- Alpinestars S.P.A. / Alpinestars USA Inc. v. Dainese S.P.A.Institution deniedPTAB · Oct 15, 2025 · IPR2025-00750 · APJ Benjamin D M Wood · IPR · Institution
The Board denied institution for claims 1–22 because Petitioner did not show a reasonable likelihood of prevailing on any of its three obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Because Petitioner has not shown a reasonable likelihood of establishing that one of ordinary skill in the art would have combined EP’536 (with or without Hatton) and CN’180 in the proposed manner, Petitioner has not shown a reasonable likelihood of prevailing with respect to claims 1 and 18. 5. Claims 2–17 and 19–22 Because Petitioner has not shown a reasonably likelihood of prevailing with respect to independent claims 1 and 18, Petitioner also has not shown a reasonable likelihood of prevailing with respect to the claims that depend therefrom (claims 2–17 and 19–22).” slip op. at 20
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner does not offer its own definition of the level of ordinary skill or dispute Petitioner’s definition. See generally Prelim. Resp. The level of ordinary skill in the art usually is evidenced by the references themselves. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). As Petitioner’s unchallenged description of an ordinarily skilled artisan appears consistent with the subject matter discussed in the references and that of the challenged claims, for purposes of this Decision we apply Petitioner’s description of a person of ordinary skill in the art.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Other
“For purposes of our analysis, we need only address the meaning of “planar structure,” and only to note that this limitation requires that all portions of the casing body, when inflated against the first mesh portion, second mesh portion, and tie elements, “form a planar structure” when the casing body is inflated. This is evident from both the claim language and the written description of the ’065 patent. Limitation [1e] of claim 1 recites that in the inflated condition, “said portions of the casing body” are “inflated against said first mesh portion, said second mesh portion, and said tie elements.” We understand “said portions of the casing body” to refer to all of the portions of the casing body. Likewise, “said first mesh portion, said second mesh portion, and said tie elements” refers to the entire mesh structure recited in limitation [1a]. Thus, this limitation requires all of the casing-body portions to inflate against the entire mesh structure to form the “planar structure.” This reading is consistent with the Specification. The Specification teaches that “[t]he first mesh portion and the second mesh portion together with the tie elements determine with the casing body the final shape of the inflatable element,” which “can reach a generally flat and planar final shape.” Ex. 1001, 4:19–23; see also id. at 4:59–5:3 (teaching that the casing body inflated within the mesh structure results in a “globally planar structure”). Here, “inflatable element” refers to the entire structure because it is comprised of the mesh structure and casing body. Id. at 3:11–18. Thus, the entire structure, when inflated, is “generally flat and planar.”” slip op. at 9
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner
“portions of the casing body, when inflated against the first mesh portion, second mesh portion, and tie elements, “form a planar structure” when the casing body is inflated. This is evident from both the claim language and the written description of the ’065 patent. Limitation [1e] of claim 1 recites that in the inflated condition, “said portions of the casing body” are “inflated against said first mesh portion, said second mesh portion, and said tie elements.” We understand “said portions of the casing body” to refer to all of the portions of the casing body. Likewise, “said first mesh portion, said second mesh portion, and said tie elements” refers to the entire mesh structure recited in limitation [1a]. Thus, this limitation requires all of the casing-body portions to inflate against the entire mesh structure to form the “planar structure.” This reading is consistent with the Specification. The Specification teaches that “[t]he first mesh portion and the second mesh portion together with the tie elements determine with the casing body the final shape of the inflatable element,” which “can reach a generally flat and planar final shape.” Ex. 1001, 4:19–23; see also id. at 4:59–5:3 (teaching that the casing body inflated within the mesh structure results in a “globally planar structure”). Here, “inflatable element” refers to the entire structure because it is comprised of the mesh structure and casing body. Id. at 3:11–18. Thus, the entire structure, when inflated, is “generally flat and planar.”” slip op. at 10
