col. 6, ll. 61–64 (“the additional bandwidth required (of the new call)”), col. 8, ll. 36–40 (“the bandwidth necessary for the new call”), col. 9, ll. 16–21 (“the anticipated additional bandwidth necessary for the new call”), 54–56 (“the bandwidth amount the new call will utilize (if connected)”), col. 10, ll. 21–23 (same), 41–43 (same), col. 12, ll. 1–2 (“an amount of bandwidth necessary to handle the new call”). It is that value—determined prior to the addition and comparison to the sliding maximum interzone bandwidth—that will be used for the new call if it is allowed to “proceed[].” Id. at col. 6, ll. 64–67 (if the sum is less than the sliding maximum interzone bandwidth, the call “proceeds” and “the QoS table is updated with the additional bandwidth used by that call”). Erskine does not describe the transmission bandwidth for the new call as being based on any parameter values for a past network connection, but rather as “whatever bandwidth the system determined is necessary for the additional call.” See Prelim. Resp. 8–9. In other words, the transmission bandwidth needed for a new call is predetermined and independent of whatever the sliding maximum interzone bandwidth is currently. See id.” slip op. at 15

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,944,634
  • PTAB · Aug 25, 2025 · IPR2024-01270 · APJ Frances L Ippolito · IPR · Rehearing

    The Board denied Google’s rehearing request, leaving in place the denial of institution because the Petition did not show a reasonable likelihood that Belanger-Halevy teaches limitation [1C] of claims 1–26.

    RulingsRehearing decision
    • RehearingRehearing, deniedDenied

      “II. ANALYSIS A request for rehearing “must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, a reply or sur-reply.” 37 C.F.R. § 42.71(d). The party challenging a decision bears the burden of showing the decision should be modified. Id. We address Petitioner’s rehearing arguments below.” slip op. at 2

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “[m]issing, however, from Halevy’s disclosure is any teaching or suggestion that a ‘plurality of computer-readable field identifiers’ are mapped ‘to one another’ as required by claim 1.” Dec. 22. We discussed and quoted extensively from Petitioner’s expert declaration of Dr. Fox and Patent Owner’s expert declaration of Dr. Malek. Id. at 22–26 (citing Ex. 1003 ¶ 104; Ex. 2001 ¶¶ 69, 71). In reviewing the parties’ submissions, we found that: Halevy’s disclosures are consistent with Patent Owner’s arguments and Dr. Malek’s testimony that Halevy does not teach mapping fields to one another or mapping of fields to one another through SO-properties. For example, as described, in Figure 6 and Halevy as a whole, Halevy does not teach or suggest mapping or linking different keywords to one another, rather the keywords are mapped to SO-properties. slip op. at 5

    • Expert testimonyPatent owner expert creditedPetitioner expert discountedDecided for patent owner

      “Dr. Fox states that “Halevy’s disclosure of a form database in which corresponding fields from different forms on different websites map to the same SO-properties would have been recognized by a POSA as what the ’378 patent refers to as a universal variable map.” Ex. 1003 ¶ 108 (citing Ex. 1001, 17:42–46). Based on this conclusory opinion, Dr. Fox reasons that Halevy’s form database is a “universal variable map” that must also link computer-readable field identifiers (including parameter names) from multiple different websites to each other in the form database, because the field identifiers are mapped to the same SO-properties associated with an SO-class. Id. We observe first that Dr. Fox’s conclusion is not supported by the cited portions of the ’378 patent. In column 17, lines 42–46, the ’378 patent explains that fields or variables may be part of forms and variations of these data fields or variables “may include a source form, a destination form, a single source to many destination form, many sources to one destination form, cascading forms (e.g., a first form links to a second form which links to a third form, etc.) and so on.” Ex. 1001, 17:42–46. While this portion of the ’378 patent indicates that forms may include variations on fields or variables, it does not describe any linking or mapping of variables to one another. Ex. 2001 ¶ 76 (“[T]hat portion of the specification does not have anything to do with the definition of a “universal variable map.” Rather, it merely discusses different types of variables and fields that might appear in different types of forms.”). Dec. 28–29. We again referred to the disclosure of the ’378 patent to address evidence in the Petition relied upon by Dr. Fox to support Petitioner’s position. Id. We credited Dr. Malek’s testimony over Dr. Fox’s testimony because Dr. Malek underlined the distinctions between the asserted Belanger-Halevy prior art combination and limitation [1C]. Dec. 28–31. In short, any confusion applying the prior art Belanger-Halevy references to the claim limitation is rooted in the Petition. The Board denied the Petition because the Petition did not demonstrate a reasonable likelihood of showing that Belanger-Halevy discloses or teaches limitation [1C] of the ’378 patent.” slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “Finally, with regard to the Reply and Sur-Reply submitted by the parties (Req. 9), we note that our Decision on Institution reviewed the parties’ discussion of claim construction, but ultimately determined that “[b]ased on our review of the preliminary record, we do not need to construe any terms expressly to reach our decision.” Dec. 11. Thus, we disagree with Petitioner that we misconstrued the mapping limitation where we did not find it necessary to construe any claim term for the purposes of our institution decision because we determined the Petition deficient for failing to meet our threshold requirements as discussed above and in detail in the Decision on Institution. See Req. 1–11.” slip op. at 7

    Claim construction
    Patents in suitUS 9,633,378
Page 1 of 35
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.