Claim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 12,012,065 - PTAB · Oct 14, 2025 · IPR2025-00747 · APJ Richard H Marschall · IPR · Institution
The Board denied institution because Buttiker was not prior art, so Petitioner did not show a reasonable likelihood that claims 5, 6, 9, or 10 were unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“establish a reasonable likelihood of proving that any of the challenged claims would have been obvious because all of the challenges rely on Buttiker for specific limitations, and Buttiker is not prior art to the challenged claims of the ’271 patent. Accordingly, Petitioner has not shown” slip op. at 16
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedDecided for patent owner
“When claiming the benefit of priority to a provisional application, the provisional application must provide written description support for the claims in question. See 35 U.S.C. § 119(e) (referring to “an invention 10 Petitioner does not dispute Patent Owner’s arguments on this point in its Preliminary Reply. See Prelim. Reply 2–4. disclosed in the manner provided by section 112(a)”); see also New Railhead Mfg., L.L.C. v. Vermeer Mfg. Co., 298 F.3d 1290, 1294 (Fed. Cir. 2002) (“[T]o be afforded the priority date of the provisional application, . . . the written description of the provisional must adequately support the claims of the non-provisional application.”). Patent Owner argues that the ’688 provisional application supports claims 5, 6, 9, and 10 of the ’271 patent because they describe the method of controlling the pumps and thermal modulators to achieve selected temperatures upstream of the brewing chamber and creating a resulting solvent used to infuse a solute, creating an infused beverage. See Prelim. Sur-reply 3–4 (citing Prelim. Resp. 16–18, 35–37; Ex. 1012, 12–15). Patent Owner also refers to Figure 2 of the ’688 provisional application, which discloses the device that performs the method described in the application. See id. at 4–5. With one exception that we address immediately below, Petitioner does not contest these assertions or argue that the ’688 provisional application fails to disclose the subject matter claimed in claims 5, 6, 9, and 10 of the ’271 patent. See Pet. 18–20; Prelim. Reply 2–4. Based on our review of the record, the ’688 provisional application provides adequate written description support for the challenged claims of the ’271 patent.11 See Ex. 1012, 11–15 (describing Figure 2 of the ’688 provisional application and related methods), Fig. 2.” slip op. at 12
- Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityReference not prior artPrinted publication establishedDecided for patent owner
“only qualify as prior art under section 102(a)(1) because section 102(a)(2) does not apply to purely foreign patent publications like Buttiker. See 35 U.S.C. § 102(a)(2) (describing scope of prior art as including “a patent issued under section 151” (addressing issued U.S. patents) and “an application for patent published or deemed published under section 122(b)” (addressing published U.S. applications)); MPEP § 2152 (“The documents upon which a prior art rejection under 35 U.S.C. 102(a)(2) may be based are U.S. patent documents only.”).10 Under section 102(a)(1), Buttiker may be prior art if it “was patented [or] described in a printed publication . . . before the effective filing date of the claimed invention.” 35 U.S.C. § 102(a)(1). Buttiker published after the ’688 provisional application was filed, but before the other applications to which the ’271 patent claims priority were filed. See Ex. 1010, 1; Ex. 1001, code (60). Accordingly, whether the ’271 patent claims at issue here have adequate support in the ’688 provisional application determines whether Buttiker is prior art to those claims because Buttiker’s publication predates later applications to which the ’271 patent claims priority.” slip op. at 12
- Disclosure Requirements (§112) › Written description (Ariad)Written description adequateDecided for patent owner
“When claiming the benefit of priority to a provisional application, the provisional application must provide written description support for the claims in question. See 35 U.S.C. § 119(e) (referring to “an invention 10 Petitioner does not dispute Patent Owner’s arguments on this point in its Preliminary Reply. See Prelim. Reply 2–4. disclosed in the manner provided by section 112(a)”); see also New Railhead Mfg., L.L.C. v. Vermeer Mfg. Co., 298 F.3d 1290, 1294 (Fed. Cir. 2002) (“[T]o be afforded the priority date of the provisional application, . . . the written description of the provisional must adequately support the claims of the non-provisional application.”). Patent Owner argues that the ’688 provisional application supports claims 5, 6, 9, and 10 of the ’271 patent because they describe the method of controlling the pumps and thermal modulators to achieve selected temperatures upstream of the brewing chamber and creating a resulting solvent used to infuse a solute, creating an infused beverage. See Prelim. Sur-reply 3–4 (citing Prelim. Resp. 16–18, 35–37; Ex. 1012, 12–15). Patent Owner also refers to Figure 2 of the ’688 provisional application, which discloses the device that performs the method described in the application. See id. at 4–5. With one exception that we address immediately below, Petitioner does not contest these assertions or argue that the ’688 provisional application fails to disclose the subject matter claimed in claims 5, 6, 9, and 10 of the ’271 patent. See Pet. 18–20; Prelim. Reply 2–4. Based on our review of the record, the ’688 provisional application provides adequate written description support for the challenged claims of the ’271 patent.11 See Ex. 1012, 11–15 (describing Figure 2 of the ’688 provisional application and related methods), Fig. 2.” slip op. at 12
§ 102 anticipation§ 103 obviousness§ 112 disclosurePatents in suitUS 11,957,271 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Western Digital Technologies, Inc. v. Godo Kaisha IP Bridge 1Institution deniedPTAB · Oct 8, 2025 · IPR2025-00701 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–14 were obvious over the asserted combinations.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’138 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 1–14 of the ’138 patent.” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner states that “the claim terms should be given their plain and ordinary meaning and no claim construction is necessary to find the claims unpatentable.” Pet. 6. Patent Owner does not address claim construction. See generally Prelim. Resp. We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 8
- Skill levelSkill level petitioner adoptedOther
“a Ph.D. or master’s degree in electrical engineering, physics, materials science, or a related field, and at least one year or four years, respectively, of experience in the research, design, and/or development of magnetic/spintronic devices, or the equivalent. Pet. 8 (citing Ex. 1024 ¶¶ 25–29). Petitioner contends that less work experience can be compensated for by a higher level of experience and vice versa. Id. (citing Ex. 1024 ¶ 25). Petitioner also asserts that the proposed level of skill would be the same under any of the United States, Japanese, or PCT application dates. Id. at 8–9 (citing Ex. 1024 ¶¶ 24–25). Patent Owner does not challenge Petitioner’s proposed level of qualifications for one of ordinary skill in the art. Prelim. Resp. 20. At this stage of the proceeding, we adopt Petitioner’s assessment of the level of skill in the art, which is consistent with the ’138 patent and the asserted prior art of record.” slip op. at 7
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable
“As discussed above, Petitioner relies upon Parkin, and its layers 115 and 175, as the claimed first and second ferromagnetic material layers, respectively. See Pet. 10, 16. Petitioner admits that these layers are 8 In the Petition, Petitioner refers to the lower electrode “ferromagnetic layer 110’ as discussed in Claim 1[a]” in the discussion of limitation 1[d]. Pet. 18. Petitioner’s reference to “layer 110’” appears to be in error because the Petition’s discussion for limitation 1[a] refers to layer 115 of Parkin, as does Dr. Bokor’s testimony related to limitations 1[a] and 1[d]. Pet. 10; Ex. 1024 ¶¶ 109, 136. amorphous, but contends that, as Parkin discloses, these layers may be annealed. Id. at 17. Petitioner, however, refers to Parkin’s disclosure that only “a portion of the storage layer 175” is crystallized after annealing. Id. at 17–18 (citing Ex. 1062, 18:51–55) (emphasis added). Petitioner also relies upon Parkin’s “thin crystalline ferromagnetic layer” that is crystallized to teach limitation 1[d]. Id. at 18 (citing Ex. 1062, 18:55–59; Ex. 1024 ¶¶ 131–132) (emphasis added). Dr. Bokor additionally testifies that it is “Parkin’s ‘thin crystalline ferromagnetic layer’ of CoFeB” that meets the “entirely crystallized” requirement of limitation 1[d]. Ex. 1024 ¶ 132. Parkin, however, states that a thin crystalline ferromagnetic layer is formed, but “the bulk of storage layer 175 remains amorphous.” Ex. 1062, 18:55–60 (emphasis added). Petitioner fails to reconcile how its assertions that the first and second ferromagnetic layers, which are mapped to the totality of layers of 115 and 175, meet the limitation that the first and second ferromagnetic layers are each “entirely crystallized” when Petitioner relies only a thin layer, that is, a portion, of the 115 and 175 layers for the teaching that the respective layers are entirely crystallized. Put another way, Petitioner’s mapping is inconsistent: Petitioner relies upon the full depth of certain “layers” of Parkin for the teaching of the ferromagnetic layers, but then only relies upon thin portion of that depth for the assertion that the “layers” are entirely crystallized.” slip op. at 16
Claim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,367,138 - Shenzhen Tuozhu Technology Co. Ltd. v. Stratasys, Inc.Institution deniedPTAB · Oct 6, 2025 · IPR2025-00585 · APJ Lilan Ren · IPR · Institution
The Board denied institution on claims 1–6, 10–19 because claim 1’s scope is ambiguous and the petition did not show a reasonable likelihood of prevailing on any asserted obviousness ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“review. See 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). Institution of an inter partes review requires that “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons set forth below, we determine that the scope of claim 1 is ambiguous and that there is not a reasonable likelihood that Petitioner will prevail with respect to at least one challenged claim, and we deny inter partes review.1” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownOther
“distinguishes and contrasts build material property from operational parameters. The diagnostic test passage therefore only describes a diagnostic test of the build material property but does not describe a subsequent diagnostic test to assess whether an operational parameter is suitable for the printer. Based solely on the diagnostic test passage and the prosecution history, a possible interpretation may be that the operational parameter determination in claim element 1b encompasses the diagnostic testing in claim element 1c. That is, “performing a diagnostic test to determine whether the operational parameter is suitable for the three-dimensional printer” in claim element 1c is subsumed as part of “determining an operational parameter of a fabrication process using the three-dimensional printer based upon the data, the operational parameter including at least one of a build platform temperature, a build volume temperature, an infill requirement, a rafting requirement, a support structure requirement, and a cooling requirement” in claim element 1b.” slip op. at 15
- Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateOther
“benefit of the filing date of an earlier filed application only if the disclosure of the earlier application provides support for the claims of the later application, as required by 35 U.S.C. § 112.” PowerOasis, Inc. v. T-Mobile USA, Inc., 522 F.3d 1299, 1306 (Fed. Cir. 2008); see also Research Corps. Techs. v. Microsoft Corp., 627 F.3d 859, 871–72 (Fed. Cir. 2010) (holding that claims of the later-filed application, which were not limited to a “blue noise mask,” were “not entitled to claim the benefit of their parent applications’ filing dates”); ICU Med., Inc. v. Alaris Med. Sys., 558 F.3d 1368, 1377–78 (Fed. Cir. 2009) (holding that “spikeless” claims “added years later during prosecution” were not supported by the specification which “describe[d] only medical valves with spikes”); Tronzo v. Biomet, Inc., 156 F.3d 1154, 1158–60 (Fed. Cir. 1998) (holding the generic shaped cup claims of the later-filed child application were not entitled to the filing date of the parent application that “disclosed only a trapezoidal cup and nothing more”). “To satisfy the written description requirement the disclosure of the prior application must convey with reasonable clarity to those skilled in the art that, as of the filing date sought, [the inventor] was in possession of the invention.” PowerOasis, 522 F.3d at 1306 (emphasis omitted; alteration in original). The sufficiency of written description support is based on “an objective inquiry into the four corners of the specification from the perspective of a person of ordinary skill in the art.” Ariad Pharm., Inc. v. Eli Lilly & Co., 598 F.3d 1336, 1351 (Fed. Cir. 2010) (en banc).” slip op. at 20
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that a person of ordinary skill in the art in the field in the relevant time frame would have had “(1) at least a bachelor’s degree in Mechanical Engineering, Computer Engineering, Chemical Engineering, Materials Science, or a related field, and (2) at least two years of research or industry experience in 3D printing or materials used for 3D printing.” Pet. 5 (citing Ex. 1003 ¶ 20). Petitioner also contends that “[a]dditional experience could substitute for a formal degree or formal training (and vice versa).” Id. (citing the same). Patent Owner contends that an ordinarily skilled artisan “would have had a bachelor’s degree in Mechanical Engineering, Computer Engineering, Electrical Engineering, Chemical Engineering, Materials Science, or a comparable field and at least two years of experience related to 3D printing, with additional experience potentially being a substitute for a formal degree or training (and vice versa).” Prelim. Resp. 12. For purposes of this decision, we adopt Petitioner’s definition of the level of ordinary skill in the art as it appears unopposed and consistent with the disclosures of the ’464 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 9
Claim construction§ 112 disclosurecites Phillips · KSR · GrahamPatents in suitUS 11,167,464 - Alliance Laundry Systems, LLC v. Payrange LLCInstitution deniedPTAB · Oct 1, 2025 · IPR2025-00573 · APJ Meredith C Petravick · IPR · Institution
The Board denied institution because the Petition did not show a reasonable likelihood that claims 7 or 11 were unpatentable under the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition, the Preliminary Response, and the evidence of record, we determine the information presented fails to show a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the challenged claims of the ’772 patent. Accordingly, we do not institute an inter partes review of claims 7 and 11 of the ’772 patent on the grounds asserted in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends a person having ordinary skill in the art (“POSA”) pertaining to the ’772 patent “would have had an educational background of, engineering, computer engineering, computer science, or equivalent training, and approximately three years of experience with electronic payment systems, vending machine technologies, or distributed network systems.” Pet. 19–20; Ex. 1003 ¶¶ 20–26. “Lack of work experience can be remedied by additional education, and vice versa.” Pet. 20; Ex. 1003 ¶ 22. Patent Owner does not oppose Petitioner’s formulation of ordinary skill. See Prelim. Resp. generally. On this record, we adopt Petitioner’s assessment of the level of ordinary skill in the art as it is consistent with the ’772 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“In this inter partes review, we apply the same claim construction standard that would be used in a civil action under 35 U.S.C. § 282(b). 37 C.F.R. § 42.100(b). In applying this standard, we generally give claim terms their ordinary and customary meaning as would be understood by a person of ordinary skill in the art at the time of the invention and in the context of the entire patent disclosure. See id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–14 (Fed. Cir. 2005) (en banc). We do not need to construe any terms expressly to determine whether or not to institute a trial. See Realtime Data LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached
Claim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,481,772 - Røde Microphones, LLC / Freedman Electronics Pty Ltd. v. Zaxcom, Inc.Institution deniedPTAB · Sep 30, 2025 · IPR2025-00557 · APJ Justin T Arbes · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that the challenged claims were unpatentable over the asserted obviousness combinations.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Based on the record before us, Petitioner has not shown sufficiently that Strub teaches or suggests “a remote receiver, the remote receiver configured to create at least one master timecode and to receive audio data,” as recited in claim 1. Accordingly, Petitioner has not shown a reasonable likelihood of prevailing on its assertion that claim 1 is unpatentable over Strub and Woo.” slip op. at 26
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“We agree with Patent Owner that the “master timecode generator” produces a signal that “controls” another timecode generator. See Prelim. Resp. 19 (citing a dictionary definition of “master” as “[one] that has control over another or others,” Ex. 2019, 3). We see no basis, however, to limit the claim term to a particular type of control. Patent Owner points to Figure 6 of the ’444 patent where “the master timecode generator creates master timecodes that are used to control the speed of the local timecode generator to ensure the two timecode generators are synchronized.” See Prelim. Resp. 19‒20 (citing Ex. 1001, col. 17, ll. 9‒16, Fig. 6). But Figure 6 merely depicts an exemplary “process for recording audio and for replaying and re-recording segments of missed audio in accordance with one embodiment of the present invention.” See Ex. 1001, col. 3, ll. 15‒17. Further, the Specification describes the exemplary embodiment of Figure 6 as a master unit providing master timecodes to a local audio device, which “synchronizes (e.g., jam syncs) its respective on board local timecode generator with the master timecodes,” but does not specify exactly how the master unit exercises control. Id. at col. 17, ll. 9‒17. Thus, we do not include any particular control mechanism (e.g., changing the speed of the local timecode generator) in our interpretation at this time. Based on the record presented, we interpret “master timecode generator” as “a producer of a master time reference signal that controls at least one other timecode generator” and “master timecode” as “a time reference signal used to synchronize at least one device.”” slip op. at 12
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableNot shown unpatentable
“We agree with Patent Owner that Petitioner has not sufficiently shown that Strub teaches or suggests limitation 1[A]. Petitioner relies on Strub’s disclosure of a “master” recording unit as the claimed “remote receiver.” Pet. 34 (citing Ex. 1003, col. 38, ll. 29‒39). The cited portion of Strub is reproduced below: Data other than recording data can also be exchanged between recording units. For example, it may be desirable to coordinate the recordings obtained by recording units so that frames of visual recording data obtained by different recording units are temporally synchronized (e.g., so that a frame begins at the same time for each recording unit). This can be done by transmitting a synchronization pulse from a “master” recording unit to each of the other recording units (“slave” recording units). (Synchronizing analog visual data acquisition devices in this way is referred to as “genlocking.”) Ex. 1003, col. 38, ll. 29‒39. As argued by Patent Owner (see Prelim. Resp. 36), the cited procedure involves synchronizing frames of visual recording data, not audio recording data. Petitioner has not disputed Patent Owner’s assertions that the described “genlocking” technique is a video synchronization technique that does not apply to or affect the synchronization of system clocks or audio timestamps and has no bearing on audio synchronization. Nor does Petitioner explain in the Petition or the Preliminary Reply how or why an ordinarily skilled artisan would have applied this teaching to audio data recorded by an audio device. Petitioner cites this visual recording data synchronization passage as a solution to a problem that Strub identifies in clocks not being adequately synchronized to enable use of time-stamps associated with recordings to be used to synchronize the recordings. See Prelim. Reply 1‒2 (citing Ex. 1003, col. 38, ll. 29‒37, col. 79, l. 63‒col. 80, l. 2). However, immediately following the cited portion that identifies this problem, Strub further explains that “[i]f recording units according to the invention each include a GPS receiver, such mis-synchronization will only exist to an appreciable degree if one or more recording units are shielded from a GPS transmitter system for an extended period of time, e.g., several hours.” Ex. 1003, col. 80, ll. 2–27. Thus, Strub suggests that the solution to this problem is for the recording units to receive their timecodes not from a master recording unit, as argued by Petitioner, but from a GPS satellite.4 Petitioner does not address this teaching.” slip op. at 22
- BurdenNot shown unpatentable
“We agree with Patent Owner that the Petition does not rely on Woo as teaching or suggesting limitation 1[A]; Petitioner relies solely on the teachings of Strub. See Pet. 33–35 (arguing that “Strub teaches this element”). Petitioner references Strub’s teachings as being “consistent with and reinforced by the Woo reference” in the Preliminary Reply (Prelim. Reply 2), but this is not sufficient to rely on Woo, alone or in combination with Strub, as teaching this limitation. We also agree that the Lectrosonics IPRs’ findings regarding Woo teaching the “master timecode generator” limitation recited in those challenged claims are inapplicable here, where claim 1 recites additional limitations not present in those challenged claims. Compare Ex. 1001, col. 43, ll. 26‒27 (claim 1 of the ’444 patent: “a remote receiver, the remote receiver configured to create at least one master timecode and to receive audio data”) with Ex. 1028, col. 23, ll. 20‒21 (claim 1 of the ’814 patent: “at least one master timecode generator for generating a plurality of master timecodes”) and Ex. 1030, col. 23, ll. 38‒39 (claim 1 of the ’902 patent: “at least one master timecode generator for generating a plurality of master timecodes”). Based on the record before us, Petitioner has not shown sufficiently that Strub teaches or suggests “a remote receiver, the remote receiver configured to create at least one master timecode and to receive audio data,” as recited in claim 1. Accordingly, Petitioner has not shown a reasonable likelihood of prevailing on its assertion that claim 1 is unpatentable over Strub and Woo.” slip op. at 26
Claim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 12,051,444
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